Date of Notice | Description |
28 Feb 2023 | Extension of period of registration for participation in the Awareness workshop to be organised only for Home Buyers. |
21 Feb 2023 | General Amnesty Scheme to safeguard the interest of allottees of such project where promoter failed to submit application for extension of their project during the prescribed period. |
10 Feb 2023 | Real Estate Agents(Company and Firm) to submit reports on transaction of plots/flats etc. |
03 Feb 2023 | Registration for Participation in the Awareness workshop to be organised only for Home Buyers. |
23 Jan 2023 | Regarding imposition of penalty on promoters who have not submitted Quarterly Progress Report(QPR) on time. |
23 Jan 2023 | Promoters of such projects are required to upload the completion certificate as provided in the Bihar Building Byelaws, 2014. |
04 Jan 2023 | Office Order : Promoter also need to upload the sorce of finance once in a year on the webpage of concerned project created on the website of RERA, Bihar. |
04 Jan 2023 | Promoter has to give details of the project undertaken in the last five along with other information. |
15 Dec 2022 | Notice Inviting Quotations : 1. Wall Calendar of Calender Year 2023 Real Estate Regulatory Authority on Art paper of 130 GSM containing Six leaves (12 pages) Size 15' X 20' multicolour as per design which includes logo and other items with 12 months calendar indicating Saturday/Sunday/Other holidays/Restricted holidays etc. as declared by Govt. of Bihar Number of calendars with spiral winding and hook will be 1200 (One Thousand Two Hundred Only) |
18 Nov 2022 | Information/Documents to be Uploaded by Promoter on the Website. |
26 Oct 2022 | Regarding online arrangement to submit the application for the extension of the completion dates of the registration of project. |
26 Oct 2022 | Office Order No. 98 dated 10/10/2022 issued Regarding General Amnesty Scheme to safeguard the interest of allottees of such project where promoter failed to submit application for extension of their project during the prescribed period. |
10 Oct 2022 | Standard Operating Procedure (SOP) for separate A/C to be opened under Section 4(2)(l)(D) of Real Estate (Regulation and development) Act, 2016. |
10 Oct 2022 | General Amnesty Scheme to safeguard the interest of allottees of such projects where promoter failed to submit application for extension of their project during the prescribed period. |
31 Aug 2022 | Extension of last date of submission of application for the position of Court Master on short term contract basis. |
31 Aug 2022 | General Notice : It has been decided that no complaint case would be entertained before the Authority. |
26 Aug 2022 | Order under section 7(3) of Real Estate (Regulation and Development) Act, 2016 against the Project "Sai Enclave" of Anu
Anand Construction Pvt. Ltd.
|
04 Aug 2022 | Extension of last date of online submission of application for the position of Legal Executive on short term contract basis. |
04 Aug 2022 | Notice for Hiring of Retired Personnel for the position of Court Masters on Short Term Contract Basis. |
19 Jul 2022 | Regarding Reward Scheme for those providing authentic information about violation of the Real Estate (Regulation and Development) Act, 2016. |
06 Jul 2022 | Disclosing the share of Promoter in the Project through Affidavit. |
06 Jul 2022 | Regarding treatment of abandoned projects where promoters are not serious about getting the projects registered. |
06 Jul 2022 | Regarding discontinuance of levying late fees in case of registration of Ongoing projects. |
06 Jul 2022 | Submission of documents and information on Affidavit by the Promoter in case of completion of Project and where
Occupancy Certificate is not issued by the competent authority. |
29 Jun 2022 | Hiring of Legal Executive on Short Term Contract Basis. |
15 Jun 2022 | पाटलिपुत्र एनाक्लेभ प्रोजेक्ट के विरुद्ध दायर शिकायतकर्ता को तत्काल उपलध राशि में से उनके द्वारा जमा की गयी राशि का २९% वापस करने का निर्णय लिया गया है. |
13 Jun 2022 | Extension of last date of submission of application for the position of Registrar(Legal) on short term contract basis. |
08 Jun 2022 | GENERAL NOTICE : It has been observed from the Quarterly Progress Report of some projects that all works have been completed. |
07 Jun 2022 | अग्रणी रुद्रा प्रोजेक्ट के बिरुद्ध दायर निम्नांकित वाद के शिकायतकर्ता को तत्काल उपलब्ध राशि में से उनके द्वारा जमा की गयी राशि का 14 % राशि वापस करने का निर्णय लिया गया है | |
06 Jun 2022 | आम सूचना : धारा ३ के प्रावधान के अनुसार कोई भी प्रवर्तक बगैर निबंधन कराये आठ आपार्टमेंट की संख्या से अधिक या ५०० वर्ग मीटर कुल क्षेत्रफल से अधिक की परियोजना का विज्ञापन या बिक्री नहीं कर सकते है| |
03 Jun 2022 | Extension of last date of submission of application for the positions of Court Masters on Short term Contract Basis extended till 15-06-2022. |
02 Jun 2022 | HIRING OF STENOGRAPHER (ENGLISH/HINDI) ON SHORT TERM CONTRACT BASIS. |
02 Jun 2022 | “पाटलिपुत्र एन्क्लेभ प्रोजेक्ट” के बिरुद्ध दायर निम्नांकित वाद के शिकय्त्कार्त्ता को तत्काल उपलब्ध राशि में से उनके द्वारा जमा की गयी राशि का 29% राशि वापस (Refund) करने का निर्णय लिया गया है. |
31 May 2022 | General Notice : Those allottees/complainants who have filed case in the year 2021 but whose matters have not yet been listed before nay bench of the Authority, may apply, if they so desire, for resolution of their dispute through conciliation. |
25 May 2022 | General Notice : All concerned complainants are hereby informed to file proof of such application along with their complaint and
other documents filed with the promoters. |
25 May 2022 | सार्वजनिक सूचना : सभी सबंधित शिकायतकर्ताओ को सूचित किया जाता है कि वे शिकायत और अन्य दस्तावेज के साथ इस तरह के आवेदन साक्ष्य के रूप में दाखिल करे, अन्यथा आपके शिकायत आवेदन को ख़ारिज किया जा सकता है| |
20 May 2022 | “पाटलिपुत्र एन्क्लेभ प्रोजेक्ट” के बिरुद्ध दायर निम्नांकित वाद के शिकय्त्कार्त्ता को तत्काल उपलब्ध राशि में से उनके द्वारा जमा की गयी राशि का ५०% राशि वापस (Refund) करने का निर्णय लिया गया है:- |
20 May 2022 | “शिव इन्दु भवन (अग्रणी पाटलिपुत्रा रेसीडेंसी) प्रोजेक्ट” के बिरुद्ध दायर निम्नांकित वाद के शिकय्त्कार्त्ता को तत्काल उपलब्ध राशि में से उनके द्वारा जमा की गयी राशि का ३०% राशि वापस (Refund) करने का निर्णय लिया गया है. |
18 May 2022 | The last date of submission of application for the short-term appointment on the position of special Secretary has now been extended till 31st May 2022. |
18 May 2022 | Hiring of Registrar (Legal) On Short Term Contract Basis. |
06 May 2022 | Hiring of court Masters on short term contract basis. |
04 May 2022 | Notice : Real Estate Regulatory Authority can take action against complaint file under Section 31 of RERA Act,2016 |
30 Apr 2022 | Extension of date for written Test and Oral Test for the position of Graduate Civil Engineer/Graduate of Architecture/Master of Finance and Account Internship |
29 Apr 2022 | Hiring of Retired Officer of Indian Administrative Service/State Administrative Service Cadre as "Special Secretary" on Short term contract basis. |
25 Apr 2022 | Bihar State RERA FAQs. |
21 Apr 2022 | Extension of last date of submission of application for the positions Consultant Finance, Technical Officer(Civil), Hindi Translator, Accounts Executive, Account Manager on Short term contract Basis. |
09 Apr 2022 | Guidelines for execution filing. |
08 Apr 2022 | Bihar Real Estate Regulatory Authority (BRERA) Conciliation and Dispute Resolution Cell. |
08 Mar 2022 | Notice : All matters listed before the Honorable Single Bench, Double Bench & Execution Bench of Authority has been adjourned from 2nd of March, 2022 till 31 March 2022. |
24 Feb 2022 | Important Notice :The documents submitted without case number and before and the office hours would not be entertained. |
24 Feb 2022 | Quarterly Progress Report for quarter ending March/June/Sept/December Formats. |
07 Feb 2022 | सूचना : यह सूचना जनहित में जरी की जा रही है की किसी अनाधकृत व्यक्ति के द्वारा स्थानीय जाँच पुर्णतः अनधिकृत है | |
28 Jan 2022 | विभिन्न परियोजनाओं के संदर्भ में अग्रणी होम प्राइवेट लिमिटेड द्वारा प्राप्त पत्र। |
20 Jan 2022 | Appeal No. 58/2021, MS Hira Panna Infra Projects LLP, order passed by Appellate Tribunal, Bihar. |
13 Dec 2021 | Office Order : The period of validity for registration and completion of such projects is extended by Nine Months. |
30 Nov 2021 | JOINT-AFFIDAVIT-CUM-UNDERTAKING FORMATS |
29 Oct 2021 | Notice : Regarding approval of regitration/extension of registration of projects falling within/outside planning area. |
11 Oct 2021 | Hiring of Stenographer (English) on short term contract basis. |
08 Oct 2021 | Show Cause Notice under Section 7 (1) for Revocation of registration of the Project by Sri Anu Anand Construction Pvt.Ltd. |
05 Oct 2021 | Hearing of cases with effect from 25/10/2021 in a hybrid mode wherein allottees and their counsel will have option to join either online or in physical mode. |
01 Oct 2021 | HIRING OF TECHNICAL OFFICER (CIVIL) ON SHORT TERM CONTRACT BASIS. |
29 Sep 2021 | Submission of Quarterly Progress Reports by the Promoters of Registered Real Estate Projects. |
29 Sep 2021 | Show Notice for Revocation of Registration under Section 7 of the Real Estate (Regulatory and Development ) Act 2016 and levy of
penalty under section 60 of the Act for non-compliance of the section 4 of the Act.
