22 Oct 2021Case Nos.CC/815/2019, Complainants : Nirmala Kumari , Respondent : M/s Technoculture Building Centre Pvt Ltd.1
22 Oct 2021Case Nos.CC/1170/2020, CC/1171/2020, CC/1172/2020, CC/1181/2020, CC/1197/2020,CC/1264/2020, CC/1265/2020 , CC/1287/2020 & CC/1411/2020, Complainants : Pravin Kumar Jaiswal/Sunil Kumar Srivastava/Rakesh Singh/Dinesh Kumar/ Prabhu Dayal Sharma/Rohit Kumar Singh/Rohit Kumar//Ajay Kumar Pandey/ Hari Govind Rai , Respondent : M/s Ghar Lakshmi BuildconPvt Ltd.9
22 Oct 2021Case Nos. CC/1401/2020, Complainants : Gopal Singh, Respondent : M/s Ghar Lakshmi BuildconPvt Ltd.1
22 Oct 2021Case No.CC/500/2019, Complainants : Manoj Kumar Mehta, Respondent : M/s Universal Developers and Infrastructures.1
22 Oct 2021Case Nos.CC/179/2018, Complainants : Kaushalya Devi, Respondent : M/s Arunendra Developers Pvt. Ltd.1
21 Oct 2021Case No. RERA/CC/617/2021, Complainant : Sushma Sinha, Respondent : M/s Raj Construction Pvt. Ltd.1
21 Oct 2021Case Nos.RERA/CC/339/2021, Complainant : Milind Kumar Sinha, Respondent : M/s Shambhai Buildcon Pvt. Ltd.1
18 Oct 2021Case No. CC/1738/2020, Complainants : Damini Maurya, Respondent : M/s Sri Anuanand Construction Pvt Ltd1
18 Oct 2021CC No.CC/867/2020, Complainants : Janki Kumari, Respondent : M/s Bricks Estate Pvt Ltd1
18 Oct 2021Case Nos. CC/505/2019, Complainants : Manoj Kumar Roy , Respondent : M/s Ghar Lakshmi Buildcon Pvt Ltd.1
18 Oct 2021Case Nos. CC/898/2020 , Complainants : Prem Chand Kumar , Respondent : M/s Ghar Lakshmi Buildcon Pvt Ltd.1
18 Oct 2021Case No.CC/45/2021, Complainants : Satyendra Kumar Gupta, Respondent : M/s Ghar Lakshmi BuildconPvt Ltd1
18 Oct 2021Case Nos.CC/986/2020, Complainants : Priti Swaraj , Respondent : M/s Sri Anuanand Construction Pvt Ltd1
09 Oct 2021Corrigendum Case No. RERA/CC/101/2021, Complainant : Garima Kumari, Respondent : M/s Anshul Homes Pvt.Ltd. 0
08 Oct 2021Case No. RERA/CC/655/2021, Complainant : Shailendra Kumar Sinha, Respondent : M/s Mittal Infraspaces Pvt. Ltd1
08 Oct 2021Case No. RERA/CC/101/2021, Complainant : Garima Kumari, Respondent : M/s Anshul Homes Pvt.Ltd.1
05 Oct 2021Case No. RERA/CC/335/2021, Complainant : Rajkumar Vishwakarma, Respondent : M/s Grih Aaramabh Developers Pvt. Ltd1
01 Oct 2021Case No. CC/1729/2020, Complainant : Anuradha Jha, Respondent : M/s Kanishkha Buildcon Pvt Ltd 1
01 Oct 2021Case No. CC/05/2021, Complainant : Sanjeev Kumar, Respondent : M/s Aristo Developers Pvt. Ltd1
24 Sep 2021RERA/CC/1336/2020 & RERA/CC/1337/2020, Complainants :Shailesh Kumar Singh/Fakira Prasad Yadav, Respondent : M/s Anandi Promoters &Developers Pvt Ltd.2
24 Sep 2021RERA/Case no.1336/2020 & RERA/Case no.1337/2020, Complainant : Shailesh Kumar Singh / Fakira Prasad Yadav, Respondent : M/s Anandi Promoters &Developers Pvt Ltd. 2
24 Sep 2021Case No. RERA/CC/1289/2020, Complainant : Mrs. Baijanty Devi, Respondent : M/s Aashmi Realtors Pvt. Ltd. 1
22 Sep 2021Case No.CC/1275/2020-SEC/01/2021, Complainant : Jokhu Paswan, Respondent : M/s Sunit Housing Pvt. Ltd.1
22 Sep 2021Case No.CC/1275/2020-SEC/01/2021, Complainant : Jokhu Paswan, Respondent : M/s Sunit Housing Pvt. Ltd.1
17 Sep 2021Case No.- RERA/CC/561/2021, Complainant : Suneela Pandey , Respondent : M/s Shreeven Homes Pvt. Ltd.1
16 Sep 2021Case No. CC/310/2019, Complainant : Pramod Kumar Dubey, Respondent : M/s Agrani Homes Pvt.Ltd.1
16 Sep 2021Case No. CC/962/2020, Complainant : Mrs. Sushma Srivastava, Respondent : M/s Agrani Homes Pvt.Ltd.1
16 Sep 2021Case No. CC/187/2018, Complainant : Mithilesh Kumar, Respondent : M/s Agrani Homes Pvt. Ltd.1
16 Sep 2021Case No. CC/209/2019, Complainant : Smt Chhaya Rani, Respondent : M/s Agrani Homes Pvt. Ltd.1
16 Sep 2021Case No. CC/293/2019, Complainant : Karali Patra, Respondent : M/s Agrani Homes Pvt. Ltd.1
16 Sep 2021Case No.CC/723/ 2019, Complainant : Smt. Seema Kumari, Respondent : M/s Agrani Homes Pvt. Ltd.1
16 Sep 2021Case No.CC/942/ 2020, Complainant : Ashwini Kumar Tiwari, Respondent : M/s Agrani Homes Pvt. Ltd.1
14 Sep 2021Case No-CC/144/2021, Complainant : Lukky Kumari, Respondent : M/s Sree Hari Developers Pvt.Ltd1
13 Sep 2021Case No.CC/757/2019, Complainant : Vikash Kumar Raj, Respondent : M/s Adharshila Housing Buildcon Pvt Ltd/ M/s Green Ghar Infrastructure and Construction Pvt. Ltd.1
07 Sep 2021Case No. CC/497/2021, Complainant : Kumar Swetank, Respondent : M/s Agrani Real Services Pvt.Ltd.1
07 Sep 2021Case No. CC/664/2021, Complainant : Vivekanand Arya, Respondent : M/s Agrani Real Services Pvt.Ltd.1
06 Sep 2021Case No. CC/65/2021, Complainant : Anil Kumar, Respondent : M/s Agrani Real Services Pvt.Ltd1
06 Sep 2021Case No. CC/689/2021, Complainant : Sanjay Kumar Verma, Respondent: M/s Agrani Real Services Pvt.Ltd1
06 Sep 2021Case No.CC/854/2019, Complainant : Kumari Prerna, Respondent: M/s Agrani Real Services Pvt.Ltd1
06 Sep 2021Case No. CC/918/2020, Complainant : Dinesh Kumar, Respondent : M/s Agrani Real Services Pvt.Ltd.1
06 Sep 2021Case No. CC/1185/2020, Complainant : Rashmi A Jha, Respondent : M/s Agrani Real Services Pvt.Ltd.1
06 Sep 2021Case No.CC/1186/2020, Complainant : Rupam Kumari, Respondent : M/s Agrani Real Services Pvt.Ltd.1
03 Sep 2021Case No.CC/374/2019, Complainant : Sanjay Kumar, Respondent : M/s A& A Engicon Pvt Ltd & Anr1
02 Sep 2021M/s Agrani Homes Real Construction Pvt.Ltd Project : Angel Phase 2, Vs Authorized Representative of RERA.1
02 Sep 2021M/s Agrani Homes Real Marketing Pvt Ltd Project : Agrani BOB City V/s Authorized Representative of RERA1
02 Sep 2021M/s Agrani Homes Pvt Ltd Project : Agrani C 2 V/s Authorized Representative of RERA.1
02 Sep 2021M/s Agrani Homes Real Marketing Pvt Ltd Project : Agrani PG Town Vs Authorized Representative of RERA1
02 Sep 2021M/s Agrani Homes Real Marketing Pvt Ltd Project : Agrani Prakriti Vihar Vs Authorized Representative of RERA1
02 Sep 2021M/s Agrani Homes Pvt. Ltd Project : Sunrise City Vs Authorized Representative of RERA1
02 Sep 2021M/s Asha Homes Infra Pvt Ltd Project : Sahay Complex Vs Authorized Representative of RERA1
02 Sep 2021M/s Balaji Dream Homes Pvt Ltd Project : Dream Homes Vs Authorized Representative of RERA1
02 Sep 2021M/s Emarat Construction & Developers Project : Emarat Enclave Vs Authorized Representative of RERA1
02 Sep 2021M/s Goal Infratech Pvt Ltd Project : Indraprashtha City Vs Authorized Representative of RERA1
02 Sep 2021M/s Highway and Hydel Projects Pvt Ltd Project: Emerald Forest Tower Vs Authorized Representative of RERA1
02 Sep 2021M/s Om Sai Construction Pvt Ltd Project: Urmila Tower Vs Authorized Representative of RERA1
02 Sep 2021M/s Sai Shrinkhala Developers Pvt. Ltd Project: Subh Sai Sidheshwar Dham Vs Authorized Representative of RERA1
02 Sep 2021M/s Satya Sai Homes Project: Yash Home Vs Authorized Representative of RERA1
02 Sep 2021M/s Skipper Vincom Pvt Ltd Project: Anchal Enclave Vs Authorized Representative of RERA1
02 Sep 2021M/s Viable Infra Project Pvt Ltd Project: VIP Madhuvan Vs Authorized Representative of RERA1
02 Sep 2021M/s Agrani Homes Pvt Ltd Project: IOB (K & L) Vs Authorized Representative of RERA1
31 Aug 2021Case No.CC/580/2019 , Complainant : Syed Asif Iqbal, Respondent : M/s Jan Ekta Construction and Services India Pvt Ltd1
31 Aug 2021Case No.CC/375,2019 , Complainant : Sanjay Kumar, Respondent : M/s Jascon Interbuild Ltd & Anr1
31 Aug 2021Case No.CC/274/2019 , Complainant : Murli Prasad Mandal, Respondent : M/s Sheba Welcon Builders Pvt Ltd.1
31 Aug 2021Case No.RERA/SM/461/2020 , Complainant : Authorised Representative (AR), Real Estate Regulatory Authority (RERA), Bihar, Respondent : M/s Palviraj Constructions Pvt Ltd.1
31 Aug 2021Case No.CC/326/2019, Complainant : Shamimul Haque, Respondent : M/s Ramadan Construction Pvt. Ltd.1
31 Aug 2021Case No. CC/1077/2020, Complainant : Shyam Bihari Singh, Respondent : M/s Agrani Homes Pvt. Ltd1
31 Aug 2021Case No. CC/730/2019, Complainant : Neelam Pathak, Respondent : M/s Agrani Homes Pvt.Ltd1
31 Aug 2021Case No. CC/30/2021, Complainant : Santosh Kumar, Respondent : M/s Agrani Homes Pvt.Ltd1
31 Aug 2021Case No. CC/166/2021, Complainant : Preeti Verma, Respondent : M/s Agrani Homes Pvt.Ltd.1
31 Aug 2021Case No. CC/377/2021, Complainant : Sugandha Jha, Respondent : M/s Agrani Homes Pvt.Ltd.1
31 Aug 2021Case No. CC/613/2019, Complainant : Bhola Nath Singh, Respondent : M/s Agrani Homes Pvt.Ltd.1
31 Aug 2021Case No. CC/691/2019, Complainant : Kunal Kumar, Respondent : M/s Agrani Homes Pvt.Ltd.1
31 Aug 2021Case No. CC/751/2019, Complainant : Ravi Kant Das, Respondent : M/s Agrani Homes Pvt.Ltd1
31 Aug 2021Case No. CC/863/2020, Complainant : Anita Devi, Respondent : M/s Agrani Homes Pvt.Ltd.1
31 Aug 2021Case No. CC/1762/2020, Complainant : Madhuri Kumari, Respondent : M/s Agrani Homes Pvt.Ltd.1
