• Site Map.
  • We are also on Facebook. Facebook and twitter. twitter
  • How to reach RERA office.  
  • | +A     | A     | -A     |
Public Notice
Date of NoticeDescription
18 Sep 2024Selection of Agency for Comprehensive for Housekeeping, Hospitality Pantry Service including Operation & Maintenance and other Services for Outreach Centre of Real Estate Regulatory Authority, Bihar at Lalit Bhawan, Bailey Road, Patna
12 Sep 2024Corrigendum Notice -1, Hiring of Vehicle services.
12 Sep 2024Standard Operating Procedures(SOP) for apportionment of Amount among allottees recovered in accordance to section 40 of RERA Act, 2016, read with Rules 25 & 26 of Bihar RERA Rules, 2017.
10 Sep 2024Standard operating procedure(SOP) for Revocation of a project on the request of the promoter under section 7(1)(a) Real Estate (Regulation and Development) Act, 2016.
09 Sep 2024Notice Inviting application for Assistant Accountant on Short term Contract basis.
06 Sep 2024Quarterly progress report for quarter ending March/June/sept/December (Form-7)
05 Sep 2024BPQ Latest Top 15
05 Sep 2024BPQ Latest Top 15 Improvement
05 Sep 2024BPQ Latest Complete List
30 Aug 2024BRQ Lates Top 15 Improvements
30 Aug 2024BRQ Latest Top 15
30 Aug 2024BRQ Latest Completed List
06 Aug 2024Notice Inviting application for Civil Engineering Internship.
01 Aug 2024Bihar Real Estate Regulatory Authority (General) Regulations, 2024.
01 Aug 2024बिहार भू -सम्पदा विनियामक प्राधिकरण (सामान्य ) विनियमावली, २०२४
24 Jul 2024Corrigendum : Request For Proposal, Services/Supply required for Data Management System(DMS) and Record management System(RMS).
22 Jul 2024Corrigendum-1, Proposals/Quotations are invited from the experienced company /LLP /Form / Proprietorship firm who have earlier experience of developing Portal/Software for RERA of other state to develop complete online portal for RERA.
22 Jul 2024Introduction of New Online Appointment Service for visitors.
16 Jul 2024BIHAR REAL ESTATE PROJECT QUOTIENT (BPQ) TOP 929.
15 Jul 2024BIHAR REAL ESTATE PROJECT QUOTIENT (BPQ) TOP 900.
12 Jul 2024BIHAR REAL ESTATE PROJECT QUOTIENT (BPQ) TOP 800.
11 Jul 2024BIHAR REAL ESTATE PROJECT QUOTIENT (BPQ) TOP 700.
10 Jul 2024BIHAR REAL ESTATE PROJECT QUOTIENT (BRQ) TOP 637.
10 Jul 2024BIHAR REAL ESTATE PROJECT QUOTIENT (BPQ) TOP 600.
09 Jul 2024BIHAR REAL ESTATE PROJECT QUOTIENT (BRQ) TOP 500.
09 Jul 2024BIHAR REAL ESTATE PROJECT QUOTIENT (BPQ) TOP 500.
08 Jul 2024BIHAR REAL ESTATE PROJECT QUOTIENT (BPQ) TOP 400.
08 Jul 2024BIHAR REAL ESTATE PROJECT QUOTIENT (BRQ) TOP 400.
05 Jul 2024Proposals / Quotations are invited from the experienced Company/ LP/Firm/Proprietorship firm who have earlier experience of developing Portal/Software for RERA of other states to develop complete online portal for RERA.
05 Jul 2024BIHAR PROMOTERS QUOTIENT (BPQ) TOP 300.
05 Jul 2024BIHAR PROMOTERS QUOTIENT (BRQ) TOP 300
04 Jul 2024BIHAR PROMOTERS QUOTIENT (BPQ) TOP 200.
04 Jul 2024BIHAR PROMOTERS QUOTIENT (BRQ) TOP 200.
03 Jul 2024BIHAR REAL ESTATE PROJECT QUOTIENT (BPQ) TOP 100.
03 Jul 2024BIHAR REAL ESTATE PROJECT QUOTIENT (BRQ) TOP 100.
01 Jul 2024Bihar Promoters Quotient (BPQ) Top 10.
01 Jul 2024Bihar Real Estate Project Quotient (BRQ) Top 10.
24 Jun 2024NOTICE : Request for Proposal for Services/Supply required for Date Management System (DMS) and Record Management System (RMS)
14 Jun 2024Notice Inviting application for Legal Internship form eligible Law Graduate/Post Graduate candidates of National Law Universities and other Universities.
07 Jun 2024Notice inviting application from Retired Officer of Bihar Administrative Service not below the rank of Special Secretary for filling up the post of "Senior Land Revenue Officer" on short term contract basis.
07 Jun 2024Notice inviting application from Retired Officer of Indian Administrative Service for filling up the post of "Secretary" on Short term contract basis.
29 May 2024Corrigendum regarding various fees.
13 May 2024NOTICE :- Office Order : The fees for obtaining certified copies of various documents.
25 Apr 2024Common queries generally made during the scrutiny of applications submitted for the registration of projects.
04 Mar 2024CHECKLIST FOR SCRUTINY OF INFORMATION AND DOCUMENTS REQUIRED WITH APPLICATION FOR REGISTRATION OF PROJECTS
09 Feb 2024Regarding Registration of Real Estate Agents
09 Feb 2024Regarding Real Estate Agents.
15 Dec 2023Important notice for Registered Real Estate Agents.
11 Dec 2023Real Estate Regulatory Authority, Bihar is desirous to get the Annual Report for the financial year 2022-23 printed through a reputed and experienced Offset Printer on following terms and conditions
23 Nov 2023The Authority, exercising the powers available to it under section 7(3) of the RERA, Act, 2016, has decided that, instead of revoking the registration, permit the registration to remain in force with the condition that promoter would not book any unit till final decision is taken by Authority.
13 Nov 2023Subsequently, Standard Operating Procedure(SOP) has been formulated to deal with the application for extension of registration of such lapsed projects.
18 Oct 2023Important information for all Real Estate Agents received from the Directorate General of Audit and Indirect Taxes & Customs, under the Prevention of Money Laundering Act.
05 Sep 2023Regarding submission of requisite documents for registration of Real Estate Projects.
04 Sep 2023Regarding compliance of the order dated 02-08-2023, passed by full bench of the Authority concerning Mr. Alok Kumar, Managing Director of M/s. Agrani Homes Pvt. Ltd. & associates.
31 Aug 2023Important Notice for Promoters : It has been decided that, as mandated in Regulation No. 8A(3) every promoter shall upload on its webpage in the Authority.
18 Aug 2023Standard Operating Procedure (SOP) for dealing with the Projects where the date of completion as mentioned in the application for registration has been exceeded and hence the project has come under lapsed category as application for extension of registration was not submitted within time.
11 Aug 2023Notice : litigation pertaining to the issue regarding share of promoter and landowner in the project available for selling and marketing.
03 Aug 2023Real Estate Regulatory Authority, Bihar is desirous to get the Hand Book for Allottees printed through reputed and experienced Offset Printer.
01 Aug 2023Affidavit cum-declaration Memorandum of division of share between promoter and landowner available for marketing and selling.
25 Jul 2023Regarding Real Agents only to facilitate the sale or purchase of any plot, apartment or building only in RERA registered Projects.
25 Jul 2023प्राधिकरण में निबंधित परियोजनाओ में किसी भी भूखंड, अपार्टमेंट या भवन की बिक्री या खरीद की सुविधा के लिए रियल एस्टेट अगेंटो के संबंध में |
19 Jul 2023Standard Operating Procedure (SOP) for the extension of Projects beyond the specification period of extension for completion.
05 Jul 2023All Promoters are requested to ensure that all such certificates invariably mention the Unique Document Identification Number(UDIN) of the Chartered Accountant concerned.
16 Jun 2023Non-submission of QPR and documents required to be submitted as per Regulation 22A.
16 Jun 2023Submission of the application for extension of registration at least one month before the expiry of the registration granted.
13 Jun 2023List of lapsed projects. (Monitored till 12/06/2023)
23 May 2023Office Order : Annual Report for the financial year 2021-22, printed through a reputed and experienced Offset Printer.
08 May 2023The registration of the project Yugal Kishore Complex (Registration No: BRERAP00016-6/904/R 649/2019) is cancelled as withdrawn with the condition that if the promoter intends to sell any unit of the Project in future
20 Apr 2023Notice : All concerned Parties/Advocates appearing before the RERA Benches are again hereby informed that if he/she desire to appear before bench on virtual basis(Online), he/she may apply before one day to Authority for the same.
20 Apr 2023Updated Guidelines on Anti-Money Laundering (AML) Standards and Combating the Financing of Terrorism (CFT) obligations for Real Estate Agents under the Prevention of Money Laundering Act, 2002 and the Prevention of Money- Laundering (Maintenance of Records) Rules, 2oo5- reg.
20 Apr 2023Order under Section 7(3) of Real Estate (Regulation and Development) Act, 2016 against the Project "Shanti Apartment" by Griham Developers Pvt. Ltd.
28 Feb 2023Extension of period of registration for participation in the Awareness workshop to be organised only for Home Buyers.
21 Feb 2023General Amnesty Scheme to safeguard the interest of allottees of such project where promoter failed to submit application for extension of their project during the prescribed period.
10 Feb 2023Real Estate Agents(Company and Firm) to submit reports on transaction of plots/flats etc.
03 Feb 2023Registration for Participation in the Awareness workshop to be organised only for Home Buyers.
23 Jan 2023Regarding imposition of penalty on promoters who have not submitted Quarterly Progress Report(QPR) on time.
23 Jan 2023Promoters of such projects are required to upload the completion certificate as provided in the Bihar Building Byelaws, 2014.
04 Jan 2023Office Order : Promoter also need to upload the sorce of finance once in a year on the webpage of concerned project created on the website of RERA, Bihar.