|
20 Sep 2021 | Hiring of Nazir and Court Masters on Short Term Contract Basis. |
20 Sep 2021 | Notice for Empanelment of Advocates in the Panel of RERA, Bihar |
19 Sep 2021 | HIRING OF CONSULTANT, FINANCE ON SHORT TERM CONTRACT BASIS. |
18 Sep 2021 | Show Cause Notice under Section 7 (1) for Revocation of registration of the Project by Concicon Pvt. Ltd. |
15 Sep 2021 | Hiring of Accounts Executive on Short Term Contract Basis date extended. |
15 Sep 2021 | Engagement of a Retired Officer of Indian Police Service cadre who has worked in economic offence wing/unit in any capacity as "Economic Offence Expert" on short term contract basis date extended upto 29-09-2021. |
03 Sep 2021 | Hiring of Accounts Executive on Short Term Contract Basis. |
25 Aug 2021 | Engagement of a Retired Officer of Indian Police Service cadre who has worked in economic offence wing/unit in any capacity as "Economic Offence Expert" on short term contract basis. |
25 Aug 2021 | M/s Agrani Homes Real Marketing Pvt.Ltd Project : Daffodils City, Vs Authorized Representative of RERA. |
25 Aug 2021 | M/s Agrani Homes Pvt.Ltd Project : Galaxy (C & D), Vs Authorized Representative of RERA. |
25 Aug 2021 | M/s Agrani Homes Real Marketing Pvt.Ltd Project : Highway City, Vs Authorized Representative of RERA. |
25 Aug 2021 | M/s Agrani Homes Pvt.Ltd Project : IOB (M to Q), Vs Authorized Representative of RERA. |
25 Aug 2021 | M/s Agrani Homes Pvt.Ltd Project : PG1, Vs Authorized Representative of RERA. |
25 Aug 2021 | M/s Agrani Homes Pvt.Ltd Project : PG2, Vs Authorized Representative of RERA. |
25 Aug 2021 | M/s Agrani Homes Pvt.Ltd Project : IOB (R to U), Vs Authorized Representative of RERA. |
25 Aug 2021 | M/s Agrani Homes Pvt.Ltd Project : Shiv Dhyan, Vs Authorized Representative of RERA. |
24 Aug 2021 | M/s Palviraj Construction Pvt. Ltd Project : Mumbai Residency, Vs Authorized Representative of RERA. |
24 Aug 2021 | M/s Palviraj Construction Pvt. Ltd Project : Bollywood Residency, Vs Authorized Representative of RERA. |
24 Aug 2021 | M/s Palviraj Construction Pvt. Ltd Project : Goa City , Vs Authorized Representative of RERA. |
13 Aug 2021 | Short Term Notice : Hiring of Retired Officer of State Administrative Service as "Expert on Land Related Matters" on short term contract basis. |
13 Aug 2021 | Incorporation of I.S. 456:2000 and I.S.:4326:1993, Edition 3.2(2002-04) guideline in the drawings by Map passing authorities-regarding. |
11 Aug 2021 | Notice for Screening of shortlisted candidates applied for the Internship for Law Graduates. |
04 Aug 2021 | Law Graduates who have applied for the Internship in response to our advertisement notice dated 04/06/2021 are hereby informed that following candidates, who have been found aligible. |
02 Aug 2021 | Bihar Real Estate Regulatory Authority (General) Regulation, 2021. |
30 Jul 2021 | Hiring of Hindi Translator on Short Term Contract Basis. |
28 Jul 2021 | Important Notice : the Authority has decided to charge additional fee from those promoters who do not complete their projects in stitpulated time and seek extension of registration of their registered real estate projects with effect from 1st August 2021. |
22 Jul 2021 | IMPORTANT NOTICE : The matter of approval of maps in respect of Projects undertaken outside the planning areas is under consideration in the Authority and instructions have been sought from the Government. Till that time registration/extension of registration of such projects has been put on hold.
|
15 Jul 2021 | Notice : Revalidation/Re-approval Map. |
15 Jul 2021 | Hiring of retired Senior Police Officer having experience in handling economic offences at the level of Dy. Superintendent of Police and above as "Economic Expert" on short term contract basis. |
09 Jul 2021 | Due to unavoidable circumstances, the cases listed between 12th July to 23rd July 2021 before the Full Bench of the Authority have been adjourned till further orders. Fresh date of cases will be intimated as per availability of the Full Bench. |
08 Jul 2021 | PROCEEDING : Case No. SM/461/2020, Complainant : Authorized Representative of RERA, Respondent : M/s Palavi Raj Construction Pvt. Ltd |
07 Jul 2021 | Notice Inviting applications for paid Internship for A. Civil Engineering Graduates B. Graduates in Architecture and C. Masters in Accounts/Finance. |
05 Jul 2021 | PROCEEDING : CC No.CC/396/2019, CC/302/2019, CC/435/2019, CC/526/2019, CC/639/2019, CC/659/2019, CC/675/2019,CC/679/2019, CC/714/2019, CC/841/2019, CC/855/2019, CC/373/2019, CC/231/2019, CC/532/2019, CC/860/2019, CC/523/2019, CC/363/2019, CC/276/2019, CC/287/2019, CC/400/2019, CC/401/2019, CC/402/2019, CC/693/2019, CC/809/2019, CC/852/2019, CC/859/2019, CC/690/2019, CC/726/2019, CC/750/2019, CC/836/2019, CC/229/2019, CC/230/2019, CC/267/2019, CC/458/2019, CC/653/2019, CC/370/2019, CC/861/2020, CC/175/2018, CC/225/2019, CC/226/2019, CC/269/2019, CC/275/2019, CC/686/2019, CC/708/2019, CC/725/2019, CC/426/2019, CC/808/2019, CC/646/2019, CC/702/2019, CC/111/2018, CC/112/2018, CC/502/2019, CC/503/2019, CC/537/2019, CC/662/2019, CC/663/2019, CC/664/2019, CC/666/2019, CC/670/2019, CC/704/2019, CC/821/2019, CC/823/2019, CC/824/2019, CC/827/2019, CC/828/2019, CC/838/2019, CC/847/2019, CC/213/2019, CC/263/2019, CC/306/2019, CC/307/2019, CC/312/2019, CC/323/2019, CC/411/2019, CC/418/2019, CC/477/2019, CC/680/2019, CC/682/2019, CC/697/2019, CC/846/2019, CC/856/2019, CC/281/2019, CC/563/2019, CC/429/2019, CC/694/2019, CC/792/2019, CC/793/2019, CC/292/2019, CC/668/2019, CC/862/2019, CC/531/2019, CC/652/2019, CC/732/2019, CC/425/2019, CC/655/2019, CC/575/2019, CC/576/2019, CC/354/2019, CC/455/2019, CC/456/2019, CC/457/2019, CC/520/2019, CC/665/2019, CC/716/2019, CC/559/2019, CC/832/2019, CC/271/2019, CC/284/2019, CC/378/2019, CC/650/2019, CC/676/2019, CC/722/2019, CC/660/2019, CC/711/2019, CC/740/2019, CC/840/2019, CC/700/2019, CC/701/2019, CC/857/2019, CC/854/2019, CC/829/2019, CC/310/2019, CC/289/2019, CC/683/2019, CC/720/2019, CC/817/2019, CC/837/2019, CC/865/2019, CC/879/2019, CC/712/2019, CC/735/2019, CC/842/2019, CC/843/2019, CC/685/2019, CC/987/2020. CC/1099/2020 & CC1616/2020 , Complainants : SumanKumari & Others, Respondent : M/s Agrani Group of Companies |
02 Jul 2021 | PROCEEDING : M/s Pallavi Raj Construction Pvt. Ltd, Projects: Mumbai Residency/Bollywood Residency AB/Goa City Vs. Authorized Representative of RERA.