31 Aug 2021Case No. CC/909/2020, Complainant : Nagendra Kumar, Respondent : M/s Agrani Homes Pvt.Ltd.1
31 Aug 2021Case No. CC/713/2019, Complainant : Dolly Singh, Respondent : M/s Agrani Homes Pvt.Ltd1
31 Aug 2021Case No. CC/731/2019, Complainant : Sumit Ghosh, Respondent : M/s Agrani Homes Pvt.Ltd.1
31 Aug 2021Case No. CC/794/2019, Complainant : Rakesh Kumar, Respondent : M/s Agrani Homes Pvt.Ltd.1
31 Aug 2021Case No. CC/914/2019, Complainant :Mohammed Shazed, Respondent : M/s Agrani Homes Pvt.Ltd.1
31 Aug 2021Case No. CC/1068/2020, Complainant : Md Sawood Alam, Respondent : M/s Agrani Homes Pvt.Ltd.1
31 Aug 2021Case No. CC/1069/2020, Complainant : Md Irshad Ahmed Siddiqui, Respondent : M/s Agrani Homes Pvt.Ltd.1
31 Aug 2021Case No. CC/1070/2020, Complainant : Shyam Bihari Singh, Respondent : M/s Agrani Homes Pvt.Ltd1
31 Aug 2021Case No. CC/1141/2020, Complainant : Anita Kumari Verma, Respondent : M/s Agrani Homes Pvt.Ltd1
31 Aug 2021Case No. CC/1395/2020, Complainant : Rakesh Kumar, Respondent : M/s Agrani Homes Pvt.Ltd.1
25 Aug 2021M/s Agrani Homes Real Marketing Pvt.Ltd Project : Daffodils City, Vs Authorized Representative of RERA.1
25 Aug 2021M/s Agrani Homes Pvt.Ltd Project : Galaxy (C & D), Vs Authorized Representative of RERA.1
25 Aug 2021M/s Agrani Homes Real Marketing Pvt.Ltd Project : Highway City, Vs Authorized Representative of RERA.1
25 Aug 2021M/s Agrani Homes Pvt.Ltd Project : IOB (M to Q), Vs Authorized Representative of RERA.1
25 Aug 2021M/s Agrani Homes Pvt.Ltd Project : PG1, Vs Authorized Representative of RERA.1
25 Aug 2021M/s Agrani Homes Pvt.Ltd Project : PG2, Vs Authorized Representative of RERA.1
25 Aug 2021M/s Agrani Homes Pvt.Ltd Project : IOB (R to U), Vs Authorized Representative of RERA.1
25 Aug 2021M/s Agrani Homes Pvt.Ltd Project : Shiv Dhyan, Vs Authorized Representative of RERA.1
24 Aug 2021M/s Palviraj Construction Pvt. Ltd Project : Mumbai Residency, Vs Authorized Representative of RERA.1
24 Aug 2021M/s Palviraj Construction Pvt. Ltd Project : Bollywood Residency, Vs Authorized Representative of RERA.1
24 Aug 2021M/s Palviraj Construction Pvt. Ltd Project : Goa City , Vs Authorized Representative of RERA.1
13 Aug 2021Case No. CC/239/2019; CC/240/2019; CC/241/2019; CC/242/2019; CC/243/2019; CC/244/2019; CC/245/2019; CC/246/2019; CC/248/2019; CC/249/2019; CC/250/2019; CC/431/2019; CC/432/2019; CC/978/2020; CC/980/2020; CC/302/2021, Complainants : Nilam Thakur/ Ramesh Chandra Das/ Mr. Anugarh Jha/ Meena Jha/ Lalendra Thakur/ Santosh Kumar/ Kunal Kishore/ Dinesh Chandra Das/ Punam Kumari/ Ashish Kumar/ Manish Kumar/ Nirmala Singh/ Narendra Bahadur Singh/ Sudhir Kumar Sharma/ Kiran Sharma/ Sujata Kumari, Respondent : M/s Aryavart Lifespaces Pvt. Ltd16
10 Aug 2021Case No.-CC Nos. CC/121/2021, CC/344/2020, CC/436/2021 & CC/489/2021, Complainants : Nita Kumari/Deepa Jaiswal/Sabita Sharma/Soma Sinha, Respondent : M/s Grih Vatika Homes Pvt Ltd4
10 Aug 2021Case No.-CC Nos. CC/1375/2020, Complainants : Retendra Kumar Sinha, Respondent : M/s Grih Vatika Homes Pvt Ltd.1
10 Aug 2021Case No.-CC/1317/2020, Complainants : Tarique Jamil, Respondent : M/s Grih Vatika Homes Pvt Ltd.1
10 Aug 2021Case No.-CC/849/2019, Complainants : Navnit Kumar, Respondent : M/s Grih Vatika Homes Pvt Ltd.1
10 Aug 2021Case No.-CC/706/2019, Complainants : Rachna Dwivedi, Respondent : M/s Grih Vatika Homes Pvt Ltd.1
28 Jul 2021Case No.CC/144/2019 & CC/173/2019, Complainants : Amit Kumar & Rina Roy, Respondent : M/s Ezzion Construction Pvt Ltd.2
28 Jul 2021Case No.CC/385/2019 & CC/386/2019, Complainants : Kiran Kumari & Rinki Kumari, Respondent : M/s Patligram Builders Pvt Ltd.2
16 Jul 2021Case No.CC/1432/2020, Complainant : Aditya Kumar, Respondent : M/s Design Lok Developers Pvt Ltd1
13 Jul 2021Case No -1143, Complainant : Uday Kumar, Respondent : M/s Majestic Construction & Developer Pvt. Ltd 1
13 Jul 2021Case No -1364, Complainant : Devendra kumar Singh, Respondent : M/s Tribhuwan Developers & Construction Pvt. Ltd.1
18 Jun 2021Case No.- CC/203/2019, CC/1010/2020, CC/1011/2020, CC/264/2019, CC/279/2019, CC/372/2019, CC/807/2019, CC/812/2019, CC/844/2019, CC/967/2020, CC/1003/2020, CC/1624/2020, Complainant : Bam Shankar Chaudhary/Koushlendra Kumar/Ran Avay Kumar/Sudhir Kumar Singh/Babita Devi/Kumari Anjana/Dineshwar Dubey/Dhananjay Kumar Singh/Anand Kumar Gupta/ Subodh Kumar/Anuj Kumar Sinha/Rekha , Respondent : M/s Agrani Homes Pvt Ltd12
14 Jun 2021Case Nos. CC/1609/2020, CC/1610/2020, CC/1611/2020, CC/1612/2020,CC/1623/2020, Complainants : Karuna Kumari Alias Karuna Kumari Roy/ Lakshman Singh/ Rahul Jawahar/ Ranjana Sharma/ Ashok Kumar Singh, Respondent : M/s DDL Infratech Pvt. Ltd5
29 Apr 2021Case No.CC/101/2018, Complainant : Sudhir Kumar Dubey, Respondent : M/s Sambhavi Buildcon Pvt Ltd.1
29 Apr 2021Case No.CC/380/2019, Complainant : Samod Pandit, Respondent : M/s Sai Sampann Infra LLP.1
29 Apr 2021Case No.CC/141/2018, Complainant : Om Prakash & Others, Respondent : M/s Meridian Construction Pvt Ltd & Others.1
29 Apr 2021Case No.CC/66/2018 & CC/67/2018, Complainants : Shashi Nandan Prasad/Chandra Shekhar, Respondent : M/s Bhootesh Construction Pvt Ltd.2
26 Apr 2021Case No.: CC/1220/2020, Complainant : Raj kumar Das, Respondent : M/s Grih Vatika Home Pvt. Ltd.1
26 Apr 2021Case No.: CC/1176/2019, Complainant : Nikhil Kumar, Respondent : M/s Palvi Raj Constructions Pvt Ltd1
26 Apr 2021Case No.CC/95/2018, Complainant : Mahesh Bahroos, Respondent : M/s Nesh India Infrastructure Pvt Ltd.1
26 Apr 2021Case No.: CC/220/2019, Complainant : Abhisekh Kumar, Respondent : M/s Grih Vatika Home Pvt. Ltd.1
26 Apr 2021Case No.: CC/1618/2020, Complainant : Mr Nagendra Rai, Respondent : M/s Aarini Developers Pvt Ltd1
19 Apr 2021Case No.CC/984/2020, Complainant : Md Ehsanul Haque, Respondent : M/s Star India Construction Pvt Ltd.1
19 Apr 2021Case No.CC/822/2019, Complainant : Sanjay Kumar, Respondent : M/s Star India Construction Pvt Ltd.1
19 Apr 2021Case No.CC/228/2019, Complainant : Ranjeet Kumar Pandit, Respondent : M/s Geetanjali Vatika Pvt. Ltd.1
19 Apr 2021Case No.CC/741/2019, Complainant : Sushil Kumar Rai, Respondent : M/s Grih Aarambh Developers Pvt Ltd1
19 Apr 2021Case No.CC/518/2019, Complainant : Manju Devi, Respondent : M/s Grih Aarambh Developers Pvt Ltd.1
19 Apr 2021Case No.CC/227/2019, Complainant : Smt Shruti Katyayan & Sanat Kumar Pathak, Respondent : M/s Geetanjali Vatika Pvt. Ltd.1
16 Apr 2021Case No: CC/795/2020, Complainant : Baptist Union Church, Respondent : M/s Utkarsh Sfatik Limited.1
22 Jan 2021Case No. RERA/433/2019 , Complainant : Smt. Pramila Devi , Respondent : M/s Rukmini Infratech India Pvt Ltd.1
04 Jan 2021Case No.: CC/44/2018; CC/45/2018, Complainants : Sudha Sinha/ Anamika Singh, Respondent : M/s Amina Construction Pvt. Ltd2
04 Jan 2021Case Nos.CC/107/2018 , Complainants : Narendra Prasad Gupta, Respondent : M/s Bihar Homes Developers & Builders.1
04 Jan 2021Case Nos.SM/330/2018 , ..............................................Respondent : Mr Mrinal Singh for Late Shailendra Kr Singh/ M/s UNO Digital Pvt Ltd 1
04 Jan 2021Case No.: CC/63/2018 , Complainant : Shri Upendra Nath Singh, Respondent : M/s R.D. Eco Developers Pvt. Ltd. & Others. 1
04 Jan 2021Case No- CC/504/2019, Complainant : Md. Tohid Naiyar , Respondent : M/s Technoculture Building Centre Pvt. Ltd.1
04 Jan 2021Case No- CC/394/2019, Complainant : Smt. SubhraJyoti , Respondent : M/s Sri Loknath Baba Homes Pvt. Ltd.1
02 Jan 2021Case No-CC/446/2019, Complainants : Kumari Anju, Respondent : M/s Sheetal Engicon Pvt Ltd.1
02 Jan 2021Case Nos.CC/14/2018, Complainants : Kamlesh Kumar, Respondent : M/s Kamini Dreams Pvt Ltd.1
02 Jan 2021Case Nos. CC/85/92/2018, Complainants : Birendra Kumar Singh and Archana Singh , Respondent : M/s Maurya Infratel Pvt Ltd .2
02 Jan 2021Case No. CC/234/2018, Complainants : Arun Kumar Lall and Sheela Kanchan , Respondent : M/s Patligram Builders Pvt Ltd.1
02 Jan 2021Case Nos. CC/303/2019, Complainants : Shakuntala Devi , Respondent : M/s Phenomenal Projects Pvt Ltd1
02 Jan 2021Case Nos. CC/150/2018, Complainants : Utpal Kumar Mukharjee, Respondent : M/s Gayatri Homes India Ltd.1
01 Jan 2021Case No.: CC/625/2019, CC/626/2019, CC/627/2019, CC/628/2019, CC/629/2019, CC/630/2019, CC/631/2019, CC/632/2019, CC/633/2019, CC/634/2019, CC/635/2019, CC/636/2019, CC/637/2019, CC/638/2019. Complainants :Mr Sandeep Kumar, Mr Anil Kumar Poddar, Mrs Zubaida Khatoon, Mrs Laxmi Devi, Mr Randhir Singh, Mr Manoj Kumar, Mr Naresh Kumar Nawin, Mr Gokhala Prasad, Mr Akhileshwar Singh, Mr Navin Chandra Sarkar, Mr. Hemendra Kumar, Mr Surendra Prasad, Mrs Urmila Kumari Singh & Mrs Shakuntala Sinha, Respondents : M/s. RSR Mansha Projects Pvt.14
