|
|
Project Details
|
Project Name |
:
|
The Residency-City Centre Patna
|
Project Description |
:
|
Proposed residential building of Utkarsh Sfatik Ltd at Patna
|
|
Project Type
|
:
|
Residential/Group Housing
|
Project Status
|
:
|
Completed
|
|
Reason for delayed |
:
|
|
No. of month (Delayed) |
:
|
|
|
Project Start Date |
:
|
01-06-2012
|
Project End Date |
:
|
30-03-2022
|
|
Total Area of Land (Sq mt) |
:
|
8102.60
|
Total Open Area (Sq. Mtr.) |
:
|
6237.98
|
|
Total Covered Area (Sq Mtr) |
:
|
1864.62
|
Total Builtup Area (Sq. Mtr.) |
:
|
25778.15
|
|
If development is in phases |
:
|
0
|
No. of Phases
|
:
|
0
|
|
|
|
|
Current Phase Area (Sq. Mtr.)
|
:
|
0.00
|
|
Estimated cost of development (In Lakh) |
:
|
3447.38
|
Estimated cost of land (In Lakh) |
:
|
215.81
|
|
Project Address
|
:
|
Lodhipur, Budha Marg, Patna
|
District |
:
|
Patna
|
|
Khesra No./Plot No. |
:
|
On a portion of plot nos. 157, 158, 159-P, 160, 161, 162 AND 60-P
|
|
Anchal |
:
|
Patna Sadar
|
Mauja |
:
|
अङरा
|
|
Village |
:
|
Lodhipur
|
City/Town |
:
|
Patna
|
|
Boundaries (East) |
:
|
Proposed commercial phase of City Centre Patna
|
Boundaries (West) |
:
|
Pucca boundary wall and Christen Colony
|
|
Boundaries (North) |
:
|
Different municipal plots and Pucca boundary wall, thereafter part of Christen colony
|
Boundaries (South) |
:
|
Pucca boundary wall and thereafter China Kothi
|
|
Latitude of End point of the plot |
:
|
25.375
|
Longitude of End point of the plot |
:
|
85.083
|
|
No. of Garages Available for Sale |
:
|
0
|
Total Area of Garages (Sq Mtr) |
:
|
0.00
|
|
No. of Open Parking |
:
|
71
|
Total Area of Open Parking (Sq Mtr) |
:
|
1389.74
|
|
No. of Covered Parking |
:
|
8
|
Total Area of Covered Parking (Sq Mtr) |
:
|
159.50
|
|
Land Ownership Details |
:
|
By a deed of absolute sale dated 8/12/2008 registered as deed no. 20162 in book no. 1, Vol no. 322 in pages from 501 to 532, CD vol.no. 52 registered in the office of Dist. Registrar Patna, the applicant became the owner of piece and parcel of Total Land measuring about 7.52 acres situated in municipal survey plot nos. 157, 158, 159-P, 160, 161, 162 and 60-P, holding nos. 201, 202 and 203(previously 223, 224, 225 respectively) within PMC ward no. 27 (previously ward no. 1). The instant project is being developed on a demarcated portion of 8102.60 Sqmtr of the total land above mentioned.