|
30 Jun 2021 | आज 30-06-2021 के समाचार पत्रों में पल्लवी राज कंस्ट्रक्सन प्राईवेट लिमिटेड से संबंधित प्रकाशित समाचारों की ओर प्राधिकार का ध्यान आकृष्ट हुआ और इस संबंध में प्राधिकार आम जन को निम्नांकित प्रमुख बाते बताना चाहता है . |
30 Jun 2021 | Notice : Our attention has been drawn to the news item related to Palviraj Construction Pvt Ltd published in several newspapers today on 30.6.2021. In this connection, attention of all concerned is invited to the following facts. |
29 Jun 2021 | Proceeding : Case No.CC/1126/2020, CC/1055/2020, CC/1424/2020, CC/1439/2020, CC/1448/2020, CC/1487/2020, CC/1511/2020,
CC/1665/2020, CC/1781/2020, CC/1798/2020, CC/135/2021, CC/907/2020, CC/1024/2020, CC/1160/2020, CC/1199/2020,
CC/1335/2020, CC/1780/2020, CC/1782/2020, CC/146/2021, CC/420/2021, CC/168/2018, CC/169/2018, CC/170/2018, CC/171/2018,
CC/172/2018, CC/187/2018, CC/209/2019, CC/293/2019, CC/723/2019, CC/758/2019 AO/187/2020, CC/942/2020, CC/1076/2020,
CC/1130/2020, CC/1498/2020 AO/480/2020, CC/1582/2020 AO/533/2020, CC/1583/2020, CC/15846/2020 AO/534/2020, CC/11585/2020
AO/535/2020, CC/11586/2020 AO/536/2020, CC/1587/2020, CC/1713/2020 AO/583/2020, CC/1714/2020 AO/584/2020, CC/1770/2020
AO/617/2020, CC/613/2019, CC/649/2019, CC/688/2019, CC/6689/2019, CC/690/2019, CC/691/2019, CC/730/2019, CC/751/2019,
CC/833/2019, CC/863/2019, CC/866/2019, CC/1009/2020, CC/1140/2020, CC/11530/2020, CC/1579/2020, CC/1615/2020, CC/1756/2020,
CC/11762/2020, CC/30/2021, CC/166/2021, CC/377/2021, CC/311/2019, CC/352/2019, CC/417/2019, CC/692/2019, CC/695/2019,
CC/713/2019, CC/731/2019, CC/794/2019, CC/816/2019, CC/909/2020, CC/914/2020, CC/1047/2020, CC/1068/2020, CC/1069/2020,
CC/1077/2020, CC/1096/2020, CC/1097/2020, CC/1141/2020, CC/1261/2020, CC/1395/2020, CC/1779/2020, CC/67/2021, CC/314/2021, CC/368/2021 & CC/369/2021, Complainant : Ajay Kumar Mishra/Savitri Devi/Meera Gupta/Sanjay Kumar Gupta/
Amit Raj Kamal/Mithilesh Kumar/Chhaya Lal/Karali Patra/Seema Kumari/Shivendu Kumar Mishra/Rita Singh/Lalan Prasad Singh/
Punam Mishra/Bineeta Kumari/Vijay Kumar Pandey/Aryan Pushpjeet/Rajiv Kumar/Santosh Kumar/Navneet Sharma/Kumar Gaurav/BaijooMistri/Bam Shankar Chaudhary/Koushlendra Kumar/Ran Avay Kumar/Sudhir Kumar Singh/Babita Devi/Kumari Anjana/Dineshwar Dubey/Dhananjay Kumar Singh/Subodh Kumar/Anuj Kumar Sinha/RekhaKumari,
Respondent : M/s Agrani Homes Pvt Ltd. |
28 Jun 2021 | Proceedings : Authorized Signatory, RERA Vs. M/s Palviraj Construction, Projects : Mumbai Residency, Bollywood Residency AB,
Goa City
|
28 Jun 2021 | Proceeding : Case No. CC/465/2019, CC/1084/2020, CC/1210/2020, CC/1211/2020, CC/1086/2020, CC/1323/2020, CC/399/2019, CC/1214/2020, CC/1247/2020, CC/1257/2020, CC/1292/2020, CC/1554/2020, CC/1820/2020, CC/1821/2020, CC/1860/2020, CC/345/2021, CC/647/2019, CC/742/2019, CC/810/2019, CC/1529/2019 AO/1502/2019, CC/970/2019, CC/971/2020, CC/972/2020, CC/973/2020, CC/1004/2020, CC/1022/2020, CC/1025/2020, CC/1085/2020, CC/1087/2020, CC/1088/2020, CC/1089/2020, CC/1090/2020, CC/1091/2020, CC/1092/2020, CC/1103/2020, CC/1104/2020, CC/1128/2020, CC/1132/2020, CC/1133/2020, CC/1134/2020, CC/1135/2020, CC/1202/2020, CC/1203/2020, CC/1204/2020, CC/1205/2020, CC/1206/2020, CC/1213/2020, CC/1224/2020 AO/344/2020, CC/1242/2020, CC/1258/2020, CC/1322/2020, CC/1327/2020, CC/1328/2020 AO/384/2020, CC/1330/2020, CC/1331/2020, CC/1332/2020, CC/1357/2020, CC/1377/2020 AO/403/2020, CC/1393/2020, CC/1394/2020, CC/1397/2020 AO/384/2020, CC/1403/2020, CC/1406/2020, CC/1407/2020, CC/1428/2020 AO433/2020, CC/1429/2020 AO 434/2020, CC/1444/2020 AO/444/2020, CC/1445/2020 AO/445/2020, CC/1489/2020 AO/474/2020, CC/1397/2020 AO/414/2020, CC/1568/2020 AO523/2020, CC/1569/2020 AO/524/2020, CC/1570/2020 AO/525/2020, CC/1705/2020, CC/1706/2020, CC/1728/2020, CC/1775/2020, CC/1776/2020, CC/1794/2020, CC/1861/2020 AO/662/2020, CC/1878/2020, CC/66/2021 AO/43/2021, CC/85/2021, CC/147/2021, CC/148/2021, CC/149/2021, CC/157/2021, CC/158/2021, CC/159/2021, CC/160/2021, CC/160/2021, CC/167/2021, CC/168/2021, CC/169/2021, CC/170/2021, CC/171/2021, CC/230/2021, CC/232/2021, CC/244/2021, CC/245/2021, CC/246/2021, CC/315/2021, CC/321/2021, CC/322/2021, CC/346/2021, CC/347/2021, CC/348/2021, CC/349/2021, CC/350/2021, CC/360/2021, CC/366/2021, CC/367/2021, CC/370/2021, CC/406/2021, CC/415/2021, CC/416/2021, CC/479/2021, CC/480/2021, CC/484/2021, CC/486/2021, CC/487/2021, CC/488/2021, CC/494/2021, CC/506/2021, CC/175/2021 AO/94/2021, CC/229/2021, CC/231/2021, CC/316/2021, CC/1454/2020, CC/1419/2020 AO/427/2020, CC/1430/2020 AO/435/2020, CC/1740/2020 AO/602/2020, CC/1741/2020 AO/603/2020, CC/1742/2020 AO/604/2020, CC/1743/2020 AO/605/2020, CC/1769/2020 AO/616/2020, CC/1804/2020 AO/630/2020, CC/1805/2020 AO/631/2020, CC/1815/2020 AO/633/2020 & CC/1816/2020 AO/634/2020, Complainant : Arvind Kumar & others, Respondent : M/s Shine City Infra Projects Pvt Ltd. |
21 Jun 2021 | Proceeding : Case No. CC/1679/2020; CC/1680/2020; CC/1681/2020; CC/1709/2020; CC/1783/2020; CC/1877/2020;
CC/1858/2020; CC/1876/2020; CC/1792/2020; CC/1784/2020; CC/1845/2020; CC/362/2021; CC/78/2021; CC/110/2021; CC/111/2021,
Complainants : Sanjeet Kumar/ Indu Shekhar Singh/ Dhaneshwari Singh/ Sunil Kumar/ Dr. Nidhi Rani/ Rakesh Kumar/ Sangita Kumar/
Suman Kumar Singhania/ Mr. Kaushal Kishore/ Dadan Kumar/ Smita Priyrdarshi/ Ranjana Singh/ Rajiv Ranjan Sinha/
Rajiv Ranjan Daftaur/ Anupama Singh/ Satyendra Kumar Srivastava/ Raja Ram Prasad/ Sumita Prasad/ Sanjay Kumar Jaiswal/
Arun Kumar Jaiswal/ Manoj Kumar Choudhary/ Sandeep Kumar
Respondent : M/s DDL Infratech Pvt. Ltd. |
21 Jun 2021 | Proceeding : Case No. CC/08/2018; CC/419/2019; CC/1023/2020; CC/1707/2020; CC/236/2021; CC/341/2021,
Complainants : Sanjay Kumar/ Anil Kumar/ Mukesh Kumar/ Chandramani Devi/ Abhishek Arun/ Shyama Kumari,
Respondent : M/s Rukmani Buildtech Pvt. Ltd. |
18 Jun 2021 | Proceeding : Case No.CC/168/2018, CC/169/2018, CC/170/2018, CC/171/2018, CC/172/2018, CC/187/2018, CC/209/2019,
CC/293/2019, CC/723/2019, CC/1130/2020, CC/1583/2020, CC/1587/2020, CC/ 1101/2020 AO/320/2020, CC/1498/2020 AO/480/2020,CC/1582/2020 AO/533/2020, CC/1584/2020 AO/534/2020, CC/1585/2020 AO/535/2020, CC/1586/2020 AO/536/2020,
CC/1770/20202 AO/617/2020, CC/1713/2020 AO/583/2020, CC/1714/2020 AO/584/2020, CC/203/2019, CC/1010/2020, CC/1011/2020, CC/264/2019, CC/279/2019, CC/372/2019, CC/807/2019, CC/812/2019, CC/844/2019, CC/967/2020, CC/1003/2020, CC/1624/2020
Complainant : Ajay Krishna & Others.