31 Dec 2020Case No. SM/227/2018, ...................................................................Respondent : M/s Virat Homes Infra Pvt Ltd.1
31 Dec 2020Case No. SM/346/2019, ...................................................................Respondent : M/s White Tiger Houses Pvt Ltd1
31 Dec 2020Case No- CC/80/2018, Complainants : Umesh Prasad Gupta and others , Respondent : M/s Blue Heaven Agro-Industries Pvt Ltd.1
31 Dec 2020Case Nos. CC/298 & 299/2019, Complainants : Smt Kanta Singh And Smt Lalmuni Devi , Respondent : M/s Samrat City Infra Developers Pvt. Ltd2
31 Dec 2020Case Nos. CC/117/211 of 2018, Complainants :Jai Prakash Kumar and Surendra Prasad , Respondent : DPM Realtors & Marketing Pvt Ltd.2
30 Dec 2020Case Nos. SM/283/2018, Complainant : Authorised Representative of RERA, Respondent : M/s Balaji Tirupati Homes Pvt Ltd1
30 Dec 2020Case Nos.CC/219/2019 , Complainant : Kumkum Singh, Respondent : M/s Deonandan Construction Pvt Ltd.1
30 Dec 2020Case Nos. CC/290/308/322/605 of 2018/2019 , Complainant : Ragini Ranjan, Shruti, SunitaKumari & Anand Mohan And Ritwik Prasanna , Respondent : M/s Realize Realcon Pvt. Ltd. And Others.4
30 Dec 2020Case Nos. Case Nos.CC/128/2018 , Complainant : Shabbir Ahmad, Respondent : M/s Saeban Constructions Pvt Ltd.1
30 Dec 2020Case No.: CC/415/2019, Case No.: CC/851/2019, Complainant : Dr. Madhulika Nand Keolyor, Mr. Nitin Kumar, Respondent : M/S Subh Saurya Infrastructure Pvt. Ltd.2
30 Dec 2020Case No.: CC/415/2019,CC/851/2019, Complainants :Dr. Madhulika Nand Keolyor,Mr. Nitin Kumar, Respondents : M/S Subh Saurya Infrastructure Pvt. Ltd, Dr. Madhulika Nand Keolyor & other.2
30 Dec 2020Case No.CC/562/2019, Complainant : Deepak Kumar Saraf, Respondent : M/s Technoculture Building Pvt. Ltd.1
28 Dec 2020Case No.: CC/397/2019, Complainant : Dr. Pankaj Kumar, Respondents : M/s Vasundhara Homes Pvt.Ltd1
28 Dec 2020Case No.: CC/814/2019, Case No.: CC/607/2018, Complainant : Prashant Chandra Sinha, Mr. Ashok Kumar Singh, Respondents : M/S Ashwani Enterprises Pvt. Ltd.2
24 Dec 2020Complaint Case No. RERA/282/2019, Complainant : Smt. Kanchan Mishra, Respondent : M/s Technoculture Building Centre Pvt Ltd1
24 Dec 2020Complaint Case No. RERA/281/2019, Complainant : Shambhu Prasad Jaiswal, Respondent : M/s Star India Construction Pvt 1
23 Dec 2020Case No.CC/480/2019, CC/481/2019. Complainants : Dr. Manoj Kumar/ Dr. Reena Ranjan, Respondents : M/s Unibera Construction Ltd.2
23 Dec 2020Case No. CC/612/2019. Complainants :Mr. Pankaj Kumar Singh, Respondents : M/s Anu Anand Construction Pvt. Ltd.1
23 Dec 2020Case No.CC/408/2019, Complainant : Sima Chaudhary, Respondent : M/s Raj Construction Pvt. Ltd1
10 Dec 2020Case No.CC/608/2019, Complainant : Ravi Ranjan Prasad, Respondent : M/s Technoculture Building Pvt. Ltd1
10 Dec 2020Case No.CC/521/2019, Complainants : Mr. Lal Babu Singh and others, Respondents : M/s Agrani Homes Real Services Pvt Ltd & Ors1
04 Dec 2020Case No.CC/444/2019, Complainant : Brajesh Prasad, Respondent : M/s Super Builders Pvt. Ltd.1
24 Nov 2020Case No.CC/452/2019, Complainant : Prashant, Respondent : M/s Technoculture Building Pvt. Ltd1
11 Nov 2020Case Nos.CC/404/2018, Complainant : Ms Veena Vadini, Respondent : M/s Grih Vatika Homes Pvt Ltd1
05 Nov 2020Case No.CC/568/2019, Complainant : Mr. Sita Ram Saha, Respondent : M/s Tricolor Properties Pvt. Ltd.1
21 Oct 2020Case No. CC/569/2019, Complainant : Mr. Ajay Kumar, Respondent : M/s Anu Anand Construction Pvt. Ltd.1
13 Oct 2020RERA Case Nos.CC/206/2019 , Complainant : Yadunandan Prasad Singh, Respondent : M/s Adharshila Housing Buildcon Pvt Ltd.1
09 Oct 2020Case No.CC/277/2018, Complainant : Nimesh Anand, Respondent : M/s Sai Doma Buildcon Pvt.1
09 Oct 2020Case No.: CC/210/2019, CC/223/2019, Complainant : Mr. Anil Kumar/Smt. Leela Devi, Respondent : M/s Lakhan Homes Ltd.2
09 Oct 2020Case Nos.CC/05/2018, Complainant : Atma Nand Jha, Respondents : M/s Pahi Constructions Pvt Ltd & others1
09 Oct 2020Case No.CC/430/2019, Complainant : Gagan Bhushan Kumar Sinha, Respondent : M/s Kampilya Builders Pvt. Ltd1
28 Sep 2020Case No.CC/389/2019, Complainant : Radha Rani Singh, Respondent : M/s Mundeshwari Multicon Pvt Ltd.1
05 Mar 2020Case Nos.CC/36/37/38/42/93/2018, Complainant : Mukesh Kumar Sunny, Sheela Devi, Manish Prakash, Suman Chaturvedi, Sandeep Parashar Respondent : S D Construction & Developers 5
05 Mar 2020Case Nos.CC/145/2018, Complainant : Ranjit Singh, Respondent : Balaji Nexgen Homes Pvt Ltd.1
28 Feb 2020Case Nos. CC/454/2019, Complainant : Mrs Reeta Kumari Nayak, Respondent : Budha Developers1
05 Feb 2020Case Nos.SM/407/2018, Dhruv Iconic Pvt Ltd…………….…Respondent1
29 Jan 2020Case Nos.CC/96/2018, Complainant : Renu Sharma, Respondent : Agrani Homes Pvt Ltd. 1
29 Jan 2020Case No-CC/232/2019, Complainant : Prem Nath Sajjan, Respondent : Griham Developers Pvt. Ltd.1
20 Jan 2020RERA Case No : CC/102/2018 , CC/105/2018 , CC/106/2018 ,CC/114/2018 , CC/125/2018 , CC/152/2018 ,CC/222/2018 , Complainant : Shambhavi Sandilya, Rakesh Kumar David,Rashmi Singh, Renu Singh,Deepak Kumar and others, Sidhartha Singh, Sarla Devi, Respondent : M/s Ukarsh Infra Construction Pvt Ltd7
20 Jan 2020Case No: CC/178/2018, Complainant : Subodh Jaiswal, Respondent : Realise Realcon Pvt Ltd,1
28 Dec 2019Case Nos.CC/151/2018 , Complainant : Subhash Chandra, Respondent : DPM Infrastructure & Housing Pvt Ltd1
28 Dec 2019Case No. SM/298/2018 , Neelgeet Constructions Pvt Ltd ………………Respondent1
28 Dec 2019 Case Nos. SM/212/2018 , Abu Construction Pvt Ltd……………..…Respondent 1
20 Dec 2019Case Nos.CC/120/2018, Complainant : Shaila Agrawal, Respondent : Nissa Realtors Pvt Ltd1
01 Nov 2019Case Nos. SM/382/2019, Star India Constructios Pvt Ltd……….…........Respondent1
01 Nov 2019Case Nos. SM/301/2019, Sidhanta Estates Pvt Ltd……………...Respondent1
31 Oct 2019Case Nos.CC/204/2019, Complainant : Jaya Srivastava, Respondent : Agrani Homes Pvt Ltd 1
31 Oct 2019Case No : CC/142/2018, Complainant : Chunni Sharma, Respondent : Aranya Plotters & Builders Pvt Ltd 1
22 Oct 2019Case Nos.CC/98/2018, Complainant : Smt Sushma Devi, Respondent : Grih Vatika Pvt Ltd1
22 Oct 2019Case Nos.CC/121/2018, Complainant : Smt Umda Devi, Respondent : Creastate Infrastructure Pvt Ltd1
31 Aug 2019Case Nos.CC/155/2018 & CC/156/2018, Complainants : Rajesh Kumar & Mr Satya Prakash, Respondent : Rukmani Infratech India Pvt Ltd2
31 Aug 2019Case Nos.SM/300/2018, Honest Builders & Developers Pvt Ltd…………Respondent1
09 Aug 2019Case Nos. CC/81/2018, CC/82/2018 & CC/83/2018, Complainants : Ms Savita Sah, Mr Sitaram Singh & Mr Navin Kumar, Respondent : Nesh India Infrasture Pvt Ltd 3
08 Aug 2019Case No: RERA/CC/51/52/57/2018, Complainants : Mr Raj Kumar Sinha, Mr Sanjay Kumar Sinha, and Mr Binod Kumar, Respondent : Nesh India Infrastructure Pvt. Ltd3
11 Jul 2019Case Nos.CC/18/2018, Complainant: Mr Satish Kumar Verma, Respondent : M/s Prasambi Design & Construction Pvt1
11 Jul 2019Case No. RERA/SM/352/2018-19, M/s Redbrick Infrabuild Pvt. Ltd. …..………..…Respondent1
10 Jul 2019Case no- RERA/SM/350/ 2019, M/s Lavanya Estates Pvt Ltd………………….Respondent1
10 Jul 2019Case Nos.CC/56/2018, Complainants : Mrs Shanti Devi and Kumari Sheela, Respondent : M/s Sri Krishna Constructions1
09 Jul 2019Case Nos. SM/280/2019, M/s Swapn Ashiana Home Developers Pvt Ltd……….Respondent1
09 Jul 2019Case Nos. SM/144/2019, SM/145/2019 & SM/146/2019 , M/s Shree Om Sai Group………..;……….Respondent3
09 Jul 2019Case Nos. SM/363/2018, M/s Wings Educare /Waman Ina Enterprises Pvt Ltd…...Respondent1
08 Jul 2019Case Nos. SM/238//2018, M/s Phenomenal Projects (P) Ltd …………….…Respondent 1
08 Jul 2019Case Nos. SM/268//2019, M/s Muskan Construction Pvt Ltd……….Respondent1
08 Jul 2019Case Nos. SM/328/2019, M/s Goal Infratech Pvt Ltd…………………….Respondent1
08 Jul 2019Case Nos. SM/297/2019, M/s Sidhanta Estates Pvt Ltd……………...Respondent1
08 Jul 2019Case Nos. SM/187/2019, M/s Bhawani Infracon Pvt Ltd………………………Respondent1
04 Jul 2019Case Nos. SM/349//2019, M/s Gardenia Newtech Developers Ltd……………………………..Respondent1
04 Jul 2019Case Nos. SM/372/2019, M/s Shivam Construction Pvt Ltd…………………….Respondent1
04 Jul 2019Case Nos. SM/220/2018, M/s Sri Anu Anand Construction Pvt Ltd..………………………..Respondent1
04 Jul 2019Case No. RERA/136/2018, Complainant: Mrs. Anju Agarwal , Respondent : M/s Agrani Homes Pvt Ltd1
04 Jul 2019Case Nos.CC/119/2018, Complainant: Mrs Ishrat Parween , Respondent : M/s Kamini Home1
04 Jul 2019Case Nos. CC/04/2018, Complainant: Anil Kumar Pandey , Respondent : M/s Pahi Constructions Pvt Ltd1
04 Jul 2019Case Nos. CC/165//2018, Complainant: Amarjeet Kumar, Respondent :M/s Agrani Homes Real Services Pvt 1