04 Jan 2023Promoter has to give details of the project undertaken in the last five along with other information.
15 Dec 2022Notice Inviting Quotations : 1. Wall Calendar of Calender Year 2023 Real Estate Regulatory Authority on Art paper of 130 GSM containing Six leaves (12 pages) Size 15' X 20' multicolour as per design which includes logo and other items with 12 months calendar indicating Saturday/Sunday/Other holidays/Restricted holidays etc. as declared by Govt. of Bihar Number of calendars with spiral winding and hook will be 1200 (One Thousand Two Hundred Only)
18 Nov 2022Information/Documents to be Uploaded by Promoter on the Website.
26 Oct 2022Regarding online arrangement to submit the application for the extension of the completion dates of the registration of project.
26 Oct 2022Office Order No. 98 dated 10/10/2022 issued Regarding General Amnesty Scheme to safeguard the interest of allottees of such project where promoter failed to submit application for extension of their project during the prescribed period.
10 Oct 2022Standard Operating Procedure (SOP) for separate A/C to be opened under Section 4(2)(l)(D) of Real Estate (Regulation and development) Act, 2016.
10 Oct 2022General Amnesty Scheme to safeguard the interest of allottees of such projects where promoter failed to submit application for extension of their project during the prescribed period.
31 Aug 2022Extension of last date of submission of application for the position of Court Master on short term contract basis.
31 Aug 2022General Notice : It has been decided that no complaint case would be entertained before the Authority.
26 Aug 2022Order under section 7(3) of Real Estate (Regulation and Development) Act, 2016 against the Project "Sai Enclave" of Anu Anand Construction Pvt. Ltd.
04 Aug 2022Extension of last date of online submission of application for the position of Legal Executive on short term contract basis.
04 Aug 2022Notice for Hiring of Retired Personnel for the position of Court Masters on Short Term Contract Basis.
19 Jul 2022Regarding Reward Scheme for those providing authentic information about violation of the Real Estate (Regulation and Development) Act, 2016.
06 Jul 2022Disclosing the share of Promoter in the Project through Affidavit.
06 Jul 2022Regarding treatment of abandoned projects where promoters are not serious about getting the projects registered.
06 Jul 2022Regarding discontinuance of levying late fees in case of registration of Ongoing projects.
06 Jul 2022Submission of documents and information on Affidavit by the Promoter in case of completion of Project and where Occupancy Certificate is not issued by the competent authority.
29 Jun 2022Hiring of Legal Executive on Short Term Contract Basis.
15 Jun 2022पाटलिपुत्र एनाक्लेभ प्रोजेक्ट के विरुद्ध दायर शिकायतकर्ता को तत्काल उपलध राशि में से उनके द्वारा जमा की गयी राशि का २९% वापस करने का निर्णय लिया गया है.
13 Jun 2022Extension of last date of submission of application for the position of Registrar(Legal) on short term contract basis.
08 Jun 2022GENERAL NOTICE : It has been observed from the Quarterly Progress Report of some projects that all works have been completed.
07 Jun 2022अग्रणी रुद्रा प्रोजेक्ट के बिरुद्ध दायर निम्नांकित वाद के शिकायतकर्ता को तत्काल उपलब्ध राशि में से उनके द्वारा जमा की गयी राशि का 14 % राशि वापस करने का निर्णय लिया गया है |
06 Jun 2022आम सूचना : धारा ३ के प्रावधान के अनुसार कोई भी प्रवर्तक बगैर निबंधन कराये आठ आपार्टमेंट की संख्या से अधिक या ५०० वर्ग मीटर कुल क्षेत्रफल से अधिक की परियोजना का विज्ञापन या बिक्री नहीं कर सकते है|
03 Jun 2022Extension of last date of submission of application for the positions of Court Masters on Short term Contract Basis extended till 15-06-2022.
02 Jun 2022HIRING OF STENOGRAPHER (ENGLISH/HINDI) ON SHORT TERM CONTRACT BASIS.
02 Jun 2022“पाटलिपुत्र एन्क्लेभ प्रोजेक्ट” के बिरुद्ध दायर निम्नांकित वाद के शिकय्त्कार्त्ता को तत्काल उपलब्ध राशि में से उनके द्वारा जमा की गयी राशि का 29% राशि वापस (Refund) करने का निर्णय लिया गया है.
31 May 2022General Notice : Those allottees/complainants who have filed case in the year 2021 but whose matters have not yet been listed before nay bench of the Authority, may apply, if they so desire, for resolution of their dispute through conciliation.
25 May 2022General Notice : All concerned complainants are hereby informed to file proof of such application along with their complaint and other documents filed with the promoters.
25 May 2022सार्वजनिक सूचना : सभी सबंधित शिकायतकर्ताओ को सूचित किया जाता है कि वे शिकायत और अन्य दस्तावेज के साथ इस तरह के आवेदन साक्ष्य के रूप में दाखिल करे, अन्यथा आपके शिकायत आवेदन को ख़ारिज किया जा सकता है|
20 May 2022“पाटलिपुत्र एन्क्लेभ प्रोजेक्ट” के बिरुद्ध दायर निम्नांकित वाद के शिकय्त्कार्त्ता को तत्काल उपलब्ध राशि में से उनके द्वारा जमा की गयी राशि का ५०% राशि वापस (Refund) करने का निर्णय लिया गया है:-
20 May 2022“शिव इन्दु भवन (अग्रणी पाटलिपुत्रा रेसीडेंसी) प्रोजेक्ट” के बिरुद्ध दायर निम्नांकित वाद के शिकय्त्कार्त्ता को तत्काल उपलब्ध राशि में से उनके द्वारा जमा की गयी राशि का ३०% राशि वापस (Refund) करने का निर्णय लिया गया है.
18 May 2022The last date of submission of application for the short-term appointment on the position of special Secretary has now been extended till 31st May 2022.
18 May 2022Hiring of Registrar (Legal) On Short Term Contract Basis.
06 May 2022Hiring of court Masters on short term contract basis.
04 May 2022Notice : Real Estate Regulatory Authority can take action against complaint file under Section 31 of RERA Act,2016
30 Apr 2022Extension of date for written Test and Oral Test for the position of Graduate Civil Engineer/Graduate of Architecture/Master of Finance and Account Internship
29 Apr 2022Hiring of Retired Officer of Indian Administrative Service/State Administrative Service Cadre as "Special Secretary" on Short term contract basis.
25 Apr 2022Bihar State RERA FAQs.
21 Apr 2022Extension of last date of submission of application for the positions Consultant Finance, Technical Officer(Civil), Hindi Translator, Accounts Executive, Account Manager on Short term contract Basis.
09 Apr 2022Guidelines for execution filing.
08 Apr 2022Bihar Real Estate Regulatory Authority (BRERA) Conciliation and Dispute Resolution Cell.
08 Mar 2022Notice : All matters listed before the Honorable Single Bench, Double Bench & Execution Bench of Authority has been adjourned from 2nd of March, 2022 till 31 March 2022.
24 Feb 2022Important Notice :The documents submitted without case number and before and the office hours would not be entertained.
24 Feb 2022 Quarterly Progress Report for quarter ending March/June/Sept/December Formats.
07 Feb 2022सूचना : यह सूचना जनहित में जरी की जा रही है की किसी अनाधकृत व्यक्ति के द्वारा स्थानीय जाँच पुर्णतः अनधिकृत है |
28 Jan 2022विभिन्न परियोजनाओं के संदर्भ में अग्रणी होम प्राइवेट लिमिटेड द्वारा प्राप्त पत्र।
20 Jan 2022Appeal No. 58/2021, MS Hira Panna Infra Projects LLP, order passed by Appellate Tribunal, Bihar.
13 Dec 2021Office Order : The period of validity for registration and completion of such projects is extended by Nine Months.
30 Nov 2021JOINT-AFFIDAVIT-CUM-UNDERTAKING FORMATS
29 Oct 2021Notice : Regarding approval of regitration/extension of registration of projects falling within/outside planning area.
11 Oct 2021Hiring of Stenographer (English) on short term contract basis.
08 Oct 2021Show Cause Notice under Section 7 (1) for Revocation of registration of the Project by Sri Anu Anand Construction Pvt.Ltd.
05 Oct 2021Hearing of cases with effect from 25/10/2021 in a hybrid mode wherein allottees and their counsel will have option to join either online or in physical mode.
01 Oct 2021HIRING OF TECHNICAL OFFICER (CIVIL) ON SHORT TERM CONTRACT BASIS.
29 Sep 2021Submission of Quarterly Progress Reports by the Promoters of Registered Real Estate Projects.
29 Sep 2021Show Notice for Revocation of Registration under Section 7 of the Real Estate (Regulatory and Development ) Act 2016 and levy of penalty under section 60 of the Act for non-compliance of the section 4 of the Act.
20 Sep 2021Hiring of Nazir and Court Masters on Short Term Contract Basis.
20 Sep 2021Notice for Empanelment of Advocates in the Panel of RERA, Bihar
19 Sep 2021HIRING OF CONSULTANT, FINANCE ON SHORT TERM CONTRACT BASIS.
18 Sep 2021Show Cause Notice under Section 7 (1) for Revocation of registration of the Project by Concicon Pvt. Ltd.
15 Sep 2021Hiring of Accounts Executive on Short Term Contract Basis date extended.
15 Sep 2021Engagement of a Retired Officer of Indian Police Service cadre who has worked in economic offence wing/unit in any capacity as "Economic Offence Expert" on short term contract basis date extended upto 29-09-2021.
03 Sep 2021Hiring of Accounts Executive on Short Term Contract Basis.
25 Aug 2021Engagement of a Retired Officer of Indian Police Service cadre who has worked in economic offence wing/unit in any capacity as "Economic Offence Expert" on short term contract basis.