Respondent : M/s Agrani Homes Pvt Ltd. |
17 Jun 2021 | Proceeding : Case No. CC/885/2020, CC/886/2020, CC/899/2020, CC/900/2020, CC/1066/2020, CC/1067/2020, CC/1195/2020, CC/1196/2020,
Complainant : Raj Kumari/Chandradeo Ram/Kalindi Singh/Samarh Priyadarshi/Priyatosh Kr/Kumar Rohit/Ajit Kr Suma/Madhuri Prasad .
Respondent : M/s Superb Buildtech Pvt. Ltd. |
17 Jun 2021 | Proceeding : Case No. CC/08/2018, CC/419/2019, CC/1023/2020, CC/1707/2020, CC/236/2021 & CC/341/2021,
Complainant : Sanjay Kumar/Anil Kumar/Mukesh Kumar/Chandramauli Devi/Abhishek Arun/Shyama Kumari.
Respondent : M/s Rukmani Buildtech Pvt. Ltd. |
17 Jun 2021 | Proceedings : Authorised Signatory, RERA vs M/s Agrani group of companies |
15 Jun 2021 | Proceeding : Case No.CC/1126/2020, CC/11055/2020, CC/135/2021, CC/907/2020, CC/1335/2020, CC/1780/2020,CC/146/2021,
CC/363/2021, CC/613/2019, CC/649/2019, CC/691/2019, CC/730/2019,CC/751/2019,CC/833/2019,CC/863/2020, CC/1009/2020, CC/1140/2020, CC/1539/2020,CC/1579/2020,CC/1615/2020,CC/1762/2020,CC/30/2021,CC/166/2021, CC/377/2021, CC/417/2019, CC/713/2019, CC/731/2019, CC/794/2019, CC/816/2019, CC/909/2020,CC/914/2020,CC/1068/2020,CC/1069/2020,CC/1077/2020,CC/1096/2020,CC/1097/2020,CC/1141/2020,CC/1261/2020,
CC/1395/2020,CC/67/2021,CC/314/21, CC/368/2021, CC/369/2021, CC/692/2019 & CC/866/2019,
Complainants : Pranay Kumar/Santosh Kumar/Manoj Kumar/Rameshwar Nath Prasad/Arbind Prakash Ranjan/Sushil Kumar/Abhishek
Kumar/Madan Kumar Srivastava/Dr Bhola Kumar Singh/Ashok Kumar Singh/Kunal Kumar/Neelam Pathak/Ravi Kant Das/Manju Devi/Anita
Devi/Soni Kumari/Awadhesh Kumar Mishra/Urmila Gupta/Bandana kumara &Malti Sahay/Dr Vineet Sinha/Madhuri Kumari/Santosh Kumar
&MamtaChaudhary/Preeti Verma/Sugandha Jha/Abhishek Kumar/Dolly Singh/Sumit Ghosh/Rakesh Kumar Prasad/Kanahya Prasad
Sinha/Nagendra Kumar/Mohammad Shahzeb/Md SaoodAlam/Md Irshad Ahmad/Shyam Bihari Singh/Dharmaveer Singh/Alka Singh/Anita Kumari
Verma/Shashikant Sinha/Rakesh Kumar/Siddheshwar Pathak/Anupam Shukla/Rubi Bala/Murari Prasad/Aman Kumar/Mala Sinha
Respondent : M/s Agrani Homes Pvt Ltd |
14 Jun 2021 | Important Notice : Online applications for registration of Projects/Agents and submission of complaints. |
14 Jun 2021 | PROCEEDING : Case Nos. CC/1609/2020, CC/1610/2020, CC/1611/2020, CC/1612/2020, CC/1623/2020, Complaints : Karuna Kumari Alias Karuna Kumari Roy / Lakshman Singh/ Rahul Jawahar/ Ranjana Sharma/ Ashok Kumar Singh, Respondent : M/s DDL Infratech Pvt. Ltd |
14 Jun 2021 | Proceeding : RERA/CC/319/2019-RERA/AO/59/2019, RERA/CC/407/2019-RERA/AO/220/2019, RERA/CC/1008/2020, RERA/CC/1200/2020 , Complaints : Sri Ram Laddu Rai / M/s Star India Construction Pvt. / Raj Kumar and others / Miss Afsana Begum, Respondent : M/s Star India Construction Pvt. Ltd, Shiv Narayan Yadav and others . |
07 Jun 2021 | Proceeding : Case No.- CC/465/2019;CC/1084/2020;CC/1210/2020;CC/1211/2020;CC/1086/2020; CC/1323/2020;CC/1327/2020;CC/399/2019;CC/1214/2020;CC/1247/2020;CC/1257/2020;CC/1292/2020;
CC/1554/2020;CC/1820/2020;CC/1821/2020;CC/1860/2020;CC/345/2021;CC/647/2019;CC/810/2019;
CC/970/2020;CC/971/2020;CC/972/2020;CC/973/2020;CC/1004/2020;CC/1022/2020;CC/1025/2020;
CC/1085/2020;CC/1087/2020;CC/1088/2020;CC/1089/2020;CC/1090/2020;CC/1091/2020;
CC/1092/2020;CC/1103/2020;CC/1104/2020;CC/1128/2020;CC/1132/2020;CC/1133/2020;CC/1134/2020;
CC/1135/2020;CC/1202/2020;CC/1203/2020;CC/1204/2020;CC/1205/2020;CC/1206/2020;CC/1213/2020;
CC/1242/2020;CC/1258/2020;CC/1322/2020;CC/1330/2020;CC/1331/2020;CC/1332/2020;CC/1357/2020;
CC/1393/2020;CC/1394/2020;CC/1403/2020;CC/1406/2020;CC/1407/2020;CC/1728/2020;
CC/1775/2020;CC/1776/2020;CC/1794/2020;CC/1878/2020;CC/85/2021;CC/147/2021;CC/148/2021;
CC/149/2021;CC/157/2021;CC/158/2021;CC/159/2021;CC/160/2021;CC/167/2021;CC/168/2021;
CC/169/2021;CC/170/2021;CC/171/2021;CC/230/2021;CC/232/2021;CC/244/2021;
CC/245/2021;CC/246/2021;CC/315/2021;CC/321/2021;CC/322/2021;CC/346/2021;CC/347/2021;
CC/348/2021;CC/349/2021;CC/350/2021;CC/360/2021;CC/361/2021;CC/366/2021;CC/367/2021;
CC/370/2021;CC/406/2021;CC/415/2021;CC/416/2021;CC/479/2021; CC/480/2021;
CC/484/2021; CC/486/2021; CC/487/2021; CC/488/2021; CC/494/2021; CC/506/2021;
CC/229/2021; CC/231/2021; CC/316/2021; CC/1454/2020, Complainant/s : Mr. Arvind Kumar Malviya
& Others, Respondent/s :
M/s ShinecityInfraproject Pvt. Ltd/ M/s Shine City Charioteer of Reliable Service Pvt. Ltd |
04 Jun 2021 | Full Proceeding : cases Nos-CC/396/2019, 111/2018, 112/2018, 175/2018, 213/2019, 2016/2019, 225/2019,
226/2019, 229/2019, 230/2019, 231/2019, 263/2019, 267/2019, 269/2019, 270/2019, 271/2019, 275/2019, 276/2019,
281/2019, 284/2019, 287/2019, 289/2019, 292/2019, 293/2019, 302/2019, 306/2019, 307/2019, 310/2019, 311/2019,
312/2019, 323/2019, 352/2019, 354/2019, 363/2019, 373/2019, 378/2019, 400/2019, 401/2019, 402/2019, 411/2019,
417/2019, 418/2019, 425/2019, 426/2019, 429/2019, 435/2019, 455/2019, 456/2019, 457/2019, 458/2019, 477/2019,
502/2019, 503/2019, 520/2019, 523/2019, 526/2019, 531/2019, 532/2019, 537/2019, 545/2019, 559/2019, 563/2019,
575/2019, 576/2019, 639/2019, 646/2019, 649/2019, 650/2019, 652/2019, 653/2019, 655/2019, 659/2019, 660/2019,
662/2019, 663/2019, 664/2019, 665/2019, 666/2019, 668/2019, 670/2019, 675/2019, 676/2019, 679/2019, 680/2019,
682/2019, 683/2019, 685/2019, 686/2019, 688/2019, 689/2019, 690/2019, 691/2019, 692/2019, 693/2019, 694/2019,
695/2019, 697/2019, 700/2019, 701/2019, 702/2019, 704/2019, 708/2019, 710/2019, 711/2019, 712/2019, 713/2019,
714/2019, 716/2019, 720/2019, 722/2019, 725/2019, 726/2019, 728/2019, 730/2019, 731/2019, 732/2019, 735/2019,
740/2019, 750/2019, 751/2019, 792/2019, 793/2019, 794/2019, 808/2019, 809/2019, 813/2019, 816/2019, 817/2019,
821/2019, 823/2019, 824/2019, 827/2019, 828/2019, 829/2019, 832/2019, 833/2019, 836/2019, 837/2019, 838/2019,
840/2019, 841/2019, 842/2019, 843/2019, 846/2019, 847/2019, 848/2019, 852/2019, 854/2019, 855/2019, 856/2019,
857/2019, 859/2020, 860/2020, 861/2020, 865/2020, 866/2020, 879/2020 Complainants : Suman Kumari and others