03 Jul 2019Case No. CC/35/2018, CC/49/2018 & CC/54/2018, Complainants : Mr. Tribhuwan Kumar Chaudhary, Mr. Satyendra Nath,Dwivedi & Mrs. Nisha Jha, Respondents : M/s Sarvodaya Marketing Pvt. Ltd.3
30 May 2019Case No RERA/CC/48/2018 Dated on 30-5-2019, Complainant: Mrs Amrita Verma, Respondent, Director Mr Shiv Kumar, Present: For the Complainant - Mr Niranjan Kumar, Husband, For the Respondent - Mr. Shashi Kumar, Manager 1
30 May 2019Case No- RERA/SM/47/ 2018 Dated on 30-5-2019, Complainant: Authorised Representative of RERA, Respondent, M/s Aryavart Lifespaces Pvt Ltd1
30 May 2019Case No. RERA/86/2018 Dated on 30-5-2019, Complainant: Kumari Meenakshi, Respondent, M/s Grih Vatika Homes Pvt. Ltd 1
30 May 2019Case No. RERA/SM/100/2018 Dated on 30-05-2019, Complainant: Authorised Representative of RERA, Respondent: M/s Patligram Builders Private Limited1
30 May 2019Case Nos.CC/39/2018 Dated on 30-5-2019, Complainant: Mrs Chandra Prabha Lal, Respondent, M/s Hem Developers Pvt Ltd 1
09 May 2019Case No. SM/279/2018 Dated on 09-05-2019, Complainant: Authorised Representative of RERA, Respondent, M/s Bricks Estate Private Limited1
08 May 2019Case No. RERA/SM/314/2018 Dated on 08-05-2019, Complainant: Authorised Representative of RERA, Respondent, M/s Saeban Constructions Pvt Ltd1
05 May 2019RERA Case No. CC/61/2018, .Complainants: Mrs Navita Kumari, Respondent, M/s Agrani Homes Pvt Ltd1
03 May 2019RERA Case No. SM/320/2018 Dated on 03-05-2019, Complainant: Authorised Representative of RERA, Respondent, M/s Star India Construction Pvt Ltd 1
09 Apr 2019Case No. CC/126/2018 Dated on 09-04-2019L, Complainant: Mrs Nilu Kumari, Respondent, M/s Agrani Homes Pvt Ltd1
09 Apr 2019Case No. SM/319/2018 Dated on 09-04-2019, .Complainant: Authorised Representative of RERA, Respondent, M/s Shrawani Engincon Pvt Ltd 1
09 Apr 2019Case No. CC/113/2018 Dated on 09-04-2019, Complainant: Mr Rajeev Kr Pandey, Respondent, M/s Agrani Homes Real Construction PvtLtd1
09 Apr 2019Case No. CC/137/2018 Dated on 09-04-2019, Complainant: Mrs Chhaya Rani, Respondent, M/s Agrani Homes Real Constructions Pvt Ltd1
02 Apr 2019Case No. CC/131/2018 Dated on 02-04-2019, Complainant: R.K. Mishra & Loveleen Mishra, Respondent, M/s Apna Awas Construction Pvt. Ltd1
02 Apr 2019Case No. CC/47/2018 Dated on 02-04-2019, Complainant: Hena Raj, Respondent, Emarat Construction and Developers1
01 Apr 2019Case No. RERA/09/2018 Dated on 01-04-2019, Complainant: Mr Vijay Kumar Sharma, Respondent, M/s Kanishka Buildcon Pvt Ltd 1
01 Apr 2019Case No-CC/26/2018 Dated on 01-04-2019, Complainant: Smt Ruby Respondent, M/s Bhawani Infracon Pvt Ltd1
01 Apr 2019Case No: SM/59/2018, SM/285-287/2018 Dated on 01-04-2019, Complainant: Bihar, Respondent, M/s Shital Buildtech Private Limited2
27 Mar 2019Case No. CC/05/2018 Dated on 27-03-2019, Complainant: Atmanand Jha , Respondent, M/s Pahi Constructions Pvt. Ltd1
27 Feb 2019Case No. RERA/CC/40/2018 Dated on 27-02-2019, Complainant: Smt Pratibha Pandey, Respondent, M/s Goal Infratech Pvt. Ltd1
27 Feb 2019Case No. SM/392/2018 & SM/393/2018 Dated on 27-02-2019, Complainant: Authorised Representative, RERA, Respondent, M/s Sehra Real Estate Developers Private Limited2
27 Feb 2019Case No. SM/36/2018 Dated on 27-02-2019, Complainant: Authorised Representative of RERA, Respondent, M/s R.R. Builders & Developers 1
27 Feb 2019Case No. -CC/94/2018 Dated on 27-02-2019, Complainant: Awanish Pandey, Respondent, M/s Agrani Homes Pvt Ltd 1
21 Feb 2019Case No. CC/97/2018 Dated on 21-02-2019, Complainant: Mr Dinesh Pandey, Respondent, M/s Agrani Homes Pvt Ltd1
11 Feb 2019Case NoCC/43/2018 Dated on 11-02-2019, Complainant: Mrs Zeenat Ara, Respondent, M/s Agrani Homes Pvt Ltd1
11 Feb 2019Case No. RERA/123/2018 Dated on 11-02-2019, Complainant: Ms Shweta Singh, Respondent, M/s Agrani Homes Pvt Ltd1
11 Feb 2019Case No. RERA/108/2018 Dated on 11-02-2019, Complainant: Mr. Sachindra Mohan, Respondent, M/s Agrani Homes Pvt Ltd1
07 Feb 2019Case No. RERA/88/2018 Dated on 07.02.2019, Complainant: Avinash Kumar, Respondent: M/s Ghar Laxmi Buildcon Pvt Ltd1
07 Feb 2019Case No . SM/392/2018 & SM/393/2018 Dated on 07-02-2019, Complainant: Authorised Representative, RERA, Respondent: M/s Creastate Infrastructure Pvt Ltd1
04 Feb 2019Case No. RERA/78/2018 & 79/2018 Dated on 04.02.2019, Complainant: Mr Shyam Kumar Agrawal, Respondent: Agrani Homes Pvt. Ltd1
31 Jan 2019Case No. RERA/59/2018 Dated on 31-01-2019, Complainant: Mr Manorajan Prasad, Respondent: Agrani Homes Pvt. Ltd1
31 Jan 2019Case No. RERA/55/2018 Dated on 31-01-2019, Complainant: Navin Kumar Jha, Respondent: M/s Sarvodaya Marketing Pvt. Ltd1
30 Jan 2019Case No. RERA/12/2018 Dated on 30-01-2019 , Complainant: Ms Chanchal Wina, Respondent: M/s Technoculture Building Centre Pvt. Ltd1
25 Jan 2019Case No. RERA/SM/153 & 154/2018 Dated on 25.01.2019, Complainant: Authorised Representative, Rera, Respondet: M/s Nisana Infrastructure Pvt. Ltd 2
25 Jan 2019Case No. RERA/CC/17/2018 Dated on 25.01.2019, Complainant: Mr Upendra Kumar Mishra, Respondet: M/s Apna Awas Constrution Pvt. Ltd1
27 Dec 2018Case No.RERA 90/2018 Dated on 27.12.2018, Complainant: Mr. Raj Kumar, Respondent: Agrani Homes Real Marketing Pvt. Ltd1
27 Dec 2018Case No. RERA/NC/183/2018 Dated on 27.12.2018, Complainant: Authorised Representative, Real Estate Regulatory Authority, Bihar, Respondent: Goal Infratech Pvt. Ltd1
19 Dec 2018Case No.RERA/CC/40/2018 Dated on 19.12.2018, Complainant: Smt. Ratna Sinha & Shri Anil Kumar Sinha, Respondent: M/s Agrani Homes Pvt.Ltd1
17 Dec 2018Case No. 390 &; 391 of 2018 Dated on 17.12.2018, Complainant: Authorised Representative, Real Estate Regulatory Authority, Bihar, Respondent: M/s Creastate Infrahomes Pvt.Ltd2
27 Nov 2018Case No.RERA/NC/177/2018 Dated on 27.11.2018, Complainant: Authorised Representative, Real Estate Regulatory Authority, Bihar, Respondent: Shree Lok Nath Baba Homes Pvt. Ltd1
22 Nov 2018Case No. 16 & 33 Dated on 22.11.2018, Complainant: Authorised Representative, Real Estate Regulatory Authority, Bihar, Eastern Estate Construction And Developers Pvt.Ltd2
01 Nov 2018Case No.RERA/27-31 Dated on 01.11.2018, Complainant: Mrs. Anita Devi, W/o Arun Kumar, Complainant: Mrs. Madhu, W/o Sri Sanjay Kumar Prasad, Complainant: Balmukund Prasad, Complainant: Anshu, W/o Sri Pradeep Kumar, Complainant: Mrs Sarita Gupta, Respondent: Agrani Homes Pvt. Ltd1
01 Nov 2018Case No.RERA/CC/23/2018 Dated on 01.11.2018, Complainant: Smt. Nitumani, Respondent: Agrani Homes Real Construction Pvt. Ltd1
01 Nov 2018Case No.RERA/CC/25/2018 Dated on 01.11.2018, Complainant: Smt. Monika Mani, Respondent: M/s Agrani Homes Real Construction Pvt. Ltd, (A Unit of M/s Agrani Homes Pvt.Ltd)1
14 Sep 2018Case No.RERA/CC/07/2018 Dated on 14.09.2018, complainant: Kundan Kumar and Jyoti Kumari, Responden: IWs Nesh rndia rnfrastructure Pvt Ltd1
31 Aug 2018Case No. 06/2018 Dated 3l August 2018.,Complainant: Dr Nawal Prakash Deepak, Respondent: Agrani Homes Real Marketing Pvt Ltd1
Total Ordered by Adjudicating Officer : 313
Date of NoticeDescriptionNo. of orders
06 Jul 2021RERA/CC/1802/2020, RERA/AO/628/2020, Complainant : Smt. Anju Tiwari , Respondents : M/s Agrani Homes Pvt. Ltd.1
05 Jul 2021 RERA/CC/1367/2020, RERA/AO/401/2020 , Complainant : Sri Naresh Kumar Srivastava, Respondents : M/s Grih Vatika Homes Pvt. Ltd.1
02 Jul 2021RERA/CC/1501/2020, RERA/AO/482/2020, Complainant : Sri Navin Kumar, Respondent : M/s Sudha Engicon Pvt. Ltd.1
02 Jul 2021RERA/CC/1042/2020, RERA/AO/302/2020 , Complainant : Sri Umesh Chandra Jha, Respondents : M/s Agrani Homes Pvt. Ltd.1
30 Jun 2021RERA/CC/623/2019,RERA/AO/164/2019, Complainant : Smt. Mamta Kumari, Respondents : M/s Jascon Enterbuild Ltd.1
25 Jun 2021RERA/CC/348/2019, RERA/AO/69/2019, Complaints : Sri Rajesh Kumar Jha, Respondent : M/s Agrani Homes Real Marketing Pvt. Ltd. 1
23 Jun 2021RERA/CC/1803/2020, RERA/AO/629/2020, Complaints : Sri Vikash Kumar Singh / Sri Sunil Kumar Singh, Respondent : M/s Agrani Homes Pvt. Ltd.1
22 Jun 2021RERA/CC/1341/2020, RERA/AO/389/2020, Complaints : Smt. Leela Singh, Respondent : M/s Kazari Infratech Pvt. Ltd.1
18 Jun 2021RERA/CC/585/2019, RERA/AO/150/2019,Complainants : Sri Ram Kumar Singh, Respondent : M/s Jascon Enterbuild Ltd.1
18 Jun 2021RERA/CC/534/2019, RERA/AO/128/2019, Complaints : Smt. Radhika Kedia, Respondent : M/s Sai Shree Balajee Construction and Developers Pvt. Ltd.1
14 Jun 2021Case No. RERA/CC/1379/2020,RERA/AO/405/2020,RERA/CC/1380/2020,RERA/AO/406/2020,RERA/CC/1381/2020, RERA/AO/407/2020,RERA/CC/1408/2020,RERA/AO/420/2020,RERA/CC/1409/2020,RERA/AO/421/2020, Complainants : Smt. Shweta Singh, Sri Amresh Kumar, Smt. Ankita Singh, Sri Nagendra Singh, Smt. Kanchan Singh, Respondent : M/s Agrani Homes Real Marketing Pvt. Ltd.5