25 Aug 2021M/s Agrani Homes Real Marketing Pvt.Ltd Project : Daffodils City, Vs Authorized Representative of RERA.
25 Aug 2021M/s Agrani Homes Pvt.Ltd Project : Galaxy (C & D), Vs Authorized Representative of RERA.
25 Aug 2021M/s Agrani Homes Real Marketing Pvt.Ltd Project : Highway City, Vs Authorized Representative of RERA.
25 Aug 2021M/s Agrani Homes Pvt.Ltd Project : IOB (M to Q), Vs Authorized Representative of RERA.
25 Aug 2021M/s Agrani Homes Pvt.Ltd Project : PG1, Vs Authorized Representative of RERA.
25 Aug 2021M/s Agrani Homes Pvt.Ltd Project : PG2, Vs Authorized Representative of RERA.
25 Aug 2021M/s Agrani Homes Pvt.Ltd Project : IOB (R to U), Vs Authorized Representative of RERA.
25 Aug 2021M/s Agrani Homes Pvt.Ltd Project : Shiv Dhyan, Vs Authorized Representative of RERA.
24 Aug 2021M/s Palviraj Construction Pvt. Ltd Project : Mumbai Residency, Vs Authorized Representative of RERA.
24 Aug 2021M/s Palviraj Construction Pvt. Ltd Project : Bollywood Residency, Vs Authorized Representative of RERA.
24 Aug 2021M/s Palviraj Construction Pvt. Ltd Project : Goa City , Vs Authorized Representative of RERA.
13 Aug 2021Short Term Notice : Hiring of Retired Officer of State Administrative Service as "Expert on Land Related Matters" on short term contract basis.
13 Aug 2021Incorporation of I.S. 456:2000 and I.S.:4326:1993, Edition 3.2(2002-04) guideline in the drawings by Map passing authorities-regarding.
11 Aug 2021Notice for Screening of shortlisted candidates applied for the Internship for Law Graduates.
04 Aug 2021Law Graduates who have applied for the Internship in response to our advertisement notice dated 04/06/2021 are hereby informed that following candidates, who have been found aligible.
02 Aug 2021Bihar Real Estate Regulatory Authority (General) Regulation, 2021.
30 Jul 2021Hiring of Hindi Translator on Short Term Contract Basis.
28 Jul 2021Important Notice : the Authority has decided to charge additional fee from those promoters who do not complete their projects in stitpulated time and seek extension of registration of their registered real estate projects with effect from 1st August 2021.
22 Jul 2021IMPORTANT NOTICE : The matter of approval of maps in respect of Projects undertaken outside the planning areas is under consideration in the Authority and instructions have been sought from the Government. Till that time registration/extension of registration of such projects has been put on hold.
15 Jul 2021Notice : Revalidation/Re-approval Map.
15 Jul 2021Hiring of retired Senior Police Officer having experience in handling economic offences at the level of Dy. Superintendent of Police and above as "Economic Expert" on short term contract basis.
09 Jul 2021 Due to unavoidable circumstances, the cases listed between 12th July to 23rd July 2021 before the Full Bench of the Authority have been adjourned till further orders. Fresh date of cases will be intimated as per availability of the Full Bench.
08 Jul 2021PROCEEDING : Case No. SM/461/2020, Complainant : Authorized Representative of RERA, Respondent : M/s Palavi Raj Construction Pvt. Ltd
07 Jul 2021Notice Inviting applications for paid Internship for A. Civil Engineering Graduates B. Graduates in Architecture and C. Masters in Accounts/Finance.
05 Jul 2021PROCEEDING : CC No.CC/396/2019, CC/302/2019, CC/435/2019, CC/526/2019, CC/639/2019, CC/659/2019, CC/675/2019,CC/679/2019, CC/714/2019, CC/841/2019, CC/855/2019, CC/373/2019, CC/231/2019, CC/532/2019, CC/860/2019, CC/523/2019, CC/363/2019, CC/276/2019, CC/287/2019, CC/400/2019, CC/401/2019, CC/402/2019, CC/693/2019, CC/809/2019, CC/852/2019, CC/859/2019, CC/690/2019, CC/726/2019, CC/750/2019, CC/836/2019, CC/229/2019, CC/230/2019, CC/267/2019, CC/458/2019, CC/653/2019, CC/370/2019, CC/861/2020, CC/175/2018, CC/225/2019, CC/226/2019, CC/269/2019, CC/275/2019, CC/686/2019, CC/708/2019, CC/725/2019, CC/426/2019, CC/808/2019, CC/646/2019, CC/702/2019, CC/111/2018, CC/112/2018, CC/502/2019, CC/503/2019, CC/537/2019, CC/662/2019, CC/663/2019, CC/664/2019, CC/666/2019, CC/670/2019, CC/704/2019, CC/821/2019, CC/823/2019, CC/824/2019, CC/827/2019, CC/828/2019, CC/838/2019, CC/847/2019, CC/213/2019, CC/263/2019, CC/306/2019, CC/307/2019, CC/312/2019, CC/323/2019, CC/411/2019, CC/418/2019, CC/477/2019, CC/680/2019, CC/682/2019, CC/697/2019, CC/846/2019, CC/856/2019, CC/281/2019, CC/563/2019, CC/429/2019, CC/694/2019, CC/792/2019, CC/793/2019, CC/292/2019, CC/668/2019, CC/862/2019, CC/531/2019, CC/652/2019, CC/732/2019, CC/425/2019, CC/655/2019, CC/575/2019, CC/576/2019, CC/354/2019, CC/455/2019, CC/456/2019, CC/457/2019, CC/520/2019, CC/665/2019, CC/716/2019, CC/559/2019, CC/832/2019, CC/271/2019, CC/284/2019, CC/378/2019, CC/650/2019, CC/676/2019, CC/722/2019, CC/660/2019, CC/711/2019, CC/740/2019, CC/840/2019, CC/700/2019, CC/701/2019, CC/857/2019, CC/854/2019, CC/829/2019, CC/310/2019, CC/289/2019, CC/683/2019, CC/720/2019, CC/817/2019, CC/837/2019, CC/865/2019, CC/879/2019, CC/712/2019, CC/735/2019, CC/842/2019, CC/843/2019, CC/685/2019, CC/987/2020. CC/1099/2020 & CC1616/2020 , Complainants : SumanKumari & Others, Respondent : M/s Agrani Group of Companies
02 Jul 2021PROCEEDING : M/s Pallavi Raj Construction Pvt. Ltd, Projects: Mumbai Residency/Bollywood Residency AB/Goa City Vs. Authorized Representative of RERA.
30 Jun 2021आज 30-06-2021 के समाचार पत्रों में पल्लवी राज कंस्ट्रक्सन प्राईवेट लिमिटेड से संबंधित प्रकाशित समाचारों की ओर प्राधिकार का ध्यान आकृष्ट हुआ और इस संबंध में प्राधिकार आम जन को निम्नांकित प्रमुख बाते बताना चाहता है .
30 Jun 2021Notice : Our attention has been drawn to the news item related to Palviraj Construction Pvt Ltd published in several newspapers today on 30.6.2021. In this connection, attention of all concerned is invited to the following facts.
29 Jun 2021Proceeding : Case No.CC/1126/2020, CC/1055/2020, CC/1424/2020, CC/1439/2020, CC/1448/2020, CC/1487/2020, CC/1511/2020, CC/1665/2020, CC/1781/2020, CC/1798/2020, CC/135/2021, CC/907/2020, CC/1024/2020, CC/1160/2020, CC/1199/2020, CC/1335/2020, CC/1780/2020, CC/1782/2020, CC/146/2021, CC/420/2021, CC/168/2018, CC/169/2018, CC/170/2018, CC/171/2018, CC/172/2018, CC/187/2018, CC/209/2019, CC/293/2019, CC/723/2019, CC/758/2019 AO/187/2020, CC/942/2020, CC/1076/2020, CC/1130/2020, CC/1498/2020 AO/480/2020, CC/1582/2020 AO/533/2020, CC/1583/2020, CC/15846/2020 AO/534/2020, CC/11585/2020 AO/535/2020, CC/11586/2020 AO/536/2020, CC/1587/2020, CC/1713/2020 AO/583/2020, CC/1714/2020 AO/584/2020, CC/1770/2020 AO/617/2020, CC/613/2019, CC/649/2019, CC/688/2019, CC/6689/2019, CC/690/2019, CC/691/2019, CC/730/2019, CC/751/2019, CC/833/2019, CC/863/2019, CC/866/2019, CC/1009/2020, CC/1140/2020, CC/11530/2020, CC/1579/2020, CC/1615/2020, CC/1756/2020, CC/11762/2020, CC/30/2021, CC/166/2021, CC/377/2021, CC/311/2019, CC/352/2019, CC/417/2019, CC/692/2019, CC/695/2019, CC/713/2019, CC/731/2019, CC/794/2019, CC/816/2019, CC/909/2020, CC/914/2020, CC/1047/2020, CC/1068/2020, CC/1069/2020, CC/1077/2020, CC/1096/2020, CC/1097/2020, CC/1141/2020, CC/1261/2020, CC/1395/2020, CC/1779/2020, CC/67/2021, CC/314/2021, CC/368/2021 & CC/369/2021, Complainant : Ajay Kumar Mishra/Savitri Devi/Meera Gupta/Sanjay Kumar Gupta/ Amit Raj Kamal/Mithilesh Kumar/Chhaya Lal/Karali Patra/Seema Kumari/Shivendu Kumar Mishra/Rita Singh/Lalan Prasad Singh/ Punam Mishra/Bineeta Kumari/Vijay Kumar Pandey/Aryan Pushpjeet/Rajiv Kumar/Santosh Kumar/Navneet Sharma/Kumar Gaurav/BaijooMistri/Bam Shankar Chaudhary/Koushlendra Kumar/Ran Avay Kumar/Sudhir Kumar Singh/Babita Devi/Kumari Anjana/Dineshwar Dubey/Dhananjay Kumar Singh/Subodh Kumar/Anuj Kumar Sinha/RekhaKumari, Respondent : M/s Agrani Homes Pvt Ltd.