Respondent : M/s Agrani Homes Pvt. Ltd. |
04 Jun 2021 | Notice Inviting Applications for Internship.
|
04 Jun 2021 | Proceedings : cases Nos-CC/396/2019, 111/2018, 112/2018, 175/2018, 213/2019, 2016/2019, 225/2019, 226/2019, 229/2019,
230/2019, 231/2019, 263/2019, 267/2019, 269/2019, 270/2019, 271/2019, 275/2019, 276/2019, 281/2019, 284/2019,
287/2019, 289/2019, 292/2019, 293/2019, 302/2019, 306/2019, 307/2019, 310/2019, 311/2019, 312/2019, 323/2019,
352/2019, 354/2019, 363/2019, 373/2019, 378/2019, 400/2019, 401/2019, 402/2019, 411/2019, 417/2019, 418/2019,
425/2019, 426/2019, 429/2019, 435/2019, 455/2019, 456/2019, 457/2019, 458/2019, 477/2019, 502/2019, 503/2019,
520/2019, 523/2019, 526/2019, 531/2019, 532/2019, 537/2019, 545/2019, 559/2019, 563/2019, 575/2019, 576/2019,
639/2019, 646/2019, 649/2019, 650/2019, 652/2019, 653/2019, 655/2019, 659/2019, 660/2019, 662/2019, 663/2019,
664/2019, 665/2019, 666/2019, 668/2019, 670/2019, 675/2019, 676/2019, 679/2019, 680/2019, 682/2019, 683/2019,
685/2019, 686/2019, 688/2019, 689/2019, 690/2019, 691/2019, 692/2019, 693/2019, 694/2019, 695/2019, 697/2019,
700/2019, 701/2019, 702/2019, 704/2019, 708/2019, 710/2019, 711/2019, 712/2019, 713/2019, 714/2019, 716/2019,
720/2019, 722/2019, 725/2019, 726/2019, 728/2019, 730/2019, 731/2019, 732/2019, 735/2019, 740/2019, 750/2019,
751/2019, 792/2019, 793/2019, 794/2019, 808/2019, 809/2019, 813/2019, 816/2019, 817/2019, 821/2019, 823/2019,
824/2019, 827/2019, 828/2019, 829/2019, 832/2019, 833/2019, 836/2019, 837/2019, 838/2019, 840/2019, 841/2019,
842/2019, 843/2019, 846/2019, 847/2019, 848/2019, 852/2019, 854/2019, 855/2019, 856/2019, 857/2019, 859/2020,
860/2020, 861/2020, 865/2020, 866/2020, 879/2020 Complainants : Suman Kumari and others, Respondent : M/s Agrani Homes Pvt. Ltd |
03 Jun 2021 | Proceedings : cases Nos-,RERA/CC/468/2019, 469/2019, 470/2019, 471/2019, 472/2019, 473/2019, 474/2019,
475/2019, 476/2019, 489/2019, 490/2019, 491/2019, 492/2019, 493/2019, 494/2019, 495/2019, 497/2019, 498/2019,
499/2019, 506/2019, 507/2019, 508/2019, 509/2019, 510/2019, 511/2019, 512/2019, 513/2019, 514/2019, 515/2019,
516/2019, 551/2019, 552/2019, 553/2019, 554/2019, 555/2019, 556/2019, 557/2019, 558/2019, 564/2019, 565/2019,
566/2019, 567/2019, 570/2019, 571/2019, 572/2019, 601/2019, 602/2019, 603/2019, 604/2019, 609/2019, 610/2019,
624/2019, 1609/2020, 1610/2020, 1612/2020, 1161/2020, 1623/2020, 1677/2020, 1679/2020, 1680/2020, 1681/2020,
1709/2020, 1772/2020, 1890/2020, 1080/2020, 1773/2020, 1783/2020, 1877/2020, 1858/2020, 1876/2020, 1811/2020,
1792/2020, 1784/2020, 977/2020, 935/2020, 952/2020, 1845/2020, 1689/2020, 992/2020, 78/2021, 110/2021, 111/2021,
178/2021, 179/2021, 291/2021, 355/2021, 362/2021, 1657/2020, 1658/2020, 976/2020, 975/2020, 974/2020, 1162/2020,
1163/2020, 1164/2020, 1102/2020, 1194/2020, 1165/2020, 1079/2020, 82/2021, 112/2021, 113/2021, 211/2021, 356/2021, 1166/2020, 1226/2020 & 1678/2020 Complainants : Vikash Kumar and others, Respondent : M/s D.D.L. Infratech Pvt. Ltd. |
03 Jun 2021 | Full Proceedings : Case Nos.CC/468/2019, CC/469/2019, CC/470/2019, CC/471/2019, CC/472/2019, CC/473/2019, CC/474/2019,
CC/475/2019, CC/476/2019, CC/489/2019, CC/490/2019, CC/491/2019, CC/492/2019, CC/493/2019, CC/494/2019, CC/495/2019,
CC/497/2019, CC/498/2019, CC/499/2019, CC/506/2019, CC/507/2019, CC/508/2019, CC/509/2019, CC/510/2019, CC/511/2019,
CC/512/2019, CC/513/2019, CC/514/2019, CC/515/2019, CC/516/2019, CC/551/2019, CC/552/2019, CC/553/2019, CC/554/2019,
CC/555/2019, CC/556/2019, CC/557/2019, CC/558/2019, CC/564/2019, CC/565/2019, CC/566/2019, CC/567/2019, CC/570/2019,
CC/571/2019, CC/572/2019, CC/601/2019, CC/602/2019, CC/603/2019, CC/604/2019, CC/609/2019, CC/610/2021, CC/624/2019,
CC/1609/2020, CC/1610/2020, CC/1611/2020, CC/1612/2020, CC/1161/2020, CC/1623/2020, CC/1677/2020, CC/1679/2020,
CC/1680/2020, CC/1681/2020, CC/1709/2020, CC/1772/2020, CC/1890/2020, CC/1080/2020, CC/1773/2020, CC/1783/2020,
CC/1877/2020, CC/1858/2020, CC/1876/2020, CC/1811/2020, CC/1792/2020, CC/1784/2020, CC/977/2020, CC/935/2020,
CC/952/2020, CC/1845/2020, CC/1689/2020, CC/992/2020, CC/78/2021, CC/110/2021, CC/111/2021, CC/178/2021, CC/179/2021,
CC/291/2021, CC/355/2021, CC/362/2021, CC/1657/2020, CC/1658/2020, CC/976/2020, CC/975/2020, CC/974/2020, CC/1162/2020,
CC/1163/2020, CC/1164/2020, CC/1102/2020, CC/1194/2020, CC/1165/2020, CC/1079/2020, CC/82/2021, CC/112/2021, CC/113/2021, CC/211/2021, CC/356/2021, CC/1166/2020, CC/1226/2020 & CC/1678/2020, Complainants : Mr.Vikas Kumar & Others, Respondent :
M/s DDL Infratech Pvt. Ltd. |
31 May 2021 | Extension of last date of submission of Completion certificate(CC) / Occupancy certificate, (OC) formation of Association, Execution of registered conveyance deed etc. up to 15-June-2021. |
25 May 2021 | रेरा कार्यालय, बिहार को दिनांक 26/05/2021 से 01/06/2021 तक बंद किया जाता है। |
15 May 2021 | रेरा कार्यालय, बिहार को दिनांक 16/05/2021 से 25/05/2021 तक बंद किया जाता है। |
14 May 2021 | प्रभार ग्रहण प्रतिवेदन नवीन वर्मा | |
04 May 2021 | Ensuring vaccination of 100% construction labours and other workers of your organisation with effect from 1 May 2021 in a Mission Mode. |
04 May 2021 | रेरा कार्यालय, बिहार को दिनांक 05/05/2021 से 15/05/2021 तक बंद किया जाता है। |
01 May 2021 | Office Order :Hearing of the Complaints cases will remain suspended during the period till 16th of May, 2021. |
30 Apr 2021 | Important Notice : Promoters of RERA registered Projects whose Projects have been completed. |
24 Apr 2021 | Office Order : Hearing of the Complaints cases will remain postponed till 30th of April, 2021. |
17 Apr 2021 | Important Notice for Real Estate Promoters/ Agents regarding project registration and also for all any compliance in RERA, Bihar. |
14 Apr 2021 | Office Order : Everyone in RERA, Bihar will work from home in the 4(four) working days till 25th April, 2021.