11 Jun 2021Exe. Case No.94/2020 [Arising out of original Complaint Case No.RERA/CC/318,333 and 334/2019 RERA/AO/56, 62 and 63/2019] , Complainants : Sri, Ram Kumar Sharma and Sri Nishant Kumar Singh, Respondents : M/s Bharti Project Media and Infratech Pvt. Ltd.1
10 Jun 2021RERA/CC/1797/2020, RERA/AO/626/2020, Complainant : Sri Sardar Manikant, Respondents : M/s S.D. Construction and Developers1
09 Jun 2021RERA/CC/752/2019, RERA/AO/186/2019, Complainant : Sri Ashutosh Kumar, Respondents : M/S Patliputra Builders Pvt. Ltd. 1
08 Jun 2021RERA/CC/1282/2020, RERA/AO/364/2020, Complainant : Sri Jitendra Kumar Singh, Respondents : M/S Simhastha Construction Pvt. Ltd. 1
04 Jun 2021RERA/CC/1043/2020, RERA/AO/303/2020, Complainant : Sri Gopal Kumar Parit, Respondents : M/S Agrani Homes Real Services Pvt. Ltd., 1
06 Apr 2021RERA/CC/755/2019, RERA/AO/443/2020, Complainant : Smt. Minakshi Mehta, Respondents : M/s Ghar Lakshmi Buildcon Pvt. Ltd. 1
15 Mar 2021(1) RERA/CC/868/AO/244/2020, (2) RERA/CC/869/AO/245/2020, (3) RERA/CC/870/AO/246/2020, (4) RERA/CC/871/AO/247/2020, (5) RERA/CC/872/AO/248/2020, (6) RERA/CC/873/AO/249/2020, (7) RERA/CC/874/AO/250/2020, (8) RERA/CC/875/AO/251/2020, (9) RERA/CC/876/AO/252/2020, (10) RERA/CC/877/AO/253/2020, (11) RERA/CC/878/AO/254/2020, (12) RERA/CC/893/AO/255/2020, (13) RERA/CC/894/AO/256/2020, (14) RERA/CC/895/AO/257/2020, (15) RERA/CC/905/AO/261/2020, (16) RERA/CC/948/AO/266/2020, (17) RERA/CC/956/AO/271/2020, (18) RERA/CC/1020/AO/290/2020, (19) RERA/CC/1062/AO/308/2020, (20) RERA/CC/1063/AO/309/2020, (21) RERA/CC/1208/AO/337/2020, (22) RERA/CC/1209/AO/338/2020, (23) RERA/CC/1236/AO/348/2020, (24) RERA/CC/1254/AO/354/2020, (25)RERA/CC/1307/AO/377/2020, (26) RERA/CC/1309/AO/379/2020, (27) RERA/CC/1390/AO/411/2020, (28) RERA/CC/1391/AO/412/2020, (29) RERA/CC/1410/AO/422/2020, (30) RERA/CC/1726/AO/596/2020. Complainants: (1) Sri Alok Kumar Singh, (2) Smt. Kumari Smita, (3) Sri Sudeep Kumar, (4) Sri Chandan Kumar, (5) Sri Dhirendra Kumar, (6) Sri Anurag Kumar, (7) Sri Namit Sharat, (8) Sri Ramit Anand, (9) Sri Dharmendra Kumar, (10) Ms. Anshu Mala, (11) Sri Narendra Kumr, (12) Sri Ranjit Kumar, (13) Ms. Pooja, (14) Sri Pankaj Kumar Choudhary, (15) Sri Durgesh Kumar Jha, (16) Md. Anisur Rahman, (17) Sri Vinay Kumar, (18) Sri Ramnandan Prasad Singh, (19) Smt. Sweta Kumari, (20) Sri Roshan Kumar Yadav, (21) Sri Purushottam Kumar Sinha, (22) Smt. Vinita Kumari Sinha, (23) Sri Kaushlendra Kumar Gupta, (24) Sri Mukesh Kumar, (25) Sri Suman Kumar, (26) Sri Nawal Kishore Prasad, (27) Dr. Tabassum Khan, (28) Sri Intikhab Alam Khan, (29) Sri Krishna Chandra Bahera, (30) Sri Manan Kumar Singh. Respondents: M/s Agrani Homes Pvt. Ltd. 30
15 Mar 2021RERA/CC/1534/2020, RERA/AO/506/2020, Complainant : Smt. Supriya Khemka, Respondents : M/s Super City Builders Pvt. Ltd. 1
09 Mar 2021RERA/CC/753/2019, RERA/AO/233/2019, RERA/CC/754/2019, RERA/AO/234/2019, Complainants : Smt. Savita Sah, Sri Sita Ram Singh, Respondents : M/s Nesh India Infrastructure Pvt. Ltd. 2
03 Mar 2021RERA/CC/1233/2020, RERA/AO/346/2020, Complainant :Sri Manish Kapildeo Singh, Respondents :M/s Agrani Homes Pvt. Ltd1
01 Mar 2021RERA/CC/681/2019, RERA/AO/171/2019, Complainant : Sri Baidya Nath Pathak, Respondents : M/s Grih Vatika Homes Pvt. Ltd.1
26 Feb 2021RERA/CC/1146/2020, RERA/AO/332/2020, Complainant :Smt. Pushpa Sahay, Respondents :M/s Agrani Homes Pvt. Ltd1
26 Feb 2021RERA/CC/488/2019,RERA/AO/312/2019, Complainant : Smt. Punam Kumari, Respondents : M/s DPM Infrastructure & Housing Pvt. Ltd.1
22 Feb 2021RERA/CC/1524/2020,RERA/AO/467/2020,RERA/CC/1525/2020,RERA/AO/468/2020,RERA/CC/1526/2020,RERA/AO/469/2020 , Complainants : Sri Sheel Rajneesh, Dr. Sheil Avneesh, Sri Birendra Thakur, Respondents : M/s Realize Realcon Pvt. Ltd.3
22 Feb 2021RERA/CC/335/2019, RERA/AO/64/2019, Complainant : Sri Sanjay Chaudhary, Respondents : M/s Realize Realcon Pvt. Ltd.1
18 Feb 2021RERA/CC/969/2020, RERA/AO/278/2020, Complainant : Smt. Babita Kumari, Respondents : M/s Agrani Homes Pvt. Ltd.1
12 Feb 2021Case No.- RERA/CC/1388/2020,RERA/AO/410/2020,RERA/CC/1455/2020,RERA/AO/451/2020,RERA/CC/1456/2020, RERA/AO/452/2020,RERA/CC/1457/2020,RERA/AO/453/2020,RERA/CC/1465/2020,RERA/AO/457/2020,RERA/CC/1466/2020, RERA/AO/458/2020,RERA/CC/1467/2020,RERA/AO/459/2020,RERA/CC/1468/2020,RERA/AO/460/2020,RERA/CC/1469/2020, RERA/AO/461/2020,RERA/CC/1480/2020,RERA/AO/466/2020,RERA/CC/1481/2020,RERA/AO/470/2020,RERA/CC/1482/2020, RERA/AO/471/2020,RERA/CC/1483/2020,RERA/AO/472/2020,RERA/CC/1484/2020,RERA/AO/473/2020,RERA/CC/1491/2020, RERA/AO/475/2020,RERA/CC/1492/2020,RERA/AO/476/2020,RERA/CC/1493/2020,RERA/AO/477/2020,RERA/CC/1494/2020, RERA/AO/478/2020,RERA/CC/1495/2020,RERA/AO/479/2020,RERA/CC/1502/2020,RERA/AO/483/2020,RERA/CC/1503/2020, RERA/AO/484/2020,RERA/CC/1504/2020,RERA/AO/485/2020,RERA/CC/1505/2020,RERA/AO/486/2020,RERA/CC/1506/2020, RERA/AO/487/2020,RERA/CC/1507/2020,RERA/AO/488/2020,RERA/CC/1508/2020,RERA/AO/489/202,RERA/CC/1509/2020, RERA/AO/490/2020,RERA/CC/1510/2020,RERA/AO/491/2020, RERA/CC/1519/2020,RERA/AO/496/2020,RERA/CC/1520/2020,RERA/AO/497/2020,RERA/CC/1521/2020,RERA/AO/498/2020, RERA/CC/1522/2020,RERA/AO/499/2020,RERA/CC/1530/2020,RERA/AO/503/2020,RERA/CC/1531/2020,RERA/AO/504/2020, RERA/CC/1544/2020,RERA/AO/511/2020,RERA/CC/1545/2020,RERA/AO/512/2020,RERA/CC/1546/2020,RERA/AO/513/2020, RERA/CC/1552/2020,RERA/AO/517/2020,RERA/CC/1553/2020,RERA/AO/518/2020,RERA/CC/1572/2020,RERA/AO/527/2020, RERA/CC/1588/2020,RERA/AO/537/2020,RERA/CC/1589/2020,RERA/AO/538/2020,RERA/CC/1590/2020,RERA/AO/539/2020, RERA/CC/1596/2020,RERA/AO/541/2020,RERA/CC/1597/2020,RERA/AO/542/2020,RERA/CC/1614/2020,RERA/AO/546/2020, RERA/CC/1673/2020,RERA/AO/561/2020,RERA/CC/1674/2020,RERA/AO/562/2020,RERA/CC/1683/2020,RERA/AO/564/2020, RERA/CC/1690/2020,RERA/AO/566/2020,RERA/CC/1691/2020,RERA/AO/567/2020,RERA/CC/1716/2020,RERA/AO/586/2020, RERA/CC/1725/2020,RERA/AO/595/2020, Complainants : Sri Manoj Kumar Singh,Sri Madan Kumar Singh, Rajeshwar Kumar Dubey, Sri Prabhat Kumar,Sri Rohit Kumar,Sri Sanjeev Kumar Mishra, Sri Shiv Ganga Prasad Singh, Sri Sudhir Kumar, Sri Sanjay Kumar Singh, Sri Vikas Kumar, Sri Pankaj Kumar, Sri Prakash Chandra Amitabh, Sri Ashok Kumar, Sri Santosh Kumar Babu,Sri Raman Kumar Choudhary, Sri Akhilesh Kumar Thakur, Sri Karmshil Kumar, Sri Mritunjay Singh, Sri Umesh Prasad Sah, Sri Birju Paswan, Hridayanand Prasad Gupta, Sri Sanjay Kumar, Sri Arun Kumar Choudhary, Sri Abhay Kumar Sinha, Sri Nawal Kishor Singh, Sri Anil Kumar Sah, Sri Akhileshwar Kumar, Sri Prabendra Kumar, Sri Devendra Kumar Kamal, Sri Surendra Paswan, Sri Pawan Kumar, Sri Ranjeet Kumr, Sri Vijay Kumar Singh, Sri Prashant Kumar, Sri Avinash Kumar, Sri Shashi Shekhar Prasad Singh, Sri Ashok Kumar Sinha, Sri Manzar Hasan, Sri Ram Brajesh Kumar, Sri Ram Naresh Mahto, Sri Sidheshwar Sharma, Sri Satyanand Prasad Gupta, Sri Raj Kumar, Sri Satya Narayan Das, Sri Lal Baboo Chaudhary, Sri Bishwanath Bhagat,Sri Birendra Kumar Singh, Sri Awinash Kumar, Sri Pankaj Kumar Singh, Sri Ramanand Kumar Ray, Sri Rajesh Kumar Jha, Sri Raj Kumar Gandhi, Sri Raj Kumar Chaudhary, Respondents : M/s Agrani Homes Pvt. Ltd. 53
09 Feb 2021RERA/CC/651/2019, RERA/AO/167/2019, Complainant :Sri Sunil Kumar Sah, Respondents :M/s Ghar Lakshmi Buildcon Pvt Ltd.1
09 Feb 2021RERA/CC/705/2019, RERA/AO/442/2020, Complainant :Smt. Pinky Kumari, Respondents :M/s Ghar Lakshmi Buildcon Pvt. Ltd1
03 Feb 2021RERA/CC/825/2019, RERA/AO/237/2019, Complainant:Sri Manikesh Kumar Sharma, Respondents :M/s Agrani Homes Pvt.1
19 Jan 2021Case No- RERA/CC/1626/2020, RERA/AO/550/2020, Complainant : Sri Ram Lakhan Pandit, Respondents : M/s Nesh India Infrastucture Pvt. Ltd. 1
18 Jan 2021Case No- Case No- RERA/CC/1423/2020, RERA/AO/430/2020, Complainant : Sri Raj Kumar Pandit, Respondents : M/s Technoculture Building Centre Pvt. Ltd.1