28 Jun 2021Proceedings : Authorized Signatory, RERA Vs. M/s Palviraj Construction, Projects : Mumbai Residency, Bollywood Residency AB, Goa City
28 Jun 2021Proceeding : Case No. CC/465/2019, CC/1084/2020, CC/1210/2020, CC/1211/2020, CC/1086/2020, CC/1323/2020, CC/399/2019, CC/1214/2020, CC/1247/2020, CC/1257/2020, CC/1292/2020, CC/1554/2020, CC/1820/2020, CC/1821/2020, CC/1860/2020, CC/345/2021, CC/647/2019, CC/742/2019, CC/810/2019, CC/1529/2019 AO/1502/2019, CC/970/2019, CC/971/2020, CC/972/2020, CC/973/2020, CC/1004/2020, CC/1022/2020, CC/1025/2020, CC/1085/2020, CC/1087/2020, CC/1088/2020, CC/1089/2020, CC/1090/2020, CC/1091/2020, CC/1092/2020, CC/1103/2020, CC/1104/2020, CC/1128/2020, CC/1132/2020, CC/1133/2020, CC/1134/2020, CC/1135/2020, CC/1202/2020, CC/1203/2020, CC/1204/2020, CC/1205/2020, CC/1206/2020, CC/1213/2020, CC/1224/2020 AO/344/2020, CC/1242/2020, CC/1258/2020, CC/1322/2020, CC/1327/2020, CC/1328/2020 AO/384/2020, CC/1330/2020, CC/1331/2020, CC/1332/2020, CC/1357/2020, CC/1377/2020 AO/403/2020, CC/1393/2020, CC/1394/2020, CC/1397/2020 AO/384/2020, CC/1403/2020, CC/1406/2020, CC/1407/2020, CC/1428/2020 AO433/2020, CC/1429/2020 AO 434/2020, CC/1444/2020 AO/444/2020, CC/1445/2020 AO/445/2020, CC/1489/2020 AO/474/2020, CC/1397/2020 AO/414/2020, CC/1568/2020 AO523/2020, CC/1569/2020 AO/524/2020, CC/1570/2020 AO/525/2020, CC/1705/2020, CC/1706/2020, CC/1728/2020, CC/1775/2020, CC/1776/2020, CC/1794/2020, CC/1861/2020 AO/662/2020, CC/1878/2020, CC/66/2021 AO/43/2021, CC/85/2021, CC/147/2021, CC/148/2021, CC/149/2021, CC/157/2021, CC/158/2021, CC/159/2021, CC/160/2021, CC/160/2021, CC/167/2021, CC/168/2021, CC/169/2021, CC/170/2021, CC/171/2021, CC/230/2021, CC/232/2021, CC/244/2021, CC/245/2021, CC/246/2021, CC/315/2021, CC/321/2021, CC/322/2021, CC/346/2021, CC/347/2021, CC/348/2021, CC/349/2021, CC/350/2021, CC/360/2021, CC/366/2021, CC/367/2021, CC/370/2021, CC/406/2021, CC/415/2021, CC/416/2021, CC/479/2021, CC/480/2021, CC/484/2021, CC/486/2021, CC/487/2021, CC/488/2021, CC/494/2021, CC/506/2021, CC/175/2021 AO/94/2021, CC/229/2021, CC/231/2021, CC/316/2021, CC/1454/2020, CC/1419/2020 AO/427/2020, CC/1430/2020 AO/435/2020, CC/1740/2020 AO/602/2020, CC/1741/2020 AO/603/2020, CC/1742/2020 AO/604/2020, CC/1743/2020 AO/605/2020, CC/1769/2020 AO/616/2020, CC/1804/2020 AO/630/2020, CC/1805/2020 AO/631/2020, CC/1815/2020 AO/633/2020 & CC/1816/2020 AO/634/2020, Complainant : Arvind Kumar & others, Respondent : M/s Shine City Infra Projects Pvt Ltd.
21 Jun 2021Proceeding : Case No. CC/1679/2020; CC/1680/2020; CC/1681/2020; CC/1709/2020; CC/1783/2020; CC/1877/2020; CC/1858/2020; CC/1876/2020; CC/1792/2020; CC/1784/2020; CC/1845/2020; CC/362/2021; CC/78/2021; CC/110/2021; CC/111/2021, Complainants : Sanjeet Kumar/ Indu Shekhar Singh/ Dhaneshwari Singh/ Sunil Kumar/ Dr. Nidhi Rani/ Rakesh Kumar/ Sangita Kumar/ Suman Kumar Singhania/ Mr. Kaushal Kishore/ Dadan Kumar/ Smita Priyrdarshi/ Ranjana Singh/ Rajiv Ranjan Sinha/ Rajiv Ranjan Daftaur/ Anupama Singh/ Satyendra Kumar Srivastava/ Raja Ram Prasad/ Sumita Prasad/ Sanjay Kumar Jaiswal/ Arun Kumar Jaiswal/ Manoj Kumar Choudhary/ Sandeep Kumar Respondent : M/s DDL Infratech Pvt. Ltd.
21 Jun 2021Proceeding : Case No. CC/08/2018; CC/419/2019; CC/1023/2020; CC/1707/2020; CC/236/2021; CC/341/2021, Complainants : Sanjay Kumar/ Anil Kumar/ Mukesh Kumar/ Chandramani Devi/ Abhishek Arun/ Shyama Kumari, Respondent : M/s Rukmani Buildtech Pvt. Ltd.
18 Jun 2021Proceeding : Case No.CC/168/2018, CC/169/2018, CC/170/2018, CC/171/2018, CC/172/2018, CC/187/2018, CC/209/2019, CC/293/2019, CC/723/2019, CC/1130/2020, CC/1583/2020, CC/1587/2020, CC/ 1101/2020 AO/320/2020, CC/1498/2020 AO/480/2020,CC/1582/2020 AO/533/2020, CC/1584/2020 AO/534/2020, CC/1585/2020 AO/535/2020, CC/1586/2020 AO/536/2020, CC/1770/20202 AO/617/2020, CC/1713/2020 AO/583/2020, CC/1714/2020 AO/584/2020, CC/203/2019, CC/1010/2020, CC/1011/2020, CC/264/2019, CC/279/2019, CC/372/2019, CC/807/2019, CC/812/2019, CC/844/2019, CC/967/2020, CC/1003/2020, CC/1624/2020 Complainant : Ajay Krishna & Others. Respondent : M/s Agrani Homes Pvt Ltd.
17 Jun 2021Proceeding : Case No. CC/885/2020, CC/886/2020, CC/899/2020, CC/900/2020, CC/1066/2020, CC/1067/2020, CC/1195/2020, CC/1196/2020, Complainant : Raj Kumari/Chandradeo Ram/Kalindi Singh/Samarh Priyadarshi/Priyatosh Kr/Kumar Rohit/Ajit Kr Suma/Madhuri Prasad . Respondent : M/s Superb Buildtech Pvt. Ltd.
17 Jun 2021Proceeding : Case No. CC/08/2018, CC/419/2019, CC/1023/2020, CC/1707/2020, CC/236/2021 & CC/341/2021, Complainant : Sanjay Kumar/Anil Kumar/Mukesh Kumar/Chandramauli Devi/Abhishek Arun/Shyama Kumari. Respondent : M/s Rukmani Buildtech Pvt. Ltd.
17 Jun 2021Proceedings : Authorised Signatory, RERA vs M/s Agrani group of companies
15 Jun 2021Proceeding : Case No.CC/1126/2020, CC/11055/2020, CC/135/2021, CC/907/2020, CC/1335/2020, CC/1780/2020,CC/146/2021, CC/363/2021, CC/613/2019, CC/649/2019, CC/691/2019, CC/730/2019,CC/751/2019,CC/833/2019,CC/863/2020, CC/1009/2020, CC/1140/2020, CC/1539/2020,CC/1579/2020,CC/1615/2020,CC/1762/2020,CC/30/2021,CC/166/2021, CC/377/2021, CC/417/2019, CC/713/2019, CC/731/2019, CC/794/2019, CC/816/2019, CC/909/2020,CC/914/2020,CC/1068/2020,CC/1069/2020,CC/1077/2020,CC/1096/2020,CC/1097/2020,CC/1141/2020,CC/1261/2020, CC/1395/2020,CC/67/2021,CC/314/21, CC/368/2021, CC/369/2021, CC/692/2019 & CC/866/2019, Complainants : Pranay Kumar/Santosh Kumar/Manoj Kumar/Rameshwar Nath Prasad/Arbind Prakash Ranjan/Sushil Kumar/Abhishek Kumar/Madan Kumar Srivastava/Dr Bhola Kumar Singh/Ashok Kumar Singh/Kunal Kumar/Neelam Pathak/Ravi Kant Das/Manju Devi/Anita Devi/Soni Kumari/Awadhesh Kumar Mishra/Urmila Gupta/Bandana kumara &Malti Sahay/Dr Vineet Sinha/Madhuri Kumari/Santosh Kumar &MamtaChaudhary/Preeti Verma/Sugandha Jha/Abhishek Kumar/Dolly Singh/Sumit Ghosh/Rakesh Kumar Prasad/Kanahya Prasad Sinha/Nagendra Kumar/Mohammad Shahzeb/Md SaoodAlam/Md Irshad Ahmad/Shyam Bihari Singh/Dharmaveer Singh/Alka Singh/Anita Kumari Verma/Shashikant Sinha/Rakesh Kumar/Siddheshwar Pathak/Anupam Shukla/Rubi Bala/Murari Prasad/Aman Kumar/Mala Sinha Respondent : M/s Agrani Homes Pvt Ltd
14 Jun 2021Important Notice : Online applications for registration of Projects/Agents and submission of complaints.
14 Jun 2021PROCEEDING : Case Nos. CC/1609/2020, CC/1610/2020, CC/1611/2020, CC/1612/2020, CC/1623/2020, Complaints : Karuna Kumari Alias Karuna Kumari Roy / Lakshman Singh/ Rahul Jawahar/ Ranjana Sharma/ Ashok Kumar Singh, Respondent : M/s DDL Infratech Pvt. Ltd
14 Jun 2021Proceeding : RERA/CC/319/2019-RERA/AO/59/2019, RERA/CC/407/2019-RERA/AO/220/2019, RERA/CC/1008/2020, RERA/CC/1200/2020 , Complaints : Sri Ram Laddu Rai / M/s Star India Construction Pvt. / Raj Kumar and others / Miss Afsana Begum, Respondent : M/s Star India Construction Pvt. Ltd, Shiv Narayan Yadav and others .