(2.) Online hearings will resume from 26th April, 2021. |
12 Apr 2021 | Office order |
08 Apr 2021 | Interim Order : Case No.- CC/262/2019; CC/339/2019; CC/340/2019; CC347/2019
Complainants: Devanti Devi/Jeetendra/Manoj Kumar/Shkuntala Devi
Respondene : M/S Galaxia Townshiip and Housing Pvt. Ltd. |
05 Apr 2021 | कार्यालय आदेश |
05 Apr 2021 | Submission of Statement of Accounts for the FY 2019-20 of the Real Estate Projects duly audited by the Chartered Accountants. |
05 Apr 2021 | Submission of Completion certificate / Occupancy certificate, formation of Association, Execution of registered conveyance deed etc. |
23 Mar 2021 | PROCEEDING : Case Nos. CC168/169/170/171/172/187/203/209/264/ 279/293/372/723/807/812/863/942/967/987/1114/1115/1117/1130/1150/1153/1160/1179/1180/1192/1230/1252/1424 of 2019,
Complainants : Ajay Krishna & Ors, Respondent : M/s Agrani Homes Pvt. Ltd. |
18 Mar 2021 | Plans submitted by Agrani Group of companies to RERA, Bihar. |
17 Mar 2021 | Proceeding : Proceeding : Case No. 795/2020, Complainant : Baptist Union Church, Opposite Pary : M/S Utkarsh Sfatik Limited. |
15 Mar 2021 | Proceeding : cases Nos-CC/396/400/401/402/411/417/418/425/426/429/435/455/456/457/458/477/503/213/216/289/293/310/
175/302/275/231/378/111/271/263/352/311/312/267/229/230/225/226/269/270/276/281/284/287/292/306/307/323/363/502/
354/373/520/523/526/531/537/545/559/563/575/576/112/532/639/646/649/650/652/653/655/659/660/662/663/664/665/666/
668/670/675/676/679/680/682/683/685/686/688/689/690/691/692/693/694/695/697/714/713/716/720/722/725/726/728/730/731/732
Complainants : Suman Kumari and others, Respondent : M/s Agrani Homes Pvt. Ltd. |
12 Mar 2021 | List of REGISTERED DEEDs of Absolute Sale/ Development Agreements Submited in RERA by M/s Agrani Group of Companies |
12 Mar 2021 | Proceeding : Case Nos. CC168/169/170/171/172/187/203/ 209/264/ 279/293/372/723/807/812/863/942/967/987/1114/1115/1117/1130/1150/1153/1160/1179/1180/1192/1230/1252/1424 Complainants :
Ajay Krishna & Ors Respondent : M/s Agrani Homes Pvt. Ltd. |
10 Mar 2021 | Proceeding : Proceeding : Case No. 795/2020, Complainant : Baptist Union Church, Opposite Pary : M/S Utkarsh Sfatik Limited. |
10 Mar 2021 | OFFICE ORDER : Audited statement of accounts of each project for F. Y. 2019-20 duly certified and signed by a Chartered Accountant in practice by 31st March 2021. |
08 Mar 2021 | Notice : Following work will be done from new premises. |
05 Mar 2021 | Proceeding : cases Nos- CC/396/400/401/402/411/417/418/425/426/429/435/455/456/457/458/477 /503/213/216/289/293/310/175/302/275/231/378/111/271/263/352/311/312/267/229/230/225/226/269/270/276/281/284/287/
292/306/307/323/363/502/354/373/520/523/526/531/537/545/559/563/575/576/112/532/639/646/649/650/652/653/655/659/660/
662/663/664/665/666/668/670/675/676/679/680/682/683/685/686/688/689/690/691/692/693/694/695/697/713/714/716/720/722/725/
726/728/730/731/732, Complainants :Suman Kumari and others, Respondent : M/s Agrani Homes Pvt. Ltd. |
01 Mar 2021 | INTERIM ORDER : Case No. CC/734/2019; CC/1543/2020 & CC/1733/2020, Complainants : Sharmila Devi/ Seema Singh/ Ram Bhagwan Singh, Respondent : M/s Amina Construction Pvt. Ltd |
26 Feb 2021 | Proceeding : Case No. 795/2020, Complainant : Baptist Union Church, Opposite Pary : M/S Utkarsh Sfatik Limited. |
26 Feb 2021 | INTERIM ORDER : Case No. SM/461/2020, Respondent : M/s Palvi Raj Construction Pvt. Ltd. |
26 Feb 2021 | Proceeding : Case No. 795/2020, Complainant : Baptist Union Church, Bakarganj, Opposite Party : M/s Utkarsh Sfatik Limited. |
23 Feb 2021 | Proceeding :Case Nos. CC168/169/170/171/172/187/203/209/264 279/293/372/723/807/812/863/942/967/987/1114/1115/1117/ 1130/1150/1153/1160/1179/1180/1192/1230/1252/1424 of 2019, Complainants :Ajay Krishna & Ors, Respondent : M/s Agrani Homes Pvt. Ltd |
19 Feb 2021 | Proceeding : Case No. 795/2020, Complainant : Baptist Union Church, Bakarganj, Opposite Party : M/s Utkarsh Sfatik Limited. |
19 Feb 2021 | Freezing of Bank Accounts by State Bank of India. |
18 Feb 2021 | Proceeding : cases Nos- CC/396/400/401/402/411/417/418/425/426/429/435/455/456/457/458/477 /503/213/216/289/293/310/175/302/275/231/378/111/271/263/352/311/312/267/229/230/225/226/269/270/
276/281/284/287/292/306/307/323/363/502/354/373/520/523/526/531/537/545/559/563/575/576/112/532/639/
646/649/650/652/653/655/659/660/662/663/664/665/666/668/670/675/676/679/680/682/683/685/686/688/689/690
/691/692/693/694/695/697/713/714/716/720/722/725/726/728/730/731/732, Complainants : Suman Kumari and others,
Respondent : M/s Agrani Homes Pvt. Ltd. |
12 Feb 2021 | Proceeding : Case No. 795/2020, Due to non-availability of Member, the hearing fixed today is postponed and fixed for 19th february, 2021. |
10 Feb 2021 | PROCEEDING : Cases Nos-CC/396/400/401/402/411/417/418/425/426/429/435/455/456/457/458/477/503/213/216/289/293/310/175/
302/275/231/378/111/271/263/352/311/312/267/229/230/225/226/269/270/276/281/284/287/292/306/307/
323/363/502/354/373/520/523/526/531/537/545/559/563/575/576/112/532/639/646/649/650/652/653/655/659/660/
662/663/664/665/666/668/670/675/676/679/680/682/683/685/686/688/689/690/691/692/693/694/695/697/713/714/716 /720/722/725/726 /728/730/731/732, Respondent : M/s Agrani Homes Pvt. Ltd. |
08 Feb 2021 | PROCEEDING : Case Nos. CC168/169/170/171/172/187/203/209/264/279/293/372/723/807/812/863/942/967/987/1114/1115/1117/
1130/1150/1153/1160/1179/1180/1192/1230/1252/1424 of 2019 Respondent : M/s Agrani Homes Pvt. Ltd. |