13 Jan 2021RERA/CC/743/2019,RERA/AO/179/2019,RERA/CC/744/2019,RERA/AO/180/2019,RERA/CC/745/2019,RERA/AO/181/2019, RERA/CC/746/2019,RERA/AO/182/2019,RERA/CC/747/2019,RERA/AO/183/2019,RERA/CC/748/2019,RERA/AO/184/2019, RERA/CC/749/2019,RERA/AO/185/2019,RERA/CC/764/2019RERA/AO/190/2019,RERA/CC/765/2019,RERA/AO/191/2019, RERA/CC/766/2019,RERA/AO/196/2019,RERA/CC/767/2019,RERA/AO/193/2019,RERA/CC/768/2019,RERA/AO/194/2019, RERA/CC/769/2019,RERA/AO/195/2019,RERA/CC/770/2019,RERA/AO/196/2019,RERA/CC/771/2019,RERA/AO/197/2019, RERA/CC/772/2019,RERA/AO/198/2019,RERA/CC/788/2019,RERA/AO/217/2019,RERA/CC/791/2019,RERA/AO/221/2019, RERA/CC/796/2019,RERA/AO/222/2019,RERA/CC/797/2019,RERA/AO/223/2019,RERA/CC/798/2019,RERA/AO/224/2019, RERA/CC/799/2019,RERA/AO/225/2019,RERA/CC/800/2019,RERA/AO/226/2019,RERA/CC/801/2019,RERA/AO/227/2019, RERA/CC/802/2019,RERA/AO/228/2019,RERA/CC/803/2019,RERA/AO/229/2019,RERA/CC/804/2019,RERA/AO/230/2019, RERA/CC/805/2019,RERA/AO/231/2019,RERA/CC/806/2019,RERA/AO/232/2019,RERA/CC/819/2019,RERA/AO/235/2019, RERA/C/820/2019,RERA/AO/236/2019,RERA/CC/949/2020,RERA/AO/267/2020,RERA/CC/999/2020,RERA/AO/316/2020, RERA/CC/1015/2020,RERA/AO/288/2020,RERA/CC/1019/2020,RERA/AO/289/2020,RERA/CC/1032/2020,RERA/AO/295/2020, RERA/CC/1033/2020,RERA/AO/296/2020,RERA/CC/1034/2020,RERA/AO/297/2020,RERA/CC/1039/2020,RERA/AO/299/2020, RERA/CC/1040/2020,RERA/AO/300/2020,RERA/CC/1041/2020,RERA/AO/301/2020,RERA/CC/1064/2020,RERA/AO/310/2020, RERA/CC/1111/2020,RERA/AO/322/2020,RERA/CC/1144/2020,RERA/AO/330/2020,RERA/CC/1145/2020,RERA/AO/331/2020, RERA/CC/1216/2020,RERA/AO/339/2020,RERA/CC/1217/2020,RERA/AO/340/2020,RERA/CC/1234/2020,RERA/AO/347/2020, RERA/CC/1253/2020,RERA/AO/353/2020,RERA/CC/1306/2020,RERA/AO/376/2020,RERA/CC/1308/2020,RERA/AO/378/2020, Complainants : Sri Manoj Kant Sahay, Sri Nawin Kumar Sinha,Sri Raj Kumar Singh,Smt. Niru Sinha,Sri Saumya Singh, Smt. Swati Singh,Ms. Kumari Smita,Smt. Saroj Bala,Sri Hansraj Prasad,Sri Amit Kumar,Sri Bipul Kumar, Sri Shailendra Kumar Singh,Sri Alok Kumar Singh,Sri Amarjeet Kumar Chaudhary,Sri Dhirendra Kumar, Sri Amit Upadhyay,Smt. Vinita Kumari,Sri Kameshwar Ram,Ghanshyam Gupta,Sri MukeshwarNath, Smt. Jygyasa Kumari,Md. Nazrul, Sri Lala Prasad, Sri Nishi Kant, Sri Sunil Kumar,Sri Premchandra Kumar Jayaswal, Sri Sajjan Kumar, Sri Manoj Kumar, Ms.Pooja, Sri Kuldip Kumar, Smt. Smita Patel, Ms. Ankita Kumari, Sri Mukesh Tiwari, Smt. Ratna Pathak, Sri Girijesh Kumar, Smt. Kumari Nayantara, Sri Nirmal Kumar Singh, Sri DevendraNath, Smt. AnjuKumari, Smt. PunamSharma, Sri Bhabatram Ghosh, Sri Manoj Kumar, Sri Dilip Kumar, Sri Rajendra Singh, Sri Nishant Kumar Mishra, Sri Rajnish, Sri Swapnil Bhardwaj, Sri Rajat Prasad, Sri Yugal Kishor Singh, Sri Suman Kumar, Sri Rajesh Kumar Respondents : M/s Agrani Homes Pvt. Ltd.51
13 Jan 2021RERA/CC/699/2019, RERA/AO/174/2019, Complainant : Sri Ashish Kumar, Respondents : M/s Agrani Homes Pvt. Ltd.1
12 Jan 2021RERA/CC/1054/2020, RERA/AO/307/2020, Complainant : Smt. Chandana Sinha, Respondents : M/s Agrani Homes Pvt. Ltd.1
12 Jan 2021RERA/CC/698/2019, RERA/AO/173/2019, Complainant : Lina Ghosh, Respondents : M/s Agrani Homes Pvt. Ltd.1
08 Jan 2021RERA/CC/1540/2020, RERA/AO/509/2020, Complainant : Smt. Baby Devi, Respondents : M/s Star India Construction Pvt. Ltd.1
05 Jan 2021RERA/CC/583/2019, RERA/AO/149/2019, Complainant : Smt. Damayanti Devi, Respondents : M/S Ashwani Enterprises Pvt. Ltd.1
29 Dec 2020RERA/CC/1329/2020, RERA/AO/385/2020, Complainant : Smt. Neha Rani, Respondents : M/S Imperia Structures Ltd.1
28 Dec 2020RERA/CC/1295/2020, RERA/AO/370/2020, Complainant : Sri Binod Chaudhary, Respondents : M/s Ghar Lakshmi Buildcon Pvt. Ltd.1
16 Dec 2020RERA/CC/588/2019, RERA/AO/152/2019, Complainant : Sri Mohan Kumar, Respondents : M/s Agrani Homes Pvt. Ltd.1
15 Dec 2020RERA/CC/410/2019, RERA/AO/89/2019, Complainant : Smt. Gayatri Devi, Respondents : M/s Sona Akhilesh Construction and Developer Pvt. Ltd.1
27 Nov 2020RERA/CC/351/2019, RERA/AO/71/2019 , Complainant : Smt. Shashi Devi, Respondents : M/S Ashwani Enterprises Pvt. Ltd.1
26 Nov 2020RERA/CC/359/2019,RERA/AO/73/2019 Complainant : Sri Manish Kumar, Respondent : M/s Agrani Homes Pvt. Ltd1
24 Nov 2020RERA/CC/1293/2020, RERA/AO/368/2020, Complainant : Sri Bapi Rakshit, Respondents : M/s Ghar Lakshmi Buildcon Pvt. Ltd.1
24 Nov 2020RERA/CC/1294/2020, RERA/AO/369/2020, Complainant : Sri Dinesh Chandra Sah, Respondents : M/s Ghar Lakshmi Buildcon Pvt. Ltd.1
04 Nov 2020RERA/CC/161/2018, RERA/AO/21/2018, Complainant : Sri Achal Kumar, Respondents : M/s Agrani Homes Pvt. Ltd.1
02 Nov 2020RERA/CC/550/2019,RERA/AO/137/2019, Complainant : Sri Rahul Kumar Dokania, Respondents : M/s Green Homes Properties Pvt. Ltd.1
28 Oct 2020RERA/CC/538/2019,RERA/AO/133/2019, Complainant : Smt. Anamika, Respondents : M/s Vision Land Pvt. Ltd.1
21 Oct 2020RERA/CC/761/2019,RERA/AO/199/2019, Complainant : Sri Avinash Kumar, Respondents : M/s Agrani Homes Pvt. Ltd.1
19 Oct 2020RERA/CC/390/2019,RERA/AO/95/2019 , Complainants : Sri Dhananjay Kumar, Respondents : M/s Agrani Homes Pvt. Ltd. 1
13 Oct 2020RERA/CC/519/2019, RERA/AO/122/2019 , Complainant : Sri Akhilesh Kumar Mishra, Respondents : M/s Three Wings Builders Pvt. Ltd. 1
07 Oct 2020RERA/CC/954/2020, RERA/AO/269/2020, Complainant : Sri Raj Kumar Sinha, Respondents : M/s Nesh India Infrastructure Pvt.1
07 Oct 2020RERA/CC/953/202, RERA/AO/268/2020, Complainant : Sri Binod Kumar, Respondents : M/s Nesh India Infrastructure Pvt. Ltd.1
07 Oct 2020RERA/CC/955/2020, RERA/AO/270/2020, Complainant : Sri Sanjay Kumar Sinha, Respondents : M/s Nesh India Infrastructure Pvt. Ltd.1
01 Oct 2020RERA/CC/403/2019,RERA/AO/97/2019, Complainant : Sri Santosh Kumar Pathak, Respondents : M/s Agrani Homes Pvt. Ltd. 1
30 Sep 2020Case No.RERA/CC/762/AO/200/2019, RERA/CC/763/AO/201/2019, RERA/CC/773/AO/202/2019,RERA/CC/774/AO/203/2019, RERA/CC/775/AO/204/2019, RERA/CC/776/AO/205/2019, RERA/CC/777/AO/206/2019, RERA/CC/778/AO/207/2019, RERA/CC/779/AO/208/2019, RERA/CC/780/AO/209/2019, RERA/CC/781/AO/210/2019, RERA/CC/782/AO/211/2019 , RERA/CC/783/AO/212/2019, RERA/CC/784/AO/213/2019, RERA/CC/785/AO/214/2019, RERA/CC/786/AO/215/2019, RERA/CC/787/AO/216/2019, RERA/CC/789/AO/218/2019, RERA/CC/790/AO/219/2019, Complainants : Sri Bipin Bihari Singh, Satendra Kumar, Rewati Kumari, Sri Deepti Kumar, Sri Amit Ranjan, Satendra Singh, Smt Punam Kumari, Sri Vijay Kumar Sharma, Ranjit Kumar, Sri Satish Kumar, Smt. Vinita Mondal, Sri Md. Nasim Eqbal, Sri Mani Shekhar, Sri Rajeev Ranjan, Sri Narendra Kumar, Sri Ajit Kumar, Sri Manish Kumar, Sri Neeraj Kumar, Ms. Sweta Singh Respondents : M/s Agrani Homes Pvt. Ltd.19
25 Sep 2020Case No.RERA/CC/528/AO/125/2019, Complainant : Smt. Rita Sinha, Respondents : M/s Agrani Homes Pvt. Ltd., Patna1
25 Sep 2020RERA/CC/467/2019, RERA/AO/119/2019, RERA/CC/478/2019, RERA/AO/118/2019, RERA/CC/479/2019, RERA/AO/120/2019 , Complainant : Sri Irfan Sajid, Md. Moin Raza, Md. Irfan Sajid, Md. Quasim Akhtar, Respondents : Hyde Park Buildcon, Shital Buildtech Pvt. Ltd, 3
20 Mar 2020RERA/CC/314/2019 RERA/AO/47/2019 , Complainant : Sri Suresh Kumar, Respondents : Grih Vatika Homes Pvt. Ltd.1
20 Mar 2020RERA/CC/315/2019 RERA/AO/45/2019 , Complainant : Sri Suresh Chandra, Respondents : Grih Vatika Homes Pvt. Ltd.1
17 Mar 2020RERA/CC/164/2019 RERA/AO/22/2019, Complainant : Sri Krishna Singh, Respondents : Technoculture Building Centre Pvt. Ltd.1
03 Mar 2020RERA/CC/543/2019 RERA/AO/135/2019 , Complainant : Smt. Shanti Devi, Respondents : Agrani Homes Pvt. Ltd. 1
02 Mar 2020RERA/CC/527/2019 RERA/AO/123/2019 , Complainant : Sri Shashi Shekhar, Smt. Sushma Kumari, Respondents : DPM Infrastructure & Housing Pvt1
02 Mar 2020RERA/CC/529/2019 RERA/AO/124/2019 , Complainant : Sri Prakash Kumar, Respondents : DPM Infrastructure & Housing Pvt. 1
28 Feb 2020RERA/CC/388/2019 RERA/AO/85/2019, Complainant : Sri Akhilesh Kumar Maury, Respondents : Agrani Homes Real Marketing Pvt. Ltd.1
27 Feb 2020RERA/CC/398/2019 RERA/AO/87/2019 , Complainant : Sri Akhilesh Kumar, Respondents : Agrani Homes Pvt. Ltd.1
27 Feb 2020RERA/CC/448/2019 RERA/AO/105/2019 , Complainant : Sri Aniket Kumar, Respondents : Grih Arambh Developers Pvt. Ltd. 1
18 Feb 2020RERA/CC/451/2019 RERA/AO/107/2019 , Complainant : Sri Chandra Mohan Jha, Respondents : Grih Vatika Homes Pvt. Ltd.1
14 Feb 2020RERA/CC/257/2019 RERA/AO/50/2019 , Complainant : Sri Rajnish Ranjan Singh, Respondents : Princetone Sky Scrapers Pvt. Ltd.1
14 Feb 2020RERA/CC/539/2019 RERA/AO/132/2019 , Complainant : Smt. Kadambari Devi, Respondents : Maa Shaki Developers Pvt. Ltd.1
14 Feb 2020RERA/CC/536/2019 RERA/AO/131/2019, Complainant : Smt. Akriti Singh, Respondents : Lakhan Homes Ltd1
12 Feb 2020RERA/CC/285/2019 RERA/AO/130/2019 , Complainant : Sri Ramanand Jha, Respondents : Agrani Homes Pvt. Ltd.1
12 Feb 2020RERA/CC/395/2019 RERA/AO/86/2019 , Complainant : Sri Vijay Kumar, Respondents : Soho Infrastructure Pvt. Ltd1
12 Feb 2020RERA/CC/560/2019 RERA/AO/140/201 , Complainant : Smt. Anita Singh, Respondents : Soho Infrastructure Pvt. Ltd.1
10 Feb 2020RERA/CC/592/2019 RERA/AO/153/2019 ,Complainant : Smt. Ranju Kumari, Respondents : Agrani Homes Real Marketing Pvt. Ltd.1
10 Feb 2020RERA/CC/460/2019 RERA/AO/112/2019 ,Complainant : Sri Rabindra Singh, Respondents : Agrani Homes Real Services Pvt. Ltd.1
06 Feb 2020Case No- RERA/CC/182/2019 RERA/AO/38/2019, Complainant : Sri Bipin Kumar, Respondents : Agrani Homes Real Marketing Pvt. Ltd.1