07 Jun 2021Proceeding : Case No.- CC/465/2019;CC/1084/2020;CC/1210/2020;CC/1211/2020;CC/1086/2020; CC/1323/2020;CC/1327/2020;CC/399/2019;CC/1214/2020;CC/1247/2020;CC/1257/2020;CC/1292/2020; CC/1554/2020;CC/1820/2020;CC/1821/2020;CC/1860/2020;CC/345/2021;CC/647/2019;CC/810/2019; CC/970/2020;CC/971/2020;CC/972/2020;CC/973/2020;CC/1004/2020;CC/1022/2020;CC/1025/2020; CC/1085/2020;CC/1087/2020;CC/1088/2020;CC/1089/2020;CC/1090/2020;CC/1091/2020; CC/1092/2020;CC/1103/2020;CC/1104/2020;CC/1128/2020;CC/1132/2020;CC/1133/2020;CC/1134/2020; CC/1135/2020;CC/1202/2020;CC/1203/2020;CC/1204/2020;CC/1205/2020;CC/1206/2020;CC/1213/2020; CC/1242/2020;CC/1258/2020;CC/1322/2020;CC/1330/2020;CC/1331/2020;CC/1332/2020;CC/1357/2020; CC/1393/2020;CC/1394/2020;CC/1403/2020;CC/1406/2020;CC/1407/2020;CC/1728/2020; CC/1775/2020;CC/1776/2020;CC/1794/2020;CC/1878/2020;CC/85/2021;CC/147/2021;CC/148/2021; CC/149/2021;CC/157/2021;CC/158/2021;CC/159/2021;CC/160/2021;CC/167/2021;CC/168/2021; CC/169/2021;CC/170/2021;CC/171/2021;CC/230/2021;CC/232/2021;CC/244/2021; CC/245/2021;CC/246/2021;CC/315/2021;CC/321/2021;CC/322/2021;CC/346/2021;CC/347/2021; CC/348/2021;CC/349/2021;CC/350/2021;CC/360/2021;CC/361/2021;CC/366/2021;CC/367/2021; CC/370/2021;CC/406/2021;CC/415/2021;CC/416/2021;CC/479/2021; CC/480/2021; CC/484/2021; CC/486/2021; CC/487/2021; CC/488/2021; CC/494/2021; CC/506/2021; CC/229/2021; CC/231/2021; CC/316/2021; CC/1454/2020, Complainant/s : Mr. Arvind Kumar Malviya & Others, Respondent/s : M/s ShinecityInfraproject Pvt. Ltd/ M/s Shine City Charioteer of Reliable Service Pvt. Ltd
04 Jun 2021Full Proceeding : cases Nos-CC/396/2019, 111/2018, 112/2018, 175/2018, 213/2019, 2016/2019, 225/2019, 226/2019, 229/2019, 230/2019, 231/2019, 263/2019, 267/2019, 269/2019, 270/2019, 271/2019, 275/2019, 276/2019, 281/2019, 284/2019, 287/2019, 289/2019, 292/2019, 293/2019, 302/2019, 306/2019, 307/2019, 310/2019, 311/2019, 312/2019, 323/2019, 352/2019, 354/2019, 363/2019, 373/2019, 378/2019, 400/2019, 401/2019, 402/2019, 411/2019, 417/2019, 418/2019, 425/2019, 426/2019, 429/2019, 435/2019, 455/2019, 456/2019, 457/2019, 458/2019, 477/2019, 502/2019, 503/2019, 520/2019, 523/2019, 526/2019, 531/2019, 532/2019, 537/2019, 545/2019, 559/2019, 563/2019, 575/2019, 576/2019, 639/2019, 646/2019, 649/2019, 650/2019, 652/2019, 653/2019, 655/2019, 659/2019, 660/2019, 662/2019, 663/2019, 664/2019, 665/2019, 666/2019, 668/2019, 670/2019, 675/2019, 676/2019, 679/2019, 680/2019, 682/2019, 683/2019, 685/2019, 686/2019, 688/2019, 689/2019, 690/2019, 691/2019, 692/2019, 693/2019, 694/2019, 695/2019, 697/2019, 700/2019, 701/2019, 702/2019, 704/2019, 708/2019, 710/2019, 711/2019, 712/2019, 713/2019, 714/2019, 716/2019, 720/2019, 722/2019, 725/2019, 726/2019, 728/2019, 730/2019, 731/2019, 732/2019, 735/2019, 740/2019, 750/2019, 751/2019, 792/2019, 793/2019, 794/2019, 808/2019, 809/2019, 813/2019, 816/2019, 817/2019, 821/2019, 823/2019, 824/2019, 827/2019, 828/2019, 829/2019, 832/2019, 833/2019, 836/2019, 837/2019, 838/2019, 840/2019, 841/2019, 842/2019, 843/2019, 846/2019, 847/2019, 848/2019, 852/2019, 854/2019, 855/2019, 856/2019, 857/2019, 859/2020, 860/2020, 861/2020, 865/2020, 866/2020, 879/2020 Complainants : Suman Kumari and others Respondent : M/s Agrani Homes Pvt. Ltd.
04 Jun 2021Notice Inviting Applications for Internship.
04 Jun 2021Proceedings : cases Nos-CC/396/2019, 111/2018, 112/2018, 175/2018, 213/2019, 2016/2019, 225/2019, 226/2019, 229/2019, 230/2019, 231/2019, 263/2019, 267/2019, 269/2019, 270/2019, 271/2019, 275/2019, 276/2019, 281/2019, 284/2019, 287/2019, 289/2019, 292/2019, 293/2019, 302/2019, 306/2019, 307/2019, 310/2019, 311/2019, 312/2019, 323/2019, 352/2019, 354/2019, 363/2019, 373/2019, 378/2019, 400/2019, 401/2019, 402/2019, 411/2019, 417/2019, 418/2019, 425/2019, 426/2019, 429/2019, 435/2019, 455/2019, 456/2019, 457/2019, 458/2019, 477/2019, 502/2019, 503/2019, 520/2019, 523/2019, 526/2019, 531/2019, 532/2019, 537/2019, 545/2019, 559/2019, 563/2019, 575/2019, 576/2019, 639/2019, 646/2019, 649/2019, 650/2019, 652/2019, 653/2019, 655/2019, 659/2019, 660/2019, 662/2019, 663/2019, 664/2019, 665/2019, 666/2019, 668/2019, 670/2019, 675/2019, 676/2019, 679/2019, 680/2019, 682/2019, 683/2019, 685/2019, 686/2019, 688/2019, 689/2019, 690/2019, 691/2019, 692/2019, 693/2019, 694/2019, 695/2019, 697/2019, 700/2019, 701/2019, 702/2019, 704/2019, 708/2019, 710/2019, 711/2019, 712/2019, 713/2019, 714/2019, 716/2019, 720/2019, 722/2019, 725/2019, 726/2019, 728/2019, 730/2019, 731/2019, 732/2019, 735/2019, 740/2019, 750/2019, 751/2019, 792/2019, 793/2019, 794/2019, 808/2019, 809/2019, 813/2019, 816/2019, 817/2019, 821/2019, 823/2019, 824/2019, 827/2019, 828/2019, 829/2019, 832/2019, 833/2019, 836/2019, 837/2019, 838/2019, 840/2019, 841/2019, 842/2019, 843/2019, 846/2019, 847/2019, 848/2019, 852/2019, 854/2019, 855/2019, 856/2019, 857/2019, 859/2020, 860/2020, 861/2020, 865/2020, 866/2020, 879/2020 Complainants : Suman Kumari and others, Respondent : M/s Agrani Homes Pvt. Ltd
03 Jun 2021Proceedings : cases Nos-,RERA/CC/468/2019, 469/2019, 470/2019, 471/2019, 472/2019, 473/2019, 474/2019, 475/2019, 476/2019, 489/2019, 490/2019, 491/2019, 492/2019, 493/2019, 494/2019, 495/2019, 497/2019, 498/2019, 499/2019, 506/2019, 507/2019, 508/2019, 509/2019, 510/2019, 511/2019, 512/2019, 513/2019, 514/2019, 515/2019, 516/2019, 551/2019, 552/2019, 553/2019, 554/2019, 555/2019, 556/2019, 557/2019, 558/2019, 564/2019, 565/2019, 566/2019, 567/2019, 570/2019, 571/2019, 572/2019, 601/2019, 602/2019, 603/2019, 604/2019, 609/2019, 610/2019, 624/2019, 1609/2020, 1610/2020, 1612/2020, 1161/2020, 1623/2020, 1677/2020, 1679/2020, 1680/2020, 1681/2020, 1709/2020, 1772/2020, 1890/2020, 1080/2020, 1773/2020, 1783/2020, 1877/2020, 1858/2020, 1876/2020, 1811/2020, 1792/2020, 1784/2020, 977/2020, 935/2020, 952/2020, 1845/2020, 1689/2020, 992/2020, 78/2021, 110/2021, 111/2021, 178/2021, 179/2021, 291/2021, 355/2021, 362/2021, 1657/2020, 1658/2020, 976/2020, 975/2020, 974/2020, 1162/2020, 1163/2020, 1164/2020, 1102/2020, 1194/2020, 1165/2020, 1079/2020, 82/2021, 112/2021, 113/2021, 211/2021, 356/2021, 1166/2020, 1226/2020 & 1678/2020 Complainants : Vikash Kumar and others, Respondent : M/s D.D.L. Infratech Pvt. Ltd.