|
Proposed Period of Completion (In Month) |
:
|
34
|
|
Permissible FAR |
:
|
2.50
|
Sanctioned FAR |
:
|
2.49
|
|
Proposed No of Building or Wing |
:
|
2
|
Sanctioned No of Building(s) or Wing(s) |
:
|
2
|
|
Aggregate area of the recreational open space |
:
|
2498.11
|
Architecture/Design standards used |
:
|
PMC By-laws 2018
|
|
Type of construction technology used |
:
|
RCC Framed Construction
|
Earthquake resistant measures adopted for building and common areas |
:
|
As per IS 13920
|
|
Height of Building (Mtr.) |
|
|
Coverage Area (Sqr. Mtr.) |
:
|
|
|
|
| Name of Building | Sanctioned No of Floor | Type of Apartment | No of Apartment | Carpet Area | Area of exclusive balcony | Area of exclusive open terrace |
| Tower-A | G+17 | 4 BHK | 1 | 2413.00 | 248.00 | 0.00 |
| Tower-A | G+17 | 3 BHK | 1 | 1327.00 | 167.00 | 0.00 |
| Tower-A | G+17 | 6 BHK | 1 | 3141.00 | 510.00 | 0.00 |
| Tower-A | G+17 | 3 BHK | 1 | 1184.00 | 153.00 | 0.00 |
| Tower-A | G+17 | 3 BHK | 1 | 1159.00 | 150.00 | 0.00 |
| Tower-A | G+17 | 3 BHK | 16 | 19728.00 | 2448.00 | 0.00 |
| Tower-A | G+17 | 3 BHK | 16 | 20000.00 | 1488.00 | 0.00 |
| Tower-A | G+17 | 4 BHK | 16 | 26144.00 | 3360.00 | 0.00 |
| Tower-A | G+17 | 3 BHK | 16 | 19344.00 | 2400.00 | 0.00 |
| Tower-A | G+17 | 3 BHK | 8 | 10616.00 | 1336.00 | 0.00 |
| Tower-B | G+17 | 4 BHK | 1 | 2391.00 | 148.00 | 0.00 |
| Tower-B | G+17 | 5 BHK | 1 | 2837.00 | 157.00 | 68.00 |
| Tower-B | G+17 | 3 BHK | 16 | 23184.00 | 2288.00 | 0.00 |
| Tower-B | G+17 | 3 BHK | 16 | 24000.00 | 2288.00 | 0.00 |
| Tower-B | G+17 | 4 BHK | 8 | 19128.00 | 1352.00 | 0.00 |
| Tower-B | G+17 | 4 BHK | 8 | 19128.00 | 1184.00 | 0.00 |
|
|
|
Road System |
:
|
Local Authority
|
Water Supply |
:
|
Local Authority
|
|
Sewage and Drainage System |
:
|
Local Authority
|
Electricity Supply Transformer And Sub Station |
:
|
Local Authority
|
|
Solid Waste Management and Disposal |
:
|
Local Authority
|
|
|
|
|
Account Holder Name |
:
|
|
|
|
|
|
Bank Name |
:
|
Ratnakar Bank Ltd
|
Branch Name |
:
|
Thapar House, 25 Brabourne Road, Kolkata
|
|
Account No. |
:
|
409001025508
|
IFSC Code |
:
|
RATN0000161
|
|
Bank Address |
: |
{"IMPS":true,"CITY":"KOLKATA","BRANCH":"KOLKATA-THAPAR HOUSE","CONTACT":"9833666862","RTGS":true,"DISTRICT":"KOLKATA","ADDRESS":"THE RATNAKAR BANK LTD,FIRST FLOOR,THAPAR HOUSE,25 BARBOURNE ROAD,KOLKATTA – 700001","STATE":"WEST BENGAL","MICR":"","CENTRE":"KOLKATA","NEFT":true,"BANK":"RBL Bank","BANKCODE":"RATN","IFSC":"RATN0000161"}
|
|
State |
:
|
West Bengal
|
District |
:
|
Kolkata
|
|
Scan copy of Bank Pass Book/ Statement |
:
|
View
|
|
|
|
| Vendor Type | Name | Address | State | District | Year of Establishment | Key Project |
| Architects | SALIENT | Ecostation, BP-7, 8th Floor, sector V, Salt Lake City, Kolkata | West Bengal | Bankura | 2005 | City Centre-Raipur, City Centre-Haldia, Anaya Kutir-Raichak, Frengipani-Raichak, Club Montana Vista-Siliguri, Auto Mall-Newtown, Media City-Salt Lake, Holiday Inn-Uluberia, Kolkata Police Housing |
| Engineers | M. N. Consultants Pvt. Ltd. | MNC House, 1516, Rajdanga Main Road, Kolkata 700107 | West Bengal | Bankura | 1989 | Atmosphere-Kolkata, Godrej Platinum-Kolkata, Siddha Suburbia-Kolkata, Vatika Seeven Elements, Tata Eden Court |
| Contractors | Simples Infrastructures Limited | Simplex House, 27, Shakespeare Sarani, Kolkata | West Bengal | Bankura | 1924 | Airport Terminal-Udaipur, Imphal High Court Building, Beaumonde Towers-Mumbai |
|
| Sanctioned Building Plan (MAP) approved by : |
|
Date of approval (MAP) : |
|
| Period of approval (MAP) : |
|
|
|
| NOC approved by : |
|
Date of approval (NOC) : |
|
|