06 Feb 2020Case No- RERA/CC/463/2019 RERA/AO/115/2019 , Complainant : Sri Arvind Kumar, Respondents : Star India Construction Pvt. Ltd.1
31 Jan 2020RERA/CC/447/2019 RERA/AO/103/2019 , Complainant : Smt. Nirmala Pandey, Respondents : Agrani Homes Pvt. Ltd.1
31 Jan 2020RERA/CC/324/2019 RERA/AO/58/2019 , Complainant : Mr. Suraj Kumar , Respondents : DPM Infrastructure & Housing Pvt. Ltd.1
31 Jan 2020RERA/CC/300/2019 RERA/AO/141/2019 , Complainant : Sri Alok Kumar , Respondents : DPM Infrastructure & Housing Pvt. Ltd1
17 Jan 2020RERA/CC/581/2019 RERA/AO/147/2019, Complainant : Urmila Kumari, Respondents :Technoculture Building Centre Pvt. Ltd1
17 Jan 2020RERA/CC/582/2019 RERA/AO/148/2019, Complainant : Sri Nand Kishore, Respondents :Technoculture Building Centre Pvt. Ltd1
17 Jan 2020RERA/CC/158/2019 RERA/AO/19/2019, Complainant : Smt. Pramila Mishra, Respondents : Technoculture Building Centre Pvt 1
16 Jan 2020RERA/CC/421/2019 RERA/AO/94/2019, Complainant : Smt. Madhavi Sinha, Respondents : Agrani Homes Real Service Pvt. Ltd.1
15 Jan 2020RERA/CC/586/2019 RERA/AO/151/2019 , Complainant : Dr. Shailendra Kumar , Respondents : Agrani Homes Pvt. Ltd. 1
10 Jan 2020RERA/CC/486/2019 RERA/AO/116/2019 ,Complainant : Sri Bikash Chandra Roy, Respondents : Agrani Homes Pvt. Ltd. 1
09 Jan 2020Case No. -RERA/CC/533/2019 RERA/AO/126/2019 , Complainant : Sri Sanjeev Singh Chauha, Respondents : Agrani Homes Pvt. Ltd1
31 Dec 2019Case No.RERA/CC/614/ AO/155/2019 , RERA/CC/615/ AO/156/2019,RERA/CC/616/ AO/157/2019,RERA/CC/617/ AO/158/2019,.RERA/CC/618/ AO/159/2019, RERA/CC/619/ AO/160/2019,RERA/CC/620/ AO/161/2019,RERA/CC/621/ AO/162/2019,RERA/CC/622/ AO/163/2019,RERA/CC/441/ AO/100/2019,RERA/CC/462/ AO/114/2019, Complainants : Smt. Puja Gupta, Sri Suresh Prasad,Sri Navneet Nishant, Sri Tripureshwar Prasad Sinha,Sri Saket Saurav,Sri Navin Kumar,Sri Baleshwar Pandit, Sri Jayveer Dutta Jha, Sri Chandan Kumr,Sri Chandan Kumar Sahu,Amarjit Kumar Chaudhary, Respondents: Agrani Homes Pvt. Ltd. 11
23 Dec 2019RERA/CC/184/2019 RERA/AO/40/2019 , Complainant : Bahadur Chaudhary, Respondents : Agrani Homes Pvt. Ltd. 1
23 Dec 2019RERA/CC/183/2019 RERA/AO/39/201 , Complainant : Sri Bishwanath Chaudhary, Respondents : Agrani Homes Pvt. Ltd.1
19 Dec 2019RERA/CC/371/2019 RERA/AO/76/2019 , Complainant : Sri Harish Kumar Srivastav, Respondents : Agrani Homes Pvt. Ltd. 1
27 Nov 2019RERA/CC/367/AO/74/2019 , Complainant : Dr. Sanjay Kumar, Respondents : Agrani Homes Pvt. Ltd1
18 Nov 2019Case No.RERA/CC/189/ AO/26/2019, Case No.RERA/CC/190/ AO/27/2019 , Case No.RERA/CC/191/ AO/28/2019 , Case No.RERA/CC/192/ AO/29/2019, Case No.RERA/CC/193/ AO/30/2019, Case No.RERA/CC/194/ AO/31/2019, Case No.RERA/CC/195/ AO/32/2019, Case No.RERA/CC/196/ AO/33/2019, Case No.RERA/CC/197/ AO/34/2019 , Case No.RERA/CC/198/ AO/35/2019, Case No.RERA/CC/199/ AO/36/2019, Case No.RERA/CC/200/ AO/37/2019, Case No.RERA/CC/440/ AO/99/2019, Case No.RERA/CC/442/ AO/101/2019, Case No.RERA/CC/443/ AO/102/2019, Complainants : Sri Niraj Kumar, Sri Deepak Kumar, Abhishek Kumar Jha, Sri Ram Pravesh Kumar, Sri Subhash Ranjan, Sri Bikash Kumar Jha, Smt. Chhabi Mishra, Sri Lakshman Kumar, Sri Satish Kumar, Sri Lokesh Chandra Jha, Sri AjendraJha, Sri Raju Kumar, Sri Kameshwar Ram, Sri Raj Kumar, Sri Saharsh Kumar Suman Respondents : Agrani Homes Pvt. Ltd. 15
11 Nov 2019Case No. RERA/CC/485/AO/117/2019, Complainant : Smt. Sabita Kumari, Respondents : Agrani Homes Pvt. Ltd 1
11 Nov 2019RERA/CC/416/AO/91/2019, Complainant : Sri Jai Prakash Narayan, Respondents : Technoculture Building Centre Pvt. Ltd. 1
27 Sep 2019RERA/CC/332/AO/61/2019, Complainant : Sri Niraj Kumar, Respondents : Raman & Kumar Construction Ltd. 1
27 Sep 2019RERA/CC/387/AO/84/2019, Complainant : Sri Kali Charan, Respondents : Lysin Engineer Pvt. Ltd. 1
25 Sep 2019RERA/CC/413/2019 RERA/AO/90/2019 , Complainant : Sri Arun Kumar , Respondents : Sai Shrinkhala Developers Pvt 1
19 Sep 2019Case No. -RERA/CC/84/AO/17/2018, Complainants : Sri Rahul Kishor Rai , Respondents : Agrani Homes Pvt. Ltd. 1
09 Sep 2019Case No- RERA/CC/320/AO/60/2019 , Complainant : Sri Aamir Rashid Khan , Respondents : Agrani Homes Real Services Pvt. Ltd.1
04 Sep 2019Case No. RERA/CC/346/AO/68/2019, Complainant : Sri Nagendra Singh, Respondent : Agrani Homes Real Construction Pvt. Ltd.1
30 Aug 2019Case No- RERA/CC/224/AO/42/2019, Complainant : Smt. Veena Jha, Respondents : ShailjaMultitechPvt. Ltd. 1
29 Aug 2019Case No -RERA/CC/368/AO/80/2019 , Complainant : Smt. Kanak Kumari, Respondent: DPM Infrastructure & Housing Pvt. Ltd.1
29 Aug 2019Case No- RERA/CC/296/AO/54/2019, Complainant : Smt. Rubi Kumari, Respondents : DPM Infrastructure & Housing Pvt Ltd1
29 Aug 2019Case No- RERA/CC/124/AO/12/2018, Complainant : Sri Mayank Chaudhary, Respondent: Agrani Home Pvt. Ltd1
26 Aug 2019Case No-RERA/CC/214/AO/41/2019 ,complainant(s) : Sri Sonu kumar, Respondent(s): Niwas Construction Pvt. Ltd1
07 Aug 2019Case No.-RERA/AO/66/2019, Complainant : Mrs. Archana Sharma., Respondent : Agrani Home Pvt. Ltd.1
02 Aug 2019Case No. RERA/AO/44/2019, Complainant : Smt. Anamika Tiwari, Respondent : Agrani Home Pvt. Ltd.1
01 Aug 2019Case No. RERA/AO/24/2018, Complainant : Sri Binay Jha, Respondent : DPM Infrastructure and Housing Pvt. Ltd.1
01 Aug 2019Case No. RERA/AO/24/2018, Compromise Petition , Complainant : Sri Binay Jha, Respondent : DPM Infrastructure and Housing Pvt. Ltd.1
31 Jul 2019Case No.- RERA/AO52/2019, complainant : Sri Brajesh Kuamr , Respondent : MS Newton Builders Pvt. Ltd1
25 Jul 2019Case No.-RERA/AO/56/62/63/2019, Complainant : Bharti Projedct Media and Infra Tech Pvt. Ltd., Sri Ram Kumar Sharma,Sri Abhishek Tiwari, Respondent : Sri Ram Kumar Sharma,Sri Nishant Kumar Singh, Bharti Projedct Media and Infra Tech Pvt. Ltd.,Bharti Projedct Media and Infra Tech Pvt.1
22 Jul 2019Case No.48/2019 Complainant(s) : 1.Sri Amar Deo Prasad, 2.Sri Jwala Rai, 3. Sri Mohan Kumar, 4. Sri Hriday Narayan Rai Respondent(s) : M/s Aastik Buildcon Pvt. Ltd1
05 Jul 2019Case No.23/2019 , Complainant : Sri Ramesh Kumar Singh, Respondent : M/s Agrani Homes Real Marketing Pvt. Ltd.1
14 Jun 2019 Case No.25/2019, Complainant: Sri Vidya Bhushan Jha, Krishi Vigyan Kendra, Kishanganj-855107. Respondent: M/s Techno Culture Building Centre Ltd., Sri Vinay Kumar Tiwari, Managing Director, 417/419, 4th Floor, Ashiana Tower, Exhibition Road, Patna-8000011
14 Jun 2019Case No.25/2019 COMPROMISE PETITION, Complainant:Vidya Bhushan Jha, Respondent: M/s Technoculture Building Centre Pvt.Ltd.1
21 May 2019Case No.11/2018 Dated on 21-05-2019, Complainant: Sri Rukmanand Singh, S/o Haribansh Narayan Singh, Vill+P.O.-Rampur, Via-Mahuwa, District Vaishali., Respondent: M/s Ashwani Enterprises Pvt. Ltd., through its Managing Director, Sri Ahwani Kumar Singh, G-01, Ashwani Enclave-II, Beside AIIMS, NH-98, Phulwarisharif, Patna-801505 1
21 May 2019Case No.11/2018 COMPROMISE PETITION Dated on 21-05-2019, Complainant: Sri Rukmanand Singh, Respondent: M/s Ashwini Enterprises Pvt. Ltd. Through : Sri Ashwani Kumar Singh. Project : “Ashwani Ganga Bihar”1
29 Apr 2019Case No- 43/2019 dated on 29-04-2019 by Adjudicating Officer, Complainant: Sri Sanjay Kumar, Respondent: M/s Sri Anuanand Construction Pvt.Ltd1
14 Mar 2019Case No- 10/2018 dated on 14-03-2019 by Adjudicating Officer1
14 Mar 2019Case No- 10/2018 dated on 14-03-2019 by Adjudicating Officer, Complainant: Sweta Kumari (2) Anjani kumar, Respondent: M/s Magadh Housing Through Its Directors 1
06 Mar 2019Case No- 09/2018 dated on 06-03-2019 by Adjudicating Officer, Complainant: 1. Prem Chandra Ram (2) Bhim Sen Respondet: M/s Media Construction Pvt. Ltd. through its Directors:- 1
03 Jan 2019Case No- 06/2018 dated on 03-01-2019 by Adjudicating Officer, Complainant: Mr. Mahesh Kumar Jha, Respondent: Agrani Homes Pvt. Ltd1
28 Dec 2018Case No- 07/2018 dated on 28-12-2018 by Adjudicating Officer1
27 Dec 2018Case No- 16/2018 dated on 27-12-2018 by Adjudicating Officer, Complainant: Mrs. Urmila Devi, Respondent: Agrani Homes Pvt. Ltd1
11 Dec 2018Case No- 4/2018 dated on 11-12-2018 by Adjudicating Officer, Complainant: Sri Ntish Kumar Singh, Respondent: M/s Technoculture Building Center Pvt. Ltd1
19 Nov 2018Case No- RERA/CC/33/2018 dated on 19-11-2018 by Adjudicating Officer, Complainant: Om Prakash Tiwary, Respondent: Pukhraj Developers Pvt. Ltd1
22 Oct 2018Case No-11/01/2018 dated on 22-10-2018 by Adjudicating Officer, Compainant: Amarendra Kumar Singh, Respondent: Geetanjali Realtech Pvt.Ltd1
Total Interim order's : 102
Date of NoticeDescription
08 Oct 2021Interim Order : Case No.RERACC/90/2018 /Execution case no -03/2019, Complainant : Raj Kumar, Respondent : M/s Agrani Homes Pvt. Ltd.