03 Jun 2021Full Proceedings : Case Nos.CC/468/2019, CC/469/2019, CC/470/2019, CC/471/2019, CC/472/2019, CC/473/2019, CC/474/2019, CC/475/2019, CC/476/2019, CC/489/2019, CC/490/2019, CC/491/2019, CC/492/2019, CC/493/2019, CC/494/2019, CC/495/2019, CC/497/2019, CC/498/2019, CC/499/2019, CC/506/2019, CC/507/2019, CC/508/2019, CC/509/2019, CC/510/2019, CC/511/2019, CC/512/2019, CC/513/2019, CC/514/2019, CC/515/2019, CC/516/2019, CC/551/2019, CC/552/2019, CC/553/2019, CC/554/2019, CC/555/2019, CC/556/2019, CC/557/2019, CC/558/2019, CC/564/2019, CC/565/2019, CC/566/2019, CC/567/2019, CC/570/2019, CC/571/2019, CC/572/2019, CC/601/2019, CC/602/2019, CC/603/2019, CC/604/2019, CC/609/2019, CC/610/2021, CC/624/2019, CC/1609/2020, CC/1610/2020, CC/1611/2020, CC/1612/2020, CC/1161/2020, CC/1623/2020, CC/1677/2020, CC/1679/2020, CC/1680/2020, CC/1681/2020, CC/1709/2020, CC/1772/2020, CC/1890/2020, CC/1080/2020, CC/1773/2020, CC/1783/2020, CC/1877/2020, CC/1858/2020, CC/1876/2020, CC/1811/2020, CC/1792/2020, CC/1784/2020, CC/977/2020, CC/935/2020, CC/952/2020, CC/1845/2020, CC/1689/2020, CC/992/2020, CC/78/2021, CC/110/2021, CC/111/2021, CC/178/2021, CC/179/2021, CC/291/2021, CC/355/2021, CC/362/2021, CC/1657/2020, CC/1658/2020, CC/976/2020, CC/975/2020, CC/974/2020, CC/1162/2020, CC/1163/2020, CC/1164/2020, CC/1102/2020, CC/1194/2020, CC/1165/2020, CC/1079/2020, CC/82/2021, CC/112/2021, CC/113/2021, CC/211/2021, CC/356/2021, CC/1166/2020, CC/1226/2020 & CC/1678/2020, Complainants : Mr.Vikas Kumar & Others, Respondent : M/s DDL Infratech Pvt. Ltd.
31 May 2021Extension of last date of submission of Completion certificate(CC) / Occupancy certificate, (OC) formation of Association, Execution of registered conveyance deed etc. up to 15-June-2021.
25 May 2021रेरा कार्यालय, बिहार को दिनांक 26/05/2021 से 01/06/2021 तक बंद किया जाता है।
15 May 2021रेरा कार्यालय, बिहार को दिनांक 16/05/2021 से 25/05/2021 तक बंद किया जाता है।
14 May 2021प्रभार ग्रहण प्रतिवेदन नवीन वर्मा |
04 May 2021Ensuring vaccination of 100% construction labours and other workers of your organisation with effect from 1 May 2021 in a Mission Mode.
04 May 2021रेरा कार्यालय, बिहार को दिनांक 05/05/2021 से 15/05/2021 तक बंद किया जाता है।
01 May 2021Office Order :Hearing of the Complaints cases will remain suspended during the period till 16th of May, 2021.
30 Apr 2021Important Notice : Promoters of RERA registered Projects whose Projects have been completed.
24 Apr 2021Office Order : Hearing of the Complaints cases will remain postponed till 30th of April, 2021.
17 Apr 2021Important Notice for Real Estate Promoters/ Agents regarding project registration and also for all any compliance in RERA, Bihar.
14 Apr 2021Office Order : Everyone in RERA, Bihar will work from home in the 4(four) working days till 25th April, 2021. (2.) Online hearings will resume from 26th April, 2021.
12 Apr 2021Office order
08 Apr 2021Interim Order : Case No.- CC/262/2019; CC/339/2019; CC/340/2019; CC347/2019 Complainants: Devanti Devi/Jeetendra/Manoj Kumar/Shkuntala Devi Respondene : M/S Galaxia Townshiip and Housing Pvt. Ltd.
05 Apr 2021कार्यालय आदेश
05 Apr 2021Submission of Statement of Accounts for the FY 2019-20 of the Real Estate Projects duly audited by the Chartered Accountants.
05 Apr 2021Submission of Completion certificate / Occupancy certificate, formation of Association, Execution of registered conveyance deed etc.
23 Mar 2021PROCEEDING : Case Nos. CC168/169/170/171/172/187/203/209/264/ 279/293/372/723/807/812/863/942/967/987/1114/1115/1117/1130/1150/1153/1160/1179/1180/1192/1230/1252/1424 of 2019, Complainants : Ajay Krishna & Ors, Respondent : M/s Agrani Homes Pvt. Ltd.
18 Mar 2021Plans submitted by Agrani Group of companies to RERA, Bihar.
17 Mar 2021Proceeding : Proceeding : Case No. 795/2020, Complainant : Baptist Union Church, Opposite Pary : M/S Utkarsh Sfatik Limited.
15 Mar 2021Proceeding : cases Nos-CC/396/400/401/402/411/417/418/425/426/429/435/455/456/457/458/477/503/213/216/289/293/310/ 175/302/275/231/378/111/271/263/352/311/312/267/229/230/225/226/269/270/276/281/284/287/292/306/307/323/363/502/ 354/373/520/523/526/531/537/545/559/563/575/576/112/532/639/646/649/650/652/653/655/659/660/662/663/664/665/666/ 668/670/675/676/679/680/682/683/685/686/688/689/690/691/692/693/694/695/697/714/713/716/720/722/725/726/728/730/731/732 Complainants : Suman Kumari and others, Respondent : M/s Agrani Homes Pvt. Ltd.
12 Mar 2021List of REGISTERED DEEDs of Absolute Sale/ Development Agreements Submited in RERA by M/s Agrani Group of Companies
12 Mar 2021Proceeding : Case Nos. CC168/169/170/171/172/187/203/ 209/264/ 279/293/372/723/807/812/863/942/967/987/1114/1115/1117/1130/1150/1153/1160/1179/1180/1192/1230/1252/1424 Complainants : Ajay Krishna & Ors Respondent : M/s Agrani Homes Pvt. Ltd.
10 Mar 2021Proceeding : Proceeding : Case No. 795/2020, Complainant : Baptist Union Church, Opposite Pary : M/S Utkarsh Sfatik Limited.
10 Mar 2021OFFICE ORDER : Audited statement of accounts of each project for F. Y. 2019-20 duly certified and signed by a Chartered Accountant in practice by 31st March 2021.
08 Mar 2021Notice : Following work will be done from new premises.
05 Mar 2021Proceeding : cases Nos- CC/396/400/401/402/411/417/418/425/426/429/435/455/456/457/458/477 /503/213/216/289/293/310/175/302/275/231/378/111/271/263/352/311/312/267/229/230/225/226/269/270/276/281/284/287/ 292/306/307/323/363/502/354/373/520/523/526/531/537/545/559/563/575/576/112/532/639/646/649/650/652/653/655/659/660/ 662/663/664/665/666/668/670/675/676/679/680/682/683/685/686/688/689/690/691/692/693/694/695/697/713/714/716/720/722/725/ 726/728/730/731/732, Complainants :Suman Kumari and others, Respondent : M/s Agrani Homes Pvt. Ltd.
01 Mar 2021INTERIM ORDER : Case No. CC/734/2019; CC/1543/2020 & CC/1733/2020, Complainants : Sharmila Devi/ Seema Singh/ Ram Bhagwan Singh, Respondent : M/s Amina Construction Pvt. Ltd
26 Feb 2021Proceeding : Case No. 795/2020, Complainant : Baptist Union Church, Opposite Pary : M/S Utkarsh Sfatik Limited.
26 Feb 2021INTERIM ORDER : Case No. SM/461/2020, Respondent : M/s Palvi Raj Construction Pvt. Ltd.
26 Feb 2021Proceeding : Case No. 795/2020, Complainant : Baptist Union Church, Bakarganj, Opposite Party : M/s Utkarsh Sfatik Limited.
23 Feb 2021Proceeding :Case Nos. CC168/169/170/171/172/187/203/209/264 279/293/372/723/807/812/863/942/967/987/1114/1115/1117/ 1130/1150/1153/1160/1179/1180/1192/1230/1252/1424 of 2019, Complainants :Ajay Krishna & Ors, Respondent : M/s Agrani Homes Pvt. Ltd
19 Feb 2021Proceeding : Case No. 795/2020, Complainant : Baptist Union Church, Bakarganj, Opposite Party : M/s Utkarsh Sfatik Limited.
19 Feb 2021Freezing of Bank Accounts by State Bank of India.
18 Feb 2021Proceeding : cases Nos- CC/396/400/401/402/411/417/418/425/426/429/435/455/456/457/458/477 /503/213/216/289/293/310/175/302/275/231/378/111/271/263/352/311/312/267/229/230/225/226/269/270/ 276/281/284/287/292/306/307/323/363/502/354/373/520/523/526/531/537/545/559/563/575/576/112/532/639/ 646/649/650/652/653/655/659/660/662/663/664/665/666/668/670/675/676/679/680/682/683/685/686/688/689/690 /691/692/693/694/695/697/713/714/716/720/722/725/726/728/730/731/732, Complainants : Suman Kumari and others, Respondent : M/s Agrani Homes Pvt. Ltd.
12 Feb 2021Proceeding : Case No. 795/2020, Due to non-availability of Member, the hearing fixed today is postponed and fixed for 19th february, 2021.
10 Feb 2021PROCEEDING : Cases Nos-CC/396/400/401/402/411/417/418/425/426/429/435/455/456/457/458/477/503/213/216/289/293/310/175/ 302/275/231/378/111/271/263/352/311/312/267/229/230/225/226/269/270/276/281/284/287/292/306/307/ 323/363/502/354/373/520/523/526/531/537/545/559/563/575/576/112/532/639/646/649/650/652/653/655/659/660/ 662/663/664/665/666/668/670/675/676/679/680/682/683/685/686/688/689/690/691/692/693/694/695/697/713/714/716 /720/722/725/726 /728/730/731/732, Respondent : M/s Agrani Homes Pvt. Ltd.
08 Feb 2021PROCEEDING : Case Nos. CC168/169/170/171/172/187/203/209/264/279/293/372/723/807/812/863/942/967/987/1114/1115/1117/ 1130/1150/1153/1160/1179/1180/1192/1230/1252/1424 of 2019 Respondent : M/s Agrani Homes Pvt. Ltd.