05 Feb 2021 | PROCEEDING : Case No. 795/2020, Respondent M/S Utkarsh Sfatik Limited. |
28 Jan 2021 | PROCEEDING : Case Nos. CC-168/169/170/171/172/187/203/209/293/723/1130/264/279/372/807/812 and 967.
Respondent M/S Agrani Homes Pvt. Ltd. |
27 Jan 2021 | PROCEEDING : Case No. 795/2020, Respondent M/S Utkarsh Sfatik Limited. |
25 Jan 2021 | PROCEEDING : cases Nos - CC/396/400/401/402/411/417/418/425/426/429/435/455/456/457/458 /477/503/213/216/289/293/310/175/302/275/231/378/111/271/263/352/311/312/267/229/230/225 /226/269/270/276/281/284/287/292/306/307/323/363/502/354/373/520/523/526/531/537/545/559 /563/575/576/112/532/639/646/649/650/652/653/655/659/660/662/663/664/665/666/668/670/675 /676/679/680/682/683/685/686/688/689/690/691/692/693/694/695/697/714/716 /720/722/725/726 /728/730/731/732
Respondent : M/s Agrani Homes Pvt. Ltd. |
14 Jan 2021 | Due to non-availability of one Member of the Bench, the hearing of this case fixed on 01.12.2020 was postponed. Now the date of hearing of this case is fixed on 21.01.2021 at 3.30 P.M. Through online VC. |
14 Jan 2021 | Due to non-availability of one Member of the Bench, the hearing of this case fixed on 27.11.2020 was postponed. Subsequenty, another Member of the Bench has since retired. The date of hearing of this case is now fixed on 25.01.2021 at 3.30 P.M. Through online VC. |
14 Jan 2021 | Due to non-availability of one Member of the Bench, the hearing of this case fixed on 09.12.2020 was postponed. Subsequenty, another Member of the Bench has since retired. The date of hearing of this case is now fixed on 28.01.2021 at 3.30 P.M. Through online VC. |
10 Dec 2020 | Office Order : Two personnel of RERA office have tested positive for Covid-19 same others are showing symptoms of the same. |
08 Dec 2020 | Due to non-availability of one Member of the Bench, the matter fixed before the Full Bench on 09-12-2020 is postponed. Fresh date will be intimated later. |
30 Nov 2020 | Due to non-availability of one Member of the Bench, the matter fixed before the Full Bench on 01-12-2020 is postponed. Fresh date will be intimated later. |
26 Nov 2020 | Due to non-availability of one Member of the Bench, the matter fixed before the Full Bench on 27-11-2020 is postponed. Fresh date will be intimated later. |
23 Nov 2020 | This is to inform that Hearing of Single Bench cases before Hon’ble Mr. R.B. Sinha (Member) and Double Bench cases have been adjourned till further orders. |
13 Nov 2020 | Two Delhi-based builders arrested for duping about 250 buyers of Rs 29 crore |
13 Nov 2020 | Noida Police registers FIR against Wave Mega City Centre directors |
13 Nov 2020 | Amrapali Group’s directors arrested in cheating case |
12 Nov 2020 | INTERIM ORDER : CC/101/2019, Complainant : Sudhir Kumar Dubey, Respondent : M/S Shambhavi Buildcon Pvt. Ltd. |
11 Nov 2020 | PROCEEDING : cases Nos - CC/396/400/401/402/411/417/418/425/426/429/435/455/456/457/458 /477/503/213/216/289/293/310/175/302/275/231/378/111/271/263/352/311/312/267/229/230/225 /226/269/270/276/281/284/287/292/306/307/323/363/502/354/373/520/523/526/531/537/545/559 /563/575/576/112/532/639/646/649/650/652/653/655/659/660/662/663/664/665/666/668/670/675 /676/679/680/682/683/685/686/688/689/690/691/692/693/694/695/697/713/714/716 /720/722/725/726 /728/730/731/732, Complainants : Suman Kumari and others, Respondent : M/s Agrani Homes Pvt. Ltd. |
06 Nov 2020 | PROCEEDING : Case No.795/2020, Complainant : Baptist Union Church, Respondent : M/s Utkarsh Sfatik Limited |
05 Nov 2020 | Big relief for homebuyers: SC says builder-buyer agreement must be considered as flat allotment date, not when project got RERA registered |
04 Nov 2020 | PROCEEDING : Case Nos. CC168/169/170/171/172/187/203/209/264 /279/293/372/723/807/812/863/942/967/987/1114/1115/1117/1130/1150/1153/1160/1179/1180/1192/1230/1252/1424 of 2019 , Complainants : Sri Ajay Krishna & Ors, Respondent : M/s Agrani Homes Pvt. Ltd. |
29 Oct 2020 | ???? ???????? ?????? 30-10-2020 ?? 03-11-2020 ?? ??? ????? | |
16 Oct 2020 | PROCEEDING : cases Nos - CC/396/400/401/402/411/417/418/425/426/429/435/455/456/457/458 /477/503/213/216/289/293/310/175/302/275/231/378/111/271/263/352/311/312/267/229/230/225 /226/269/270/276/281/284/287/292/306/307/323/363/502/354/373/520/523/526/531/537/545/559 /563/575/576/112/532/639/646/649/650/652/653/655/659/660/662/663/664/665/666/668/670/675 /676/679/680/682/683/685/686/688/689/690/691/692/693/694/695/697/714/716 /720/722/725/726 /728/730/731/732, Complainants : Suman Kumari and others, Respondent : M/s Agrani Homes Pvt. Ltd. |
12 Oct 2020 | PROCEEDING : Case No. 795/2020, Complainant : Mr. Rev. Moses, Respondent : M/s Utkarsh sfatik Limited |
09 Oct 2020 | PROCEEDING : Case No.-CC/168/169/170/171/172/187/203/209/293/723/264/279/372 of 2019 , Complainants : Sri Ajay Krishna & Others, Respondent : M/s Agrani Homes Pvt. Ltd. |
07 Oct 2020 | PROCEEDING : Case No. CC/396/400/401/402/411/417/418/425/426/429 /435/455/456
/457/458/477/503/213/216/289/293/310/175/302/275/231/378/111/271/263/352/311/
312/267/229/230/225/226/269/270/276/281/284/287/292/306/307/323/363/502/354/
373/520/523/526/531/537/545/559/563/575/576/112/532/639/646/649/650/652/653/
655/659/660/662/663/664/665/666.668/670/675/676/679/680/682/683/685/686/688/
689/690/691/692/693/694/695/697/714/716/720/722/725/726/728/730/731/732 Complainants : Suman Kumari and others, Respondent :M/s Agrani Homes Pvt. Ltd. |
30 Sep 2020 | PROCEEDING : Case Nos. CC168/169/170/171/172/187/203/ 209/ 293/ 723/ 264/ 279/ 372 of 2019 Complainants :Sri Ajay Krishna & Ors, Respondent : M/s Agrani Homes Pvt. Ltd. on 25-09-2020 |
29 Sep 2020 | PROCEEDING : Case No. CC/396/400/401/402/411/417/418/425/426/429/435/455/456/ 457/458/477/503/213/216/289/293/310/175/302/275/231/378/111/271/263/352/311/312/267/229/230/225/226/269/270/276/ 281/ 284/ 287/ 292/ 306/307/ 323/363/502/354/373/520/523/526/531/ 537 /545/559/563/575/576/112/ 532/639/ 646/649/650/652 /653/ 655/659/ 660/ 662/663/ 664/665/666.668/670/675/676/ 679/680/ 682/683/685/ 686/ 688/ 689 /690/ 691 /692 /693/ 694/695/ 697/ 714/ 716/720/ 722/725/726/728/730/731/
732 & Ors, Respondent M/s Agrani Homes Pvt. Ltd on 24-09-2020
|
28 Aug 2020 | Notice inviting Tender of Selection of Agency for Supply, Installation, Commissioning and Maintenance of 50 Mbps Internet leased line Including Supply of required hardware Router/Modems/Converters/fibre/Mux etc. at the switch board of at RERA, Bihar |
26 Aug 2020 | Notice for E-Hearing |
26 Aug 2020 | RPF:- Notice inviting Tender of Selection of Agency for Provision of dais i/c carpet etc. in Court room on ground floor and 2nd floor of Patel nagar exchange (New office) Patna |
17 Aug 2020 | RERA office shall continue to function with reduced strength on each working day from 18/08/2020 till 04/09/2020 as per the roster that was circulated separately on 02/08/2020. |
02 Aug 2020 | RERA office shall continue to function with reduced strength on each working day from 03/08/2020 till 14/08/2020 as per the roster that is being circulated separately |
17 Jul 2020 | The office of RERA will remain closed till Sunday, 02-08-2020 |
09 Jul 2020 | RERA office shall remain closed from 10-07-2020 to 19-07-2020. |
30 Jun 2020 | RERA office shall continue to function with reduced strength on each working day
as per the roster that is being circulated separately. |
31 May 2020 | RERA office shall continue to function with 50% strength on each working day as per the roster that is being circulated separately. |
19 Apr 2020 | Office Order : The office of RERA will remain functional from 20.4.2020. |
15 Apr 2020 | Office order : Employees, whose services have been outsourced to RERA by BELTRON, shall be paid the amount of monthly wages / remuneration, as received by them after necessary deductions, for the months of March and April 2020, as an advance, directly by RERA. |
14 Apr 2020 | OFFICE ORDER :Bihar RERA office shall remain closed till Sunday 3 May 2020. |
05 Apr 2020 | OFFICE ORDER : Bihar RERA office shall remain closed till Tuesday 14 April 2020. |
22 Mar 2020 | OFFICE ORDER : RERA office shall remain closed from Monday 23 March 2020 till Monday 6 April 2020. |
14 Mar 2020 | Office order : There will be no hearing of cases from 16 to 31 March 2020.
|
25 Feb 2020 | Request for Proposal (RFP) for Empanelment of CAG empanelled CA firms. Last date extended up to 20th March, 2020 till 5:00 PM |
06 Feb 2020 | Corrigendum : Consultant , Architecture and Consultant Finance |
28 Jan 2020 | Hiring of consultant, Finance On Short Term Contract Basis, Last Date 14th February 2020 till 5:00 PM. |
28 Jan 2020 | Hiring of consultant, Architecture On Short Term Contract Basis, Last Date 14th February 2020 till 5:00 PM. |
27 Jan 2020 | Request for Proposal (RFP) for Empanelment of CAG empanelled CA firms. Last date 20th February 2020 till 3.00 PM |