08 Oct 2021Interim Order : Case No.CC/59/2018/Execution case no-05/2019, Complainant : Manoranjan Prasad, Respondent : M/s Agrani Homes Pvt. Ltd.
08 Oct 2021Interim Order : Case No. RERA/CC/31/2018/Execution case no-02/2019, Complainant : Sarita Gupta, Respondent : M/s Agrani Homes Pvt. Ltd.
08 Oct 2021Interim Order : Case No.RERA/CC/28/2018/Execution case no-01/ 2019, Complainant : Madhu, Respondent : M/s Agrani Homes Pvt.Ltd.
08 Oct 2021Interim Order : Case No. RERA/CC/126/2018/Execution Case No-08/2019, Complainant : Nilu Kumari, Respondent : M/s Agrani Homes Pvt.Ltd.
08 Oct 2021Interim Order : Case No.ERA/CC/113/2018/Ex.Case No-14/2019, Complainant : Rajeev Kumar Panday, Respondent : M/s Agrani Homes Real Construction Pvt.Ltd.
14 Sep 2021INTERIM ORDER : Case No.CC/339/2021, Complainant : Milind Kumar Sinha, Respondent : M/s Shambhavi Buildcon Pvt Ltd
09 Apr 2021INTERIM ORDER : Case No. CC/645/2019, Complainant : Bijendra Kumar Singh, Respondent : M/s Jascon Enterbuild Ltd
09 Apr 2021Interim Order : Case No. CC/255/2019;CC/256/2019;CC/258/2019;259/2019;CC/260/2019;CC261/2019, Complainants : Binod Kumar Agarwal/Kalyani and Neeraj Kumar/Vidya Sagar Choudhary/Suryakant Kumar/Rajesh umar Jha/Dhanpat Ram Agarwal, Respondent : M/S Princeton Sky Scrapers Pvt. Ltd.
08 Apr 2021Interim Order : Case No.- CC/262/2019; CC/339/2019; CC/340/2019; CC347/2019 Complainants: Devanti Devi/Jeetendra/Manoj Kumar/Shkuntala Devi Respondene : M/S Galaxia Townshiip and Housing Pvt. Ltd.
05 Apr 2021INTERIM ORDER : Case No. CC/179/2018, Complainant : Kaushalya Devi, Respondent : M/s Arunendra Developers Pvt. Ltd.
01 Apr 2021INTERIM ORDER : Case No. SM/479/2021, M/s Youth Homes & Developers Pvt. Ltd.……………….………...Respondent
31 Mar 2021INTERIM ORDER : Case No. CC/1384/2020; CC/1385/2020, Complainant : Anamika Kumari/ Mr. Ravi Kishore & other , Respondent : M/s Sheba Welcon Builder Pvt. Ltd.
24 Mar 2021INTERIM ORDER : Case No. CC/706/2019; CC/849/2019; CC/1317/2020; CC/1375/2020; CC/1158/2020, Complainants : Rachna Dwivedi/ Navnit Kumar/ Tarique Jamil/ Retendra Kumar Sinha/ Amjad Ali, Respondent : M/s Grih Vatika Homes Pvt. Ltd
23 Mar 2021INTERIM ORDER : Case No. CC/129/2018, Complainant : Shashank Shekhar Pandey , Respondent : M/s Sahani Builders & Developers Pvt. Ltd.
19 Mar 2021INTERIM ORDER : Case No. CC/115/2018; CC/349/2019; CC/384/2019, Complainant : Dr Shivani Singh/ Sanjeev Kumar & Manish Kumar/ Alok Kumar Singh , Respondent : M/s Ramsuyash Projects & Marketing Pvt. Ltd
01 Mar 2021INTERIM ORDER : Case No. CC/734/2019; CC/1543/2020 & CC/1733/2020, Complainants : Sharmila Devi/ Seema Singh/ Ram Bhagwan Singh, Respondent : M/s Amina Construction Pvt. Ltd
26 Feb 2021INTERIM ORDER : Case No. SM/461/2020, Respondent : M/s Palvi Raj Construction Pvt. Ltd.
12 Nov 2020INTERIM ORDER : CC/101/2019, Complainant : Sudhir Kumar Dubey, Respondent : M/S Shambhavi Buildcon Pvt. Ltd.
04 Mar 2020INTERIM ORDER : Case No:- CC/101/2018, Complainant : Sudhir Kumar Dubey, Respondent : Shambhavi Buildcon Pvt. Ltd
03 Mar 2020INTERIM ORDER : Case No:- CC/16/2018, Complainant : Manendra kumar Sinha, Respondent : Gharaunda Construction Pvt. Ltd
03 Mar 2020INTERIM ORDER : Case No:- CC/303/2019, Complainant : Shakuntala Devi, Respondent : Phenomenal Projects Pvt.
28 Jan 2020INTERIM ORDER : Case No:- CC/436/2019, Complainant : Veena Sinha, Respondent : Patliputra Builders Pvt. Ltd
08 Jan 2020INTERIM ORDER : Case No- SM/296/2019, Swansgreen Estate Pvt. Ltd..................................................Respondent
23 Dec 2019PROCEEDING/INTERIM ORDER : Case No-RERA/ CC/407/2019, Complainants : Star India Construction Pvt ltd, Respondents : Mr. Shiv Narayan Yadav, Smt. Gulabo Devi, Mr. Ram Laddu Rai & Mr. Raj Kumar (Land Owners)
20 Nov 2019Interim order Case Nos. CC/102/2018, CC/105/2018, CC/106/2018, CC/114/2018, CC/124/2018, CC/152/2018 & CC/222/2019, Complainants : Renu Singh/Sambhavi Shandilya/RK David/Rashmi Singh/Deepak Kumar/Siddharth Singh/Sarla, Respondents : Utkarsh Infra Construction Pvt. Ltd
25 Oct 2019Interim order Case No. RERA/ CC/36/2018, CC/37/2018, CC/37/2018, CC/42/2018 & CC/93/2018 Complainant : Mukesh Kumar Sunny/Sheela Devi/Manish Prakash/Suman Chaturvedi/Sandeep Parasha, Responden : S.D. Construction & Developer
25 Oct 2019Interim order Case No. RERA/SM/355/2019. Responden : Dream Heaven Homes Pvt. Ltd.
21 Oct 2019Interim order Case No. RERA/ CC/221/2019, Complainant : Jagannath Mahto , Respondent : Varanya Construction Pvt Ltd
19 Oct 2019Interim order Case No.Case No. RERA/ CC/298/2019, CC/299/2019, Complainant : Kanta Singh & Lalmuni Devi , Respondent : Samrat City Infra Developers Pvt. Ltd
19 Oct 2019Interim orders Case No. RERA/ CC/178/2018, CC/290/2019 & CC/308/2019, Complainant : Subodh Jaiswal/ Raghani Ranjan/Shruti, Respondent : Realize Realcon Pvt Ltd
16 Oct 2019Interim order against Agrani group of company.
06 Aug 2019Interim orders Case No. SM/356/2019, Respondent : Lakhan Home Pvt. Ltd.
23 Jul 2019Interim orders Case No. RERA/CC/252/2019, Complainant : Alok Kumar, Respondent : Maa Vindhyavsani Developers
17 May 2019Interim orders Case No. CC/203/2018 Dated on 17-05-2019, Complainant: Bam Shankar Chaudhary, Respondent, M/s Agrani Homes Pvt. Ltd
14 May 2019Interim orders Case No. CC/05/2018 Dated on 14-05-2019, Complainant: Atmanand Jha, Respondent, M/s Pahi Construction Pvt. Ltd
04 Apr 2019Interim orders Case No. CC/85/2018 & CC/92/2018 Dated on 04-04-2019, Complainant: Birendra Kumar Singh, .Complainant:Archana Singh, Respondent, M/s Maurya Infratel Pvt. Ltd & Ors
03 Apr 2019Interim orders Case No. CC/115/2018 Dated on 03-04-2019, Complainant: Shivani Singh, Respondent, M/s Ramsuyash Projects & Marketing Pvt. Ltd. & Ors
11 Feb 2019Interim orders Case No. -CC/109/2018, Complainant: Ajay Nandan Sahay & 3 others, Respondent, M/s Ravi Ranjan Construction Pvt. Ltd
29 Jan 2019Interim orders against M/S Shin City Infra Project Pvt Ltd, Patna under section 36 of the Real estate (Regulation & Development) Act 2016
29 Jan 2019Interim orders Case No. SM/408/2018, SM/409/2018, SM/410/2018 & SM/411/2018, Respondent: M/s Shine City Infra Projects Pvt. Ltd
28 Jan 2019Interim orders against M/S Patligram Builders Pvt. Ltd, Patna under section 36 of the Real estate (Regulation & Development) Act 2016
28 Jan 2019Interim orders Case No. -SM/1002018, Respondent: M/s Patligram Builders Pvt. Ltd
06 Dec 2018Interim order of RERA(Real Estate Regulatory Authority, Bihar).