05 Feb 2021PROCEEDING : Case No. 795/2020, Respondent M/S Utkarsh Sfatik Limited.
28 Jan 2021PROCEEDING : Case Nos. CC-168/169/170/171/172/187/203/209/293/723/1130/264/279/372/807/812 and 967. Respondent M/S Agrani Homes Pvt. Ltd.
27 Jan 2021PROCEEDING : Case No. 795/2020, Respondent M/S Utkarsh Sfatik Limited.
25 Jan 2021PROCEEDING : cases Nos - CC/396/400/401/402/411/417/418/425/426/429/435/455/456/457/458 /477/503/213/216/289/293/310/175/302/275/231/378/111/271/263/352/311/312/267/229/230/225 /226/269/270/276/281/284/287/292/306/307/323/363/502/354/373/520/523/526/531/537/545/559 /563/575/576/112/532/639/646/649/650/652/653/655/659/660/662/663/664/665/666/668/670/675 /676/679/680/682/683/685/686/688/689/690/691/692/693/694/695/697/714/716 /720/722/725/726 /728/730/731/732 Respondent : M/s Agrani Homes Pvt. Ltd.
14 Jan 2021Due to non-availability of one Member of the Bench, the hearing of this case fixed on 01.12.2020 was postponed. Now the date of hearing of this case is fixed on 21.01.2021 at 3.30 P.M. Through online VC.
14 Jan 2021Due to non-availability of one Member of the Bench, the hearing of this case fixed on 27.11.2020 was postponed. Subsequenty, another Member of the Bench has since retired. The date of hearing of this case is now fixed on 25.01.2021 at 3.30 P.M. Through online VC.
14 Jan 2021Due to non-availability of one Member of the Bench, the hearing of this case fixed on 09.12.2020 was postponed. Subsequenty, another Member of the Bench has since retired. The date of hearing of this case is now fixed on 28.01.2021 at 3.30 P.M. Through online VC.
10 Dec 2020Office Order : Two personnel of RERA office have tested positive for Covid-19 same others are showing symptoms of the same.
08 Dec 2020Due to non-availability of one Member of the Bench, the matter fixed before the Full Bench on 09-12-2020 is postponed. Fresh date will be intimated later.
30 Nov 2020Due to non-availability of one Member of the Bench, the matter fixed before the Full Bench on 01-12-2020 is postponed. Fresh date will be intimated later.
26 Nov 2020Due to non-availability of one Member of the Bench, the matter fixed before the Full Bench on 27-11-2020 is postponed. Fresh date will be intimated later.
23 Nov 2020This is to inform that Hearing of Single Bench cases before Hon’ble Mr. R.B. Sinha (Member) and Double Bench cases have been adjourned till further orders.
13 Nov 2020Two Delhi-based builders arrested for duping about 250 buyers of Rs 29 crore
13 Nov 2020Noida Police registers FIR against Wave Mega City Centre directors
13 Nov 2020Amrapali Group’s directors arrested in cheating case
12 Nov 2020INTERIM ORDER : CC/101/2019, Complainant : Sudhir Kumar Dubey, Respondent : M/S Shambhavi Buildcon Pvt. Ltd.
11 Nov 2020PROCEEDING : cases Nos - CC/396/400/401/402/411/417/418/425/426/429/435/455/456/457/458 /477/503/213/216/289/293/310/175/302/275/231/378/111/271/263/352/311/312/267/229/230/225 /226/269/270/276/281/284/287/292/306/307/323/363/502/354/373/520/523/526/531/537/545/559 /563/575/576/112/532/639/646/649/650/652/653/655/659/660/662/663/664/665/666/668/670/675 /676/679/680/682/683/685/686/688/689/690/691/692/693/694/695/697/713/714/716 /720/722/725/726 /728/730/731/732, Complainants : Suman Kumari and others, Respondent : M/s Agrani Homes Pvt. Ltd.
06 Nov 2020PROCEEDING : Case No.795/2020, Complainant : Baptist Union Church, Respondent : M/s Utkarsh Sfatik Limited
05 Nov 2020Big relief for homebuyers: SC says builder-buyer agreement must be considered as flat allotment date, not when project got RERA registered
04 Nov 2020PROCEEDING : Case Nos. CC168/169/170/171/172/187/203/209/264 /279/293/372/723/807/812/863/942/967/987/1114/1115/1117/1130/1150/1153/1160/1179/1180/1192/1230/1252/1424 of 2019 , Complainants : Sri Ajay Krishna & Ors, Respondent : M/s Agrani Homes Pvt. Ltd.
29 Oct 2020???? ???????? ?????? 30-10-2020 ?? 03-11-2020 ?? ??? ????? |
16 Oct 2020PROCEEDING : cases Nos - CC/396/400/401/402/411/417/418/425/426/429/435/455/456/457/458 /477/503/213/216/289/293/310/175/302/275/231/378/111/271/263/352/311/312/267/229/230/225 /226/269/270/276/281/284/287/292/306/307/323/363/502/354/373/520/523/526/531/537/545/559 /563/575/576/112/532/639/646/649/650/652/653/655/659/660/662/663/664/665/666/668/670/675 /676/679/680/682/683/685/686/688/689/690/691/692/693/694/695/697/714/716 /720/722/725/726 /728/730/731/732, Complainants : Suman Kumari and others, Respondent : M/s Agrani Homes Pvt. Ltd.
12 Oct 2020PROCEEDING : Case No. 795/2020, Complainant : Mr. Rev. Moses, Respondent : M/s Utkarsh sfatik Limited
09 Oct 2020PROCEEDING : Case No.-CC/168/169/170/171/172/187/203/209/293/723/264/279/372 of 2019 , Complainants : Sri Ajay Krishna & Others, Respondent : M/s Agrani Homes Pvt. Ltd.
07 Oct 2020PROCEEDING : Case No. CC/396/400/401/402/411/417/418/425/426/429 /435/455/456 /457/458/477/503/213/216/289/293/310/175/302/275/231/378/111/271/263/352/311/ 312/267/229/230/225/226/269/270/276/281/284/287/292/306/307/323/363/502/354/ 373/520/523/526/531/537/545/559/563/575/576/112/532/639/646/649/650/652/653/ 655/659/660/662/663/664/665/666.668/670/675/676/679/680/682/683/685/686/688/ 689/690/691/692/693/694/695/697/714/716/720/722/725/726/728/730/731/732 Complainants : Suman Kumari and others, Respondent :M/s Agrani Homes Pvt. Ltd.
30 Sep 2020PROCEEDING : Case Nos. CC168/169/170/171/172/187/203/ 209/ 293/ 723/ 264/ 279/ 372 of 2019 Complainants :Sri Ajay Krishna & Ors, Respondent : M/s Agrani Homes Pvt. Ltd. on 25-09-2020
29 Sep 2020PROCEEDING : Case No. CC/396/400/401/402/411/417/418/425/426/429/435/455/456/ 457/458/477/503/213/216/289/293/310/175/302/275/231/378/111/271/263/352/311/312/267/229/230/225/226/269/270/276/ 281/ 284/ 287/ 292/ 306/307/ 323/363/502/354/373/520/523/526/531/ 537 /545/559/563/575/576/112/ 532/639/ 646/649/650/652 /653/ 655/659/ 660/ 662/663/ 664/665/666.668/670/675/676/ 679/680/ 682/683/685/ 686/ 688/ 689 /690/ 691 /692 /693/ 694/695/ 697/ 714/ 716/720/ 722/725/726/728/730/731/ 732 & Ors, Respondent M/s Agrani Homes Pvt. Ltd on 24-09-2020
28 Aug 2020Notice inviting Tender of Selection of Agency for Supply, Installation, Commissioning and Maintenance of 50 Mbps Internet leased line Including Supply of required hardware Router/Modems/Converters/fibre/Mux etc. at the switch board of at RERA, Bihar
26 Aug 2020Notice for E-Hearing
26 Aug 2020RPF:- Notice inviting Tender of Selection of Agency for Provision of dais i/c carpet etc. in Court room on ground floor and 2nd floor of Patel nagar exchange (New office) Patna
17 Aug 2020RERA office shall continue to function with reduced strength on each working day from 18/08/2020 till 04/09/2020 as per the roster that was circulated separately on 02/08/2020.
02 Aug 2020RERA office shall continue to function with reduced strength on each working day from 03/08/2020 till 14/08/2020 as per the roster that is being circulated separately
17 Jul 2020The office of RERA will remain closed till Sunday, 02-08-2020
09 Jul 2020RERA office shall remain closed from 10-07-2020 to 19-07-2020.
30 Jun 2020RERA office shall continue to function with reduced strength on each working day as per the roster that is being circulated separately.
31 May 2020RERA office shall continue to function with 50% strength on each working day as per the roster that is being circulated separately.
19 Apr 2020Office Order : The office of RERA will remain functional from 20.4.2020.
15 Apr 2020Office order : Employees, whose services have been outsourced to RERA by BELTRON, shall be paid the amount of monthly wages / remuneration, as received by them after necessary deductions, for the months of March and April 2020, as an advance, directly by RERA.
14 Apr 2020OFFICE ORDER :Bihar RERA office shall remain closed till Sunday 3 May 2020.
05 Apr 2020OFFICE ORDER : Bihar RERA office shall remain closed till Tuesday 14 April 2020.
22 Mar 2020OFFICE ORDER : RERA office shall remain closed from Monday 23 March 2020 till Monday 6 April 2020.
14 Mar 2020Office order : There will be no hearing of cases from 16 to 31 March 2020.
25 Feb 2020Request for Proposal (RFP) for Empanelment of CAG empanelled CA firms. Last date extended up to 20th March, 2020 till 5:00 PM
06 Feb 2020Corrigendum : Consultant , Architecture and Consultant Finance
28 Jan 2020Hiring of consultant, Finance On Short Term Contract Basis, Last Date 14th February 2020 till 5:00 PM.
28 Jan 2020Hiring of consultant, Architecture On Short Term Contract Basis, Last Date 14th February 2020 till 5:00 PM.
27 Jan 2020Request for Proposal (RFP) for Empanelment of CAG empanelled CA firms. Last date 20th February 2020 till 3.00 PM
24 Jan 2020Attention: Promoters of RERA registered projects which have been completed. Submission of Completion certificate / Occupancy certificate, formation of Association, Execution of registered conveyance deed etc.