24 Jan 2020 | Attention: Promoters of RERA registered projects which have been completed.
Submission of Completion certificate / Occupancy certificate, formation of Association, Execution of registered conveyance deed etc. |
21 Jan 2020 | WALK IN INTERVIEW FOR HIRING OF DEPUTY CONTROLLER OF ACCOUNTS , DEPUTY CONTROLLER OF AUDIT AND SUPERVISOR OF ACCOUNTS ON SHORT TERM CONTRACT BASIS HAS BEEN EXTENDED ON 28|29-JAN-2020 AT 03:00 PM. |
10 Jan 2020 | WALK IN INTERVIEW FOR HIRING OF DEPUTY CONTROLLER OF ACCOUNTS , DEPUTY CONTROLLER OF AUDIT AND SUPERVISOR OF ACCOUNTS ON SHORT TERM CONTRACT BASI ON 21|22-JAN-2020 AT 03:00 PM. |
08 Jan 2020 | Notice: Walk in Interview for Hiring of " Coordinator of Court Proceeding " and "Assistant of Court Proceeding" on short term contract basis on 16-01-2020 at 3:00 PM. |
23 Dec 2019 | Important Notice : Promoters/Developers of Real Estate Projects, Submission of Statement of Accounts for the FY 2018-19 of the Real Estate Projects duly audited by the Chartered Accountants. |
20 Dec 2019 | Walk in Interview for : Hiring of " Coordinator of Court Proceeding " and "Assistant of Court Proceeding" on short term contract basis |
12 Dec 2019 | Notice for Interview : Invitation of application for Internship from Law Graduates of National Law Universities and other Universities dated 19-12-2019 at 02:30 PM. |
12 Dec 2019 | Notice for Interview : hiring of Consultant, Architecture on short term contract basis dated 18-12-2019 at 02:30 PM. |
12 Dec 2019 | Notice for Interview : hiring of Consultant, Media on short term contract basis dated 18-12-2019 at 02:30 PM. |
12 Dec 2019 | Notice for Interview : hiring of Consultant, Finance on short term contract basis dated 20-12-2019 at 02:30 PM. |
25 Oct 2019 | Notice for extension of last date of submission of Applications for legal Internship upto 8-11-2019 till 5.00 P.M |
25 Oct 2019 | Notice for extension of last date of submission of Applications for 1. Consultant, Finance 2. Consultant, Architecture and 3. Consultant, Finance upto 8-11-2019 till 5.00 P.M |
04 Oct 2019 | Important Notice : Audited Statement of Accounts of Each Project for the year 2018-19 by 31-10-2019. |
27 Sep 2019 | Invitation of application for Internship from Law graduates of National Law Universities and other Universities. Last date 14-10-2019 |
27 Sep 2019 | Hiring of Consultant Finance, Architecture, Media on Short Term Contract Basis. |
25 Sep 2019 | Important Notice : 1st National RERA Conclave is going to be organised at Lucknow, U.P. |
09 Sep 2019 | Notice : Hiring of Retired Personnel for Various Post on Short Term Contract Basis, Interview on 11 sep. 2019 at 4:00 PM. |
29 Aug 2019 | Hiring of Retired Personnel on Various Post on Short Term Contract Basis |
29 Aug 2019 | Notice for Request for Proposal of Selection of C.A firms for conducting audit of RERA Bihar. |
21 Aug 2019 | Notice : Request for proposal for salection of C.A. firms for conducting audit of RERA, Bihar |
08 Aug 2019 | Corrigendum for proposal (RFP) for selection of chartered Accountants’ firms for conducting Audit of Real Estate Regulatory Authority, Bihar for financial Year 2018-19 |
29 Jul 2019 | Request for proposal (RFP) for selection of chartered Accountants’ firms for conducting Audit of Real Estate Regulatory Authority, Bihar for financial Year 2018-19 |
09 Jun 2019 | Don’t move into a house without an Occupancy Certificate, it’s illegal |
27 May 2019 | Registration Department : Order for Non-Registration of Apartments/Plots or land. |
27 May 2019 | Registration Department : Order for Non-Registration of Apartments/Plots or land. |
04 Apr 2019 | Assistance for uploading application online for promoters, agents and complainants. |
05 Feb 2019 | List of Promoters/Developers along with their Projects against whom Suo Motu Notices have been issued in the last week (28 January - 1 February 2019) for non registration/noncompliance with Section 3 of the Real Estate (Regulation and Development) Act, 2016 |
01 Feb 2019 | Important Notice: Increase in the Late fee charges for Promoters/Developers of Ongoing Real Estate Projects |
29 Jan 2019 | Office order regarding fees for various services provided by RERA. |
02 Jan 2019 | List of Promoters/Developers along with their Projects against whom Suo Motu Notices have been issued in the last week of December, 2018 for non registration/noncompliance with Section 3 of the Real Estate (Regulation and Development) Act, 2016 |
28 Dec 2018 | Important Notice: Registration of Ongoing Real Estate Project (Residential/Commercial/Mixed/Plotted development) with Authority |
20 Dec 2018 | List of Promoters/Developers along with their Projects against whom Suo Motu Notices have been issued in the third week of December, 2018 for non registration/noncompliance with Section 3 of the Real Estate (Regulation and Development) Act, 2016 |
14 Dec 2018 | Kind Attention: Promoters/Developers of Real Estate Projects
Submission of Statement of Accounts for the FY 2017-18 of the Real Estate Projects duly audited by the Chartered Accountants
|
07 Dec 2018 | List of Promoters/Developers along with their Projects against whom Suo Motu Notices have been issued in the first week of December, 2018 for non registration/noncompliance with Section 3 of the Real Estate (Regulation and Development) Act, 2016 |
23 Nov 2018 | List of Promoters/Developers along with their Projectsagainst whom Suo Motu Notices have been issued on November 20, 2018 for non registration/noncompliance with Section 3 of the Real Estate (Regulation and Development) Act, 2016
|
05 Nov 2018 | List of Promoters/Developers along with their Projects against whom Show Cause Notices have been issued in November, 2018 for non registration/non-compliance with Section 3 of the Real Estate (Regulation and Development) Act, 2016 |
02 Nov 2018 | Important Notice: Late fee of filing applications for registration of ongoing projects date has been extended to 31th December 2018. |
03 Oct 2018 | Quotations are invited from registered printers for printing of greeting cards with envelope and wall calendar for Real Estate Regulatory Authority. |
25 Sep 2018 | Urgent notice for Promoters/developers. |
19 Sep 2018 | Extension of date of registration of ongoing project and revision of late fee charges w.e.f 1st october 2018. |
04 Sep 2018 | Important Notice: Late fee of filing applications for registration of
ongoing projects date has been extended to 30th September. |
18 Aug 2018 | Restraint Order of The Authority in terms of Section 36 of the Real Estate(Regulation and Development) Act 2016 |
11 Aug 2018 | 12. View Registered Certificate |
10 Aug 2018 | Display Of Project Details At The Constructions Sites |
04 Aug 2018 | 11. View Registered Certificate |
04 Aug 2018 | List of Promoters/Developers along with their Projects against whom Show
Cause Notices have been issued during the Month of July 2018 for non-
registration/non-compliance with the Section 3 of the Real Estate (Regulation
and development) Act 2016 |
30 Jul 2018 | Extension of the date of submission of Bids for Survey Work |
30 Jul 2018 | 10. View Registered Certificate |
25 Jul 2018 | Urgent Attention: Promoters/Developers and Builders of all real estate projects ( Residential, Mixed, Commercial and Plotted development) |
24 Jul 2018 | 9. View Registered Certificate |
24 Jul 2018 | 1. Agent Registered Certificate |
17 Jul 2018 | 8. View Registered Certificate |
11 Jul 2018 | Sub: Appointment of Information Technology (IT) Consultant on Contract basis |
11 Jul 2018 | Sub: Appointment of Legal Consultant position on Contract Basis |
11 Jul 2018 | Notice: Quotation |
11 Jul 2018 | 7. View Registered Certificate |
06 Jul 2018 | 6. View Registered Certificate |
03 Jul 2018 | Increase in the Late fee charges for Promoters/Developers of Ongoing Real Estate Projects |
22 Jun 2018 | Tender No-3 –Phase 1: Hiring the Services of a professional agency or agencies for
Survey of New and Ongoing Real Estate Projects (Residential, Commercial, Mixed
or Plotted development/Sale of Plots), not yet registered or applied for registration
with RERA, in the State of Bihar |
21 Jun 2018 | 5. View Registered Certificate |
20 Jun 2018 | Submission of the list of RERA Registered Real Estate Agents |
19 Jun 2018 | Notices issued to Builders/Promoters/Developers for nonCompliance
of Section 3 of the Real Estate (Regulation &
Development) Act 2016 during the Period 4th -17th June 2018 |
14 Jun 2018 | Notice Inviting Quotation |
14 Jun 2018 | RERA invites applications for Paid internship from Law graduates of National Law Schools/Universities |
08 Jun 2018 | 4. View Registered Certificate |
04 Jun 2018 | Corrigendum Letter of E-Quotation |
01 Jun 2018 | Increase in the Late fee charges for Promoters/Developers of Ongoing Real Estate Projects |
28 May 2018 | Corrigendum Letter of E-Quotation |
21 May 2018 | List of Promoters/Developers/Builders that were issued show-cause
notices during 7-21st May 2018 |
21 May 2018 | 3. View Registered Certificate |
18 May 2018 | URGENT ATTENTION : Promoter/developer of inordinately Delayed/ Still to be launched Real Estate Projects |
18 May 2018 | URGENT ATTENTION : Consumers/Allottees of inordinately Delayed/ Still to be launched Real Estate Projects |
18 May 2018 | Public Notice |
18 May 2018 | URGENT ATTENTION : Consumers/Allottees of inordinately Delayed/ Still to be launched Real Estate Projects |
18 May 2018 | Public Notice |
18 May 2018 | Important Functions & Duties of Promoters/Agents/Allottees
|
17 May 2018 | Notice : Inviting E-quotation for Biding. |
03 May 2018 | Registration of project beyond planning area. |
01 May 2018 | Notice about Late Fee |
02 Apr 2018 | Prabhar Prativedan : Rajiva Bhushan Sinha |
02 Apr 2018 | Prabhar Prativedan: Dr. Subodh Kumar Sinha |
14 Mar 2018 | Prabhar Prativedan: Afzal Amanullah |
10 Feb 2018 | List of fresh Show-Cause Notices issued during last week |
10 Feb 2018 | Defaulter List |
10 Feb 2018 | 2. View Registered Certificate |
10 Feb 2018 | 1. View Registered Certificate |
|