21 Jan 2020WALK IN INTERVIEW FOR HIRING OF DEPUTY CONTROLLER OF ACCOUNTS , DEPUTY CONTROLLER OF AUDIT AND SUPERVISOR OF ACCOUNTS ON SHORT TERM CONTRACT BASIS HAS BEEN EXTENDED ON 28|29-JAN-2020 AT 03:00 PM.
10 Jan 2020WALK IN INTERVIEW FOR HIRING OF DEPUTY CONTROLLER OF ACCOUNTS , DEPUTY CONTROLLER OF AUDIT AND SUPERVISOR OF ACCOUNTS ON SHORT TERM CONTRACT BASI ON 21|22-JAN-2020 AT 03:00 PM.
08 Jan 2020Notice: Walk in Interview for Hiring of " Coordinator of Court Proceeding " and "Assistant of Court Proceeding" on short term contract basis on 16-01-2020 at 3:00 PM.
23 Dec 2019Important Notice : Promoters/Developers of Real Estate Projects, Submission of Statement of Accounts for the FY 2018-19 of the Real Estate Projects duly audited by the Chartered Accountants.
20 Dec 2019Walk in Interview for : Hiring of " Coordinator of Court Proceeding " and "Assistant of Court Proceeding" on short term contract basis
12 Dec 2019Notice for Interview : Invitation of application for Internship from Law Graduates of National Law Universities and other Universities dated 19-12-2019 at 02:30 PM.
12 Dec 2019Notice for Interview : hiring of Consultant, Architecture on short term contract basis dated 18-12-2019 at 02:30 PM.
12 Dec 2019Notice for Interview : hiring of Consultant, Media on short term contract basis dated 18-12-2019 at 02:30 PM.
12 Dec 2019Notice for Interview : hiring of Consultant, Finance on short term contract basis dated 20-12-2019 at 02:30 PM.
25 Oct 2019Notice for extension of last date of submission of Applications for legal Internship upto 8-11-2019 till 5.00 P.M
25 Oct 2019Notice for extension of last date of submission of Applications for 1. Consultant, Finance 2. Consultant, Architecture and 3. Consultant, Finance upto 8-11-2019 till 5.00 P.M
04 Oct 2019Important Notice : Audited Statement of Accounts of Each Project for the year 2018-19 by 31-10-2019.
27 Sep 2019Invitation of application for Internship from Law graduates of National Law Universities and other Universities. Last date 14-10-2019
27 Sep 2019Hiring of Consultant Finance, Architecture, Media on Short Term Contract Basis.
25 Sep 2019Important Notice : 1st National RERA Conclave is going to be organised at Lucknow, U.P.
09 Sep 2019Notice : Hiring of Retired Personnel for Various Post on Short Term Contract Basis, Interview on 11 sep. 2019 at 4:00 PM.
29 Aug 2019Hiring of Retired Personnel on Various Post on Short Term Contract Basis
29 Aug 2019Notice for Request for Proposal of Selection of C.A firms for conducting audit of RERA Bihar.
21 Aug 2019Notice : Request for proposal for salection of C.A. firms for conducting audit of RERA, Bihar
08 Aug 2019Corrigendum for proposal (RFP) for selection of chartered Accountants’ firms for conducting Audit of Real Estate Regulatory Authority, Bihar for financial Year 2018-19
29 Jul 2019Request for proposal (RFP) for selection of chartered Accountants’ firms for conducting Audit of Real Estate Regulatory Authority, Bihar for financial Year 2018-19
09 Jun 2019Don’t move into a house without an Occupancy Certificate, it’s illegal
27 May 2019Registration Department : Order for Non-Registration of Apartments/Plots or land.
27 May 2019Registration Department : Order for Non-Registration of Apartments/Plots or land.
04 Apr 2019Assistance for uploading application online for promoters, agents and complainants.
05 Feb 2019List of Promoters/Developers along with their Projects against whom Suo Motu Notices have been issued in the last week (28 January - 1 February 2019) for non registration/noncompliance with Section 3 of the Real Estate (Regulation and Development) Act, 2016
01 Feb 2019Important Notice: Increase in the Late fee charges for Promoters/Developers of Ongoing Real Estate Projects
29 Jan 2019Office order regarding fees for various services provided by RERA.
02 Jan 2019List of Promoters/Developers along with their Projects against whom Suo Motu Notices have been issued in the last week of December, 2018 for non registration/noncompliance with Section 3 of the Real Estate (Regulation and Development) Act, 2016
28 Dec 2018Important Notice: Registration of Ongoing Real Estate Project (Residential/Commercial/Mixed/Plotted development) with Authority
20 Dec 2018 List of Promoters/Developers along with their Projects against whom Suo Motu Notices have been issued in the third week of December, 2018 for non registration/noncompliance with Section 3 of the Real Estate (Regulation and Development) Act, 2016
14 Dec 2018Kind Attention: Promoters/Developers of Real Estate Projects Submission of Statement of Accounts for the FY 2017-18 of the Real Estate Projects duly audited by the Chartered Accountants
07 Dec 2018List of Promoters/Developers along with their Projects against whom Suo Motu Notices have been issued in the first week of December, 2018 for non registration/noncompliance with Section 3 of the Real Estate (Regulation and Development) Act, 2016
23 Nov 2018List of Promoters/Developers along with their Projectsagainst whom Suo Motu Notices have been issued on November 20, 2018 for non registration/noncompliance with Section 3 of the Real Estate (Regulation and Development) Act, 2016
05 Nov 2018List of Promoters/Developers along with their Projects against whom Show Cause Notices have been issued in November, 2018 for non registration/non-compliance with Section 3 of the Real Estate (Regulation and Development) Act, 2016
02 Nov 2018Important Notice: Late fee of filing applications for registration of ongoing projects date has been extended to 31th December 2018.
03 Oct 2018Quotations are invited from registered printers for printing of greeting cards with envelope and wall calendar for Real Estate Regulatory Authority.
25 Sep 2018Urgent notice for Promoters/developers.
19 Sep 2018Extension of date of registration of ongoing project and revision of late fee charges w.e.f 1st october 2018.
04 Sep 2018Important Notice: Late fee of filing applications for registration of ongoing projects date has been extended to 30th September.
18 Aug 2018Restraint Order of The Authority in terms of Section 36 of the Real Estate(Regulation and Development) Act 2016
11 Aug 201812. View Registered Certificate
10 Aug 2018Display Of Project Details At The Constructions Sites
04 Aug 201811. View Registered Certificate
04 Aug 2018List of Promoters/Developers along with their Projects against whom Show Cause Notices have been issued during the Month of July 2018
for non- registration/non-compliance with the Section 3 of the Real Estate (Regulation and development) Act 2016
30 Jul 2018Extension of the date of submission of Bids for Survey Work
30 Jul 201810. View Registered Certificate
25 Jul 2018Urgent Attention: Promoters/Developers and Builders of all real estate projects ( Residential, Mixed, Commercial and Plotted development)
24 Jul 20189. View Registered Certificate
24 Jul 20181. Agent Registered Certificate
17 Jul 20188. View Registered Certificate
11 Jul 2018Sub: Appointment of Information Technology (IT) Consultant on Contract basis
11 Jul 2018Sub: Appointment of Legal Consultant position on Contract Basis
11 Jul 2018Notice: Quotation
11 Jul 20187. View Registered Certificate
06 Jul 20186. View Registered Certificate
03 Jul 2018Increase in the Late fee charges for Promoters/Developers of Ongoing Real Estate Projects
22 Jun 2018Tender No-3 –Phase 1: Hiring the Services of a professional agency or agencies for Survey of New and Ongoing Real Estate Projects (Residential, Commercial, Mixed
or Plotted development/Sale of Plots), not yet registered or applied for registration with RERA, in the State of Bihar
21 Jun 20185. View Registered Certificate
20 Jun 2018Submission of the list of RERA Registered Real Estate Agents
19 Jun 2018Notices issued to Builders/Promoters/Developers for nonCompliance of Section 3 of the Real Estate (Regulation & Development) Act 2016 during the Period 4th -17th June 2018
14 Jun 2018 Notice Inviting Quotation
14 Jun 2018RERA invites applications for Paid internship from Law graduates of National Law Schools/Universities
08 Jun 20184. View Registered Certificate
04 Jun 2018Corrigendum Letter of E-Quotation
01 Jun 2018Increase in the Late fee charges for Promoters/Developers of Ongoing Real Estate Projects
28 May 2018Corrigendum Letter of E-Quotation
21 May 2018List of Promoters/Developers/Builders that were issued show-cause notices during 7-21st May 2018
21 May 20183. View Registered Certificate
18 May 2018URGENT ATTENTION : Promoter/developer of inordinately Delayed/ Still to be launched Real Estate Projects
18 May 2018URGENT ATTENTION : Consumers/Allottees of inordinately Delayed/ Still to be launched Real Estate Projects
18 May 2018Public Notice
18 May 2018URGENT ATTENTION : Consumers/Allottees of inordinately Delayed/ Still to be launched Real Estate Projects
18 May 2018Public Notice
18 May 2018Important Functions & Duties of Promoters/Agents/Allottees
17 May 2018Notice : Inviting E-quotation for Biding.
03 May 2018Registration of project beyond planning area.
01 May 2018Notice about Late Fee
02 Apr 2018Prabhar Prativedan : Rajiva Bhushan Sinha
02 Apr 2018Prabhar Prativedan: Dr. Subodh Kumar Sinha
14 Mar 2018Prabhar Prativedan: Afzal Amanullah
10 Feb 2018List of fresh Show-Cause Notices issued during last week
10 Feb 2018Defaulter List
10 Feb 20182. View Registered Certificate
10 Feb 20181. View Registered Certificate
(1)For any issues in online registration, please send email on rerabihar[at]gmail[dot]com or rera[at]bihar[dot]gov[dot]in with all details (PAN No. of Promoter is mandatory). (2.) For legal related matters send mail on rerabiharlegal[at]gmail[dot]com with Complaint Case